EP3460995 - POWER CONVERSION DEVICE AND SAFETY FUNCTION MODULE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.03.2023 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 08.04.2022 | ||
Former | Grant of patent is intended Status updated on 02.02.2022 | ||
Former | Examination is in progress Status updated on 24.02.2020 | ||
Former | Request for examination was made Status updated on 22.02.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states HITACHI INDUSTRIAL EQUIPMENT SYSTEMS CO., LTD. 3, Kanda Neribei-cho Chiyoda-ku Tokyo 101-0022 / JP | [2019/13] | Inventor(s) | 01 /
TANAKA, Makoto c/o Hitachi Industrial Equipment Systems Co., Ltd. 3, Kanda Neribei-cho, Chiyoda-ku Tokyo, 101-0022 / JP | [2019/13] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2019/13] | Application number, filing date | 18182510.0 | 09.07.2018 | [2019/13] | Priority number, date | JP20170179251 | 19.09.2017 Original published format: JP 2017179251 | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3460995 | Date: | 27.03.2019 | Language: | EN | [2019/13] | Type: | B1 Patent specification | No.: | EP3460995 | Date: | 11.05.2022 | Language: | EN | [2022/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.02.2019 | Classification | IPC: | H02P29/00, H02H3/00, H02P3/00 | [2019/13] | CPC: |
H02P29/00 (EP);
H02M7/42 (CN);
H02H3/00 (EP);
H02M7/537 (CN);
H02P27/085 (CN);
H02P3/00 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/13] | Title | German: | STROMWANDLUNGSVORRICHTUNG UND SICHERHEITSFUNKTIONSMODUL | [2019/13] | English: | POWER CONVERSION DEVICE AND SAFETY FUNCTION MODULE | [2019/13] | French: | DISPOSITIF DE CONVERSION DE PUISSANCE ET MODULE DE FONCTION DE SÉCURITÉ | [2019/13] | Examination procedure | deleted | Date on which the examining division has become responsible | 27.09.2018 | Examination requested [2019/13] | 25.09.2019 | Amendment by applicant (claims and/or description) | 26.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 26.05.2020 | Reply to a communication from the examining division | 02.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 18.12.2020 | Reply to a communication from the examining division | 04.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 13.07.2021 | Reply to a communication from the examining division | 03.02.2022 | Communication of intention to grant the patent | 30.03.2022 | Fee for grant paid | 30.03.2022 | Fee for publishing/printing paid | 30.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 14.02.2023 | No opposition filed within time limit [2023/16] | Fees paid | Renewal fee | 31.07.2020 | Renewal fee patent year 03 | 02.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.07.2018 | AL | 11.05.2022 | AT | 11.05.2022 | CY | 11.05.2022 | CZ | 11.05.2022 | DK | 11.05.2022 | EE | 11.05.2022 | ES | 11.05.2022 | FI | 11.05.2022 | HR | 11.05.2022 | LT | 11.05.2022 | LV | 11.05.2022 | MC | 11.05.2022 | MK | 11.05.2022 | NL | 11.05.2022 | PL | 11.05.2022 | RO | 11.05.2022 | RS | 11.05.2022 | SE | 11.05.2022 | SI | 11.05.2022 | SK | 11.05.2022 | SM | 11.05.2022 | IE | 09.07.2022 | LU | 09.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | BG | 11.08.2022 | GB | 11.08.2022 | NO | 11.08.2022 | GR | 12.08.2022 | IS | 11.09.2022 | PT | 12.09.2022 | [2024/23] |
Former [2024/20] | HU | 09.07.2018 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
GB | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2024/18] | HU | 09.07.2018 | |
AL | 11.05.2022 | ||
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
GB | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/47] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
GB | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/33] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
IE | 09.07.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/25] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
LU | 09.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/21] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
LU | 09.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/17] | AL | 11.05.2022 | |
AT | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/11] | AT | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/09] | AT | 11.05.2022 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
SM | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/07] | AT | 11.05.2022 | |
DK | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/51] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/50] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RS | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/49] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/48] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
NL | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/47] | AT | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | Documents cited: | Search | [XY]EP2911968 (INVENTIO AG [CH]) [X] 1,6,10,11 * page 2, column 2, line 5, paragraph 0006 - page 2, column 2, line 38, paragraph 007; figures 2-3; claim 1 * * page 6, column 9, line 31, paragraph 0035 - page 6, column 9, line 40, paragraph 0035 * * page 2, column 1, line 13, paragraph 0002 - page 2, column 1, line 28, paragraph 0002 * * page 5, column 7, line 42, paragraph 0029 - page 5, column 7, line 58, paragraph 0029 * [Y] 2,3,5,7,9; | [Y]US2016118212 (VEIL RICHARD [DE], et al) [Y] 3,7 * page 6, column 2, paragraph 0074 - page 7, column 1, paragraph 0080; figures 3, 4, 5 *; | [Y]US9602028 (HENSEL UWE [DE], et al) [Y] 2,5,9 * page 5, column 2, line 16 - page 5, column 2, line 62; figures 1-2; claim 1 * * page 6, column 3, line 53 - page 6, column 4, line 7 *; | [XP]EP3220539 (OMRON TATEISI ELECTRONICS CO [JP]) [XP] 1,4,6,8 * page 2, column 1, line 48, paragraph 0006 - page 2, column 2, line 9, paragraph 0007; figures 1, 2A, 2B; claim 1 * * page 2, column 1, line 10, paragraph 0002 - page 2, column 1, line 21, paragraph 0002 ** page 3, column 3, line 36, paragraph 0018 - page 3, column 3, line 43, paragraph 0018 * | by applicant | JP2011008642 | JP2011229359 |