blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3428938

EP3428938 - NOISE FILTER AND NOISE REDUCTION UNIT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.12.2020
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  17.01.2020
FormerGrant of patent is intended
Status updated on  10.10.2019
FormerRequest for examination was made
Status updated on  14.12.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
YAZAKI CORPORATION
4-28 Mita 1-chome Minato-ku
Tokyo / JP
For all designated states
Toyota Jidosha Kabushiki Kaisha
1, Toyota-cho
Toyota-shi
Aichi-ken Aichi / JP
[2019/03]
Inventor(s)01 / IIZUKA, Hayato
c/o Yazaki Parts Co., Ltd., 653-2 Osaka
Kakegawa-shi, Shizuoka / JP
02 / KAYO, Kazuma
c/o Yazaki Parts Co., Ltd., 653-2 Osaka
Kakegawa-shi, Shizuoka / JP
03 / AIHARA, Hiroshi
c/o Toyota Jidosha Kabushiki Kaisha, 1
Toyota-cho
Toyota-shi, Aichi 471-8571 / JP
 [2019/03]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2019/03]
Application number, filing date18180738.929.06.2018
[2019/03]
Priority number, dateJP2017012760129.06.2017         Original published format: JP 2017127601
[2019/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3428938
Date:16.01.2019
Language:EN
[2019/03]
Type: B1 Patent specification 
No.:EP3428938
Date:19.02.2020
Language:EN
[2020/08]
Search report(s)(Supplementary) European search report - dispatched on:EP13.12.2018
ClassificationIPC:H01F17/04, H01F27/33
[2019/03]
CPC:
H01F27/33 (EP,US); H01F27/24 (CN); B60R16/0207 (US);
H01F17/04 (EP,US); H01F27/022 (US); H01F27/263 (US);
H01F27/2852 (US); H01F27/29 (US); H02P29/50 (US);
H03H1/00 (US); H03H7/427 (US); H03H2001/005 (US);
H03H2001/0092 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/03]
TitleGerman:RAUSCHFILTER UND RAUSCHUNTERDRÜCKUNGSEINHEIT[2019/03]
English:NOISE FILTER AND NOISE REDUCTION UNIT[2019/03]
French:FILTRE DE BRUIT ET UNITÉ DE RÉDUCTION DU BRUIT[2019/03]
Examination procedure29.06.2018Examination requested  [2019/03]
02.04.2019Date on which the examining division has become responsible
11.10.2019Communication of intention to grant the patent
09.01.2020Fee for grant paid
09.01.2020Fee for publishing/printing paid
09.01.2020Receipt of the translation of the claim(s)
Opposition(s)20.11.2020No opposition filed within time limit [2021/04]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.06.2018
AL19.02.2020
AT19.02.2020
CY19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
MK19.02.2020
MT19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
TR19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
IE29.06.2020
LU29.06.2020
BE30.06.2020
FR30.06.2020
PT12.07.2020
[2022/31]
Former [2022/30]HU29.06.2018
AL19.02.2020
AT19.02.2020
CY19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
MT19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
TR19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
IE29.06.2020
LU29.06.2020
BE30.06.2020
FR30.06.2020
PT12.07.2020
Former [2022/27]HU29.06.2018
AT19.02.2020
CY19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
MT19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
TR19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
IE29.06.2020
LU29.06.2020
BE30.06.2020
FR30.06.2020
PT12.07.2020
Former [2021/23]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
IE29.06.2020
LU29.06.2020
BE30.06.2020
FR30.06.2020
PT12.07.2020
Former [2021/20]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
IE29.06.2020
LU29.06.2020
PT12.07.2020
Former [2021/15]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
LU29.06.2020
PT12.07.2020
Former [2021/10]AT19.02.2020
CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
IT19.02.2020
LT19.02.2020
LV19.02.2020
MC19.02.2020
NL19.02.2020
PL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SI19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/50]CZ19.02.2020
DK19.02.2020
EE19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/49]CZ19.02.2020
DK19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SK19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/48]DK19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RO19.02.2020
RS19.02.2020
SE19.02.2020
SM19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
PT12.07.2020
Former [2020/47]DK19.02.2020
ES19.02.2020
FI19.02.2020
HR19.02.2020
LT19.02.2020
LV19.02.2020
NL19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
Former [2020/45]FI19.02.2020
HR19.02.2020
LV19.02.2020
NL19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
Former [2020/40]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
IS19.06.2020
Former [2020/39]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
BG19.05.2020
NO19.05.2020
GR20.05.2020
Former [2020/38]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
NO19.05.2020
GR20.05.2020
Former [2020/37]FI19.02.2020
HR19.02.2020
LV19.02.2020
RS19.02.2020
SE19.02.2020
NO19.05.2020
Former [2020/35]FI19.02.2020
NO19.05.2020
Documents cited:Search[A]DE102006005243  (TAMURA SEISAKUSHO KK [JP]) [A] 1-5 * paragraphs [0002] , [ 0003] , [ 0028] , [ 0035] * * figures 1, 2, 10 *;
 [A]WO2016143149  (MITSUBISHI ELECTRIC CORP [JP]) [A] 1-5 * abstract *;
 [A]DE102016224798  (YAZAKI CORP [JP], et al) [A] 1-5 * paragraphs [0002] , [ 0032] , [ 0042] , [ 0051] , [ 0057] ** figures 2, 12 *
by applicantJP2009135271
 JP2009206178
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.