blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3420816

EP3420816 - ELECTRONIC RAT TRAP WITH INTERNAL BARRIER STRUCTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.03.2022
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  03.04.2021
FormerGrant of patent is intended
Status updated on  10.03.2021
FormerRequest for examination was made
Status updated on  16.02.2021
FormerGrant of patent is intended
Status updated on  23.11.2020
FormerRequest for examination was made
Status updated on  14.06.2019
FormerThe application has been published
Status updated on  30.11.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Woodstream Corporation
29 E. King Street
Lancaster, PA 17602 / US
[2021/18]
Former [2019/01]For all designated states
Woodstream Corporation
69 North Locust Street
Lititz PA 17543 / US
Inventor(s)01 / Kletzli, Paul Michael
5315 Oak Leaf Drive
Mount Joy, Pennsylvania 17552 / US
02 / Blair, Cory John
31 Todd Drive
Leighton, Pennsylvania 18235 / US
03 / Ebner, Mark William
833 Market Street
Lemoyne, Pennsylvania 17043 / US
 [2019/01]
Representative(s)Osterhoff, Utz
Bockermann Ksoll
Griepenstroh Osterhoff
Patentanwälte
Bergstraße 159
44791 Bochum / DE
[2019/01]
Application number, filing date18180545.828.06.2018
[2019/01]
Priority number, dateUS201762526521P29.06.2017         Original published format: US 201762526521 P
[2019/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3420816
Date:02.01.2019
Language:EN
[2019/01]
Type: B1 Patent specification 
No.:EP3420816
Date:05.05.2021
Language:EN
[2021/18]
Search report(s)(Supplementary) European search report - dispatched on:EP16.10.2018
ClassificationIPC:A01M23/38
[2019/01]
CPC:
A01M23/38 (EP,CN,US); A01M23/16 (EP,US); A01M2200/00 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/29]
Former [2019/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTRONISCHE RATTENFALLE MIT INTERNER BARRIERENSTRUKTUR[2019/01]
English:ELECTRONIC RAT TRAP WITH INTERNAL BARRIER STRUCTURE[2019/01]
French:PIÈGE DE RAT ÉLECTRONIQUE À STRUCTURE BARRIÈRE INTERNE[2019/01]
Examination procedure05.06.2019Amendment by applicant (claims and/or description)
05.06.2019Examination requested  [2019/29]
05.06.2019Date on which the examining division has become responsible
24.11.2020Communication of intention to grant the patent
16.02.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
11.03.2021Communication of intention to grant the patent
23.03.2021Fee for grant paid
23.03.2021Fee for publishing/printing paid
23.03.2021Receipt of the translation of the claim(s)
Opposition(s)08.02.2022No opposition filed within time limit [2022/15]
Fees paidRenewal fee
29.06.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.06.2018
AL05.05.2021
AT05.05.2021
CY05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
MK05.05.2021
MT05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
[2024/42]
Former [2024/23]HU28.06.2018
AL05.05.2021
AT05.05.2021
CY05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
MK05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2023/33]HU28.06.2018
AL05.05.2021
AT05.05.2021
CY05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2023/30]AL05.05.2021
AT05.05.2021
CY05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/29]AL05.05.2021
AT05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SI05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/26]AL05.05.2021
AT05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/23]AT05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/21]AT05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
CH30.06.2021
LI30.06.2021
BG05.08.2021
GR06.08.2021
PT06.09.2021
IS22.12.2021
Former [2022/18]AT05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
MC05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SK05.05.2021
SM05.05.2021
LU28.06.2021
BG05.08.2021
GR06.08.2021
PT06.09.2021
IS22.12.2021
Former [2022/10]AT05.05.2021
CZ05.05.2021
EE05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
GR06.08.2021
PT06.09.2021
IS22.12.2021
Former [2022/09]AT05.05.2021
CZ05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RO05.05.2021
RS05.05.2021
SK05.05.2021
SM05.05.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/07]AT05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RS05.05.2021
SM05.05.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2022/04]AT05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
NL05.05.2021
PL05.05.2021
RS05.05.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2021/52]AT05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
PL05.05.2021
RS05.05.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2021/51]AT05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
RS05.05.2021
BG05.08.2021
GR06.08.2021
IS05.09.2021
PT06.09.2021
Former [2021/50]AT05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
BG05.08.2021
GR06.08.2021
PT06.09.2021
Former [2021/49]AT05.05.2021
HR05.05.2021
LT05.05.2021
LV05.05.2021
BG05.08.2021
GR06.08.2021
Former [2021/46]AT05.05.2021
LT05.05.2021
BG05.08.2021
Documents cited:Search[XAI]EP1465482  (WOODSTREAM CORP [US], et al) [X] 1,2 * barrier 280b, electric plates 250b and 252b;; figure 14 * [A] 15[I] 3-14
by applicantUS6735899
 US7219466
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.