blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3460995

EP3460995 - POWER CONVERSION DEVICE AND SAFETY FUNCTION MODULE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.03.2023
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  08.04.2022
FormerGrant of patent is intended
Status updated on  02.02.2022
FormerExamination is in progress
Status updated on  24.02.2020
FormerRequest for examination was made
Status updated on  22.02.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
HITACHI INDUSTRIAL EQUIPMENT SYSTEMS CO., LTD.
3, Kanda Neribei-cho
Chiyoda-ku
Tokyo 101-0022 / JP
[2019/13]
Inventor(s)01 / TANAKA, Makoto
c/o Hitachi Industrial Equipment Systems Co., Ltd.
3, Kanda Neribei-cho, Chiyoda-ku
Tokyo, 101-0022 / JP
 [2019/13]
Representative(s)MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Strasse 29
80336 München / DE
[2019/13]
Application number, filing date18182510.009.07.2018
[2019/13]
Priority number, dateJP2017017925119.09.2017         Original published format: JP 2017179251
[2019/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3460995
Date:27.03.2019
Language:EN
[2019/13]
Type: B1 Patent specification 
No.:EP3460995
Date:11.05.2022
Language:EN
[2022/19]
Search report(s)(Supplementary) European search report - dispatched on:EP21.02.2019
ClassificationIPC:H02P29/00, H02H3/00, H02P3/00
[2019/13]
CPC:
H02P29/00 (EP); H02M7/42 (CN); H02H3/00 (EP);
H02M7/537 (CN); H02P27/085 (CN); H02P3/00 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/13]
TitleGerman:STROMWANDLUNGSVORRICHTUNG UND SICHERHEITSFUNKTIONSMODUL[2019/13]
English:POWER CONVERSION DEVICE AND SAFETY FUNCTION MODULE[2019/13]
French:DISPOSITIF DE CONVERSION DE PUISSANCE ET MODULE DE FONCTION DE SÉCURITÉ[2019/13]
Examination proceduredeletedDate on which the examining division has become responsible
27.09.2018Examination requested  [2019/13]
25.09.2019Amendment by applicant (claims and/or description)
26.02.2020Despatch of a communication from the examining division (Time limit: M04)
26.05.2020Reply to a communication from the examining division
02.10.2020Despatch of a communication from the examining division (Time limit: M04)
18.12.2020Reply to a communication from the examining division
04.03.2021Despatch of a communication from the examining division (Time limit: M04)
13.07.2021Reply to a communication from the examining division
03.02.2022Communication of intention to grant the patent
30.03.2022Fee for grant paid
30.03.2022Fee for publishing/printing paid
30.03.2022Receipt of the translation of the claim(s)
Opposition(s)14.02.2023No opposition filed within time limit [2023/16]
Fees paidRenewal fee
31.07.2020Renewal fee patent year 03
02.08.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.07.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
[2024/23]
Former [2024/20]HU09.07.2018
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2024/18]HU09.07.2018
AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/47]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
GB11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/33]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
IE09.07.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/25]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
LU09.07.2022
BE31.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/21]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
LU09.07.2022
CH31.07.2022
LI31.07.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/17]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/11]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/09]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/07]AT11.05.2022
DK11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/51]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/50]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/49]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/48]AT11.05.2022
ES11.05.2022
FI11.05.2022
LT11.05.2022
NL11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Former [2022/47]AT11.05.2022
ES11.05.2022
FI11.05.2022
LT11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Documents cited:Search[XY]EP2911968  (INVENTIO AG [CH]) [X] 1,6,10,11 * page 2, column 2, line 5, paragraph 0006 - page 2, column 2, line 38, paragraph 007; figures 2-3; claim 1 * * page 6, column 9, line 31, paragraph 0035 - page 6, column 9, line 40, paragraph 0035 * * page 2, column 1, line 13, paragraph 0002 - page 2, column 1, line 28, paragraph 0002 * * page 5, column 7, line 42, paragraph 0029 - page 5, column 7, line 58, paragraph 0029 * [Y] 2,3,5,7,9;
 [Y]US2016118212  (VEIL RICHARD [DE], et al) [Y] 3,7 * page 6, column 2, paragraph 0074 - page 7, column 1, paragraph 0080; figures 3, 4, 5 *;
 [Y]US9602028  (HENSEL UWE [DE], et al) [Y] 2,5,9 * page 5, column 2, line 16 - page 5, column 2, line 62; figures 1-2; claim 1 * * page 6, column 3, line 53 - page 6, column 4, line 7 *;
 [XP]EP3220539  (OMRON TATEISI ELECTRONICS CO [JP]) [XP] 1,4,6,8 * page 2, column 1, line 48, paragraph 0006 - page 2, column 2, line 9, paragraph 0007; figures 1, 2A, 2B; claim 1 * * page 2, column 1, line 10, paragraph 0002 - page 2, column 1, line 21, paragraph 0002 ** page 3, column 3, line 36, paragraph 0018 - page 3, column 3, line 43, paragraph 0018 *
by applicantJP2011008642
 JP2011229359
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.