Extract from the Register of European Patents

EP About this file: EP3407524

EP3407524 - WIRELESS COMMUNICATION TERMINAL DEVICE, WIRELESS COMMUNICATION BASE STATION DEVICE, AND RESOURCE REGION SETTING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.03.2021
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  27.03.2020
FormerGrant of patent is intended
Status updated on  14.11.2019
FormerRequest for examination was made
Status updated on  26.10.2018
Most recent event   Tooltip19.12.2025Lapse of the patent in a contracting state
New state(s): TR
published on 21.01.2026  [2026/04]
Applicant(s)For all designated states
Sun Patent Trust
437 Madison Avenue, 35th Floor
New York, NY 10022 / US
[2018/48]
Inventor(s)01 / NISHIO, Akihiko
c/o Panasonic Intellectual Property Management
Co., Ltd.
1-61, Shiromi 2-chome, Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
02 / NAKAO, Seigo
c/o Panasonic Intellectual Property Management
Co., Ltd.
1-61, Shiromi 2-chome, Chuo-ku
Osaka-shi, Osaka 540-6207 / JP
 [2018/48]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2018/48]
Application number, filing date18183412.815.03.2010
[2018/48]
Priority number, dateJP2009006303116.03.2009         Original published format: JP 2009063031
[2018/48]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3407524
Date:28.11.2018
Language:EN
[2018/48]
Type: B1 Patent specification 
No.:EP3407524
Date:29.04.2020
Language:EN
[2020/18]
Search report(s)(Supplementary) European search report - dispatched on:EP03.09.2018
ClassificationIPC:H04L5/00, H04L27/26, H04W72/08
[2018/48]
CPC:
H04L5/001 (EP,KR,US); H04L5/0055 (EP,KR,US); H04W72/542 (EP,US);
H04L27/2634 (EP,US); H04L27/26524 (EP,US); H04W4/06 (EP);
H04W72/0453 (KR); H04L5/0016 (EP,US); H04W72/21 (KR) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2018/48]
TitleGerman:DRAHTLOSKOMMUNIKATIONSENDGERÄTEVORRICHTUNG, DRAHTLOSKOMMUNIKATIONBASISSTATIONSVORRICHTUNG UND RESSOURCENBEREICHEINSTELLVERFAHREN[2018/48]
English:WIRELESS COMMUNICATION TERMINAL DEVICE, WIRELESS COMMUNICATION BASE STATION DEVICE, AND RESOURCE REGION SETTING METHOD[2018/48]
French:DISPOSITIF DE TERMINAL DE COMMUNICATION SANS FIL, DISPOSITIF DE STATION DE BASE DE COMMUNICATION SANS FIL ET PROCÉDÉ DE RÉGLAGE DE RÉGION RESSOURCE[2018/48]
Examination procedure13.07.2018Examination requested  [2018/48]
15.03.2019Amendment by applicant (claims and/or description)
15.03.2019Date on which the examining division has become responsible
15.11.2019Communication of intention to grant the patent
05.03.2020Fee for grant paid
05.03.2020Fee for publishing/printing paid
05.03.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP10753283.0  / EP2410804
Divisional application(s)EP20160174.7  / EP3678391
Opposition(s)01.02.2021No opposition filed within time limit [2021/14]
Fees paidRenewal fee
13.07.2018Renewal fee patent year 03
13.07.2018Renewal fee patent year 04
13.07.2018Renewal fee patent year 05
13.07.2018Renewal fee patent year 06
13.07.2018Renewal fee patent year 07
13.07.2018Renewal fee patent year 08
13.07.2018Renewal fee patent year 09
26.03.2019Renewal fee patent year 10
24.03.2020Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2010
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
TR29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
[2026/04]
Former [2024/42]HU15.03.2010
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
MT29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2024/23]HU15.03.2010
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
MK29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/33]HU15.03.2010
AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2023/24]AT29.04.2020
CY29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/45]AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
MC29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/24]AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SI29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/10]AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
PL29.04.2020
RO29.04.2020
SE29.04.2020
SK29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/09]AT29.04.2020
CZ29.04.2020
DK29.04.2020
EE29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
IT29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/08]DK29.04.2020
ES29.04.2020
FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
RO29.04.2020
SE29.04.2020
SM29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/04]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
NL29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2021/01]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
BG29.07.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/50]FI29.04.2020
HR29.04.2020
LT29.04.2020
LV29.04.2020
SE29.04.2020
NO29.07.2020
GR30.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/48]FI29.04.2020
LT29.04.2020
SE29.04.2020
NO29.07.2020
IS29.08.2020
PT31.08.2020
Former [2020/47]LT29.04.2020
NO29.07.2020
IS29.08.2020
Former [2020/46]IS29.08.2020
Documents cited:Search[A]   LG ELECTRONICS: "PUCCH ACK/NACK configuration and CCE index mapping", 3GPP DRAFT; R1-081003 CCE INDEX TO ACKNACK MAPPING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Sorrento, Italy; 20080205, 5 February 2008 (2008-02-05), XP050109469
 [A]   HUAWEI: "PUCCH Resource Allocation for ACK/NACK Repetition", 3GPP DRAFT; R1-082355, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Warsaw, Poland; 20080624, 24 June 2008 (2008-06-24), XP050110647
 [A]   "Modification on Number of OFDM symbols for Control part", 3GPP DRAFT; R4-082207, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG4, no. Jeju; 20080826, 26 August 2008 (2008-08-26), XP050180688
by applicant  "Physical Channels and Modulation (Release 8", 3GPP TS 36.211, May 2008 (2008-05-01)
   "Multiplexing and channel coding (Release 8", 3GPP TS 36.212, May 2008 (2008-05-01)
   "Physical layer procedures (Release 8", 3GPP TS 36.213, May 2008 (2008-05-01)
   "Carrier aggregation LTE-Advanced", 3GPP TSG RAN WG1 MEETING, RL-082468, July 2008 (2008-07-01)
   "DL/UL Asymmetric Carrier aggregation", 3GPP TSG RAN WG1 MEETING, RI-083706, September 2008 (2008-09-01)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.