| EP3428565 - LOOP HEAT PIPE AND METHOD OF MANUFACTURING LOOP HEAT PIPE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 04.09.2020 | ||
| Former | Grant of patent is intended Status updated on 18.03.2020 | ||
| Former | Request for examination was made Status updated on 21.06.2019 | ||
| Former | The application has been published Status updated on 14.12.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states SHINKO ELECTRIC INDUSTRIES CO., LTD. 80, Oshimada-machi Nagano-shi, Nagano 381-2287 / JP | [2020/30] |
| Former [2019/03] | For all designated states SHINKO ELECTRIC INDUSTRIES CO. LTD. 80, Oshimada-machi Nagano-shi Nagano 381-2287 / JP | Inventor(s) | 01 /
KURASHIMA, Nobuyuki c/o SHINKO ELECTRIC INDUSTRIES CO., LTD. 80,Oshimada-machi Nagano-shi, Nagano 381-2287 / JP | [2019/03] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2019/03] | Application number, filing date | 18182038.2 | 05.07.2018 | [2019/03] | Priority number, date | JP20170136150 | 12.07.2017 Original published format: JP 2017136150 | [2019/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3428565 | Date: | 16.01.2019 | Language: | EN | [2019/03] | Type: | B1 Patent specification | No.: | EP3428565 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.11.2018 | Classification | IPC: | F28D15/02, H01L23/427 | [2019/03] | CPC: |
F28D15/0266 (EP,US);
F28D15/046 (CN);
F28D15/0241 (EP,US);
F28D15/0275 (EP,US);
F28D15/043 (EP,US);
H10W40/037 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] |
| Former [2019/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHLAUFENWÄRMEROHR UND VERFAHREN ZUR HERSTELLUNG EINES SCHLAUFENWÄRMEROHRS | [2019/03] | English: | LOOP HEAT PIPE AND METHOD OF MANUFACTURING LOOP HEAT PIPE | [2019/03] | French: | CALODUC EN BOUCLE ET PROCÉDÉ DE FABRICATION D'UN CALODUC EN BOUCLE | [2019/03] | Examination procedure | 12.06.2019 | Amendment by applicant (claims and/or description) | 12.06.2019 | Examination requested [2019/30] | 12.06.2019 | Date on which the examining division has become responsible | 19.03.2020 | Communication of intention to grant the patent | 11.06.2020 | Fee for grant paid | 11.06.2020 | Fee for publishing/printing paid | 11.06.2020 | Receipt of the translation of the claim(s) | 19.08.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Request for further processing for: | 24.08.2020 | Request for further processing filed | 24.08.2020 | Full payment received (date of receipt of payment) Request granted | 02.09.2020 | Decision despatched | Fees paid | Renewal fee | 14.07.2020 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.07.2018 | AL | 07.10.2020 | AT | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | IT | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | MT | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | TR | 07.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | IE | 05.07.2021 | LU | 05.07.2021 | [2026/04] |
| Former [2024/42] | HU | 05.07.2018 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| MK | 07.10.2020 | ||
| MT | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| IE | 05.07.2021 | ||
| LU | 05.07.2021 | ||
| Former [2024/23] | HU | 05.07.2018 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| MK | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| IE | 05.07.2021 | ||
| LU | 05.07.2021 | ||
| Former [2023/33] | HU | 05.07.2018 | |
| AL | 07.10.2020 | ||
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| IE | 05.07.2021 | ||
| LU | 05.07.2021 | ||
| Former [2023/30] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CY | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| IE | 05.07.2021 | ||
| LU | 05.07.2021 | ||
| Former [2022/35] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| IE | 05.07.2021 | ||
| LU | 05.07.2021 | ||
| Former [2022/23] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| LU | 05.07.2021 | ||
| Former [2022/18] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| MC | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2022/10] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/50] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SI | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/48] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| IT | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/45] | AL | 07.10.2020 | |
| AT | 07.10.2020 | ||
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/37] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| DK | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/36] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| EE | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/35] | AT | 07.10.2020 | |
| CZ | 07.10.2020 | ||
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RO | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SK | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/33] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LT | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/32] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| SM | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/30] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| NL | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/28] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| HR | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/25] | AT | 07.10.2020 | |
| ES | 07.10.2020 | ||
| FI | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| PL | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| IS | 07.02.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/23] | AT | 07.10.2020 | |
| FI | 07.10.2020 | ||
| LV | 07.10.2020 | ||
| RS | 07.10.2020 | ||
| SE | 07.10.2020 | ||
| BG | 07.01.2021 | ||
| NO | 07.01.2021 | ||
| GR | 08.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/22] | FI | 07.10.2020 | |
| RS | 07.10.2020 | ||
| NO | 07.01.2021 | ||
| PT | 08.02.2021 | ||
| Former [2021/21] | FI | 07.10.2020 | |
| PT | 08.02.2021 | ||
| Former [2021/20] | FI | 07.10.2020 | Documents cited: | Search | [XAY] JP2011027321 (FUJITSU LTD et al.) | [XAY] TWM455152 (AURAS TECHNOLOGY CO LTD et al.) [X] 1,3,4 * figures 1-3 *[A] 5-9,11,13-15 [Y] 2,10,12 | [X] TW201508236 (ACER INC et al.) [X] 1 * figure 7 * | [X] US2016259383 (SHIOGA TAKESHI et al.) [X] 1 * figures 2,3 * | by applicant | WO2015087451 |