blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3438447

EP3438447 - PROVIDING CONTROL POWER DURING THE OPERATION OF A REGENERATIVE POWER GENERATION UNIT, IN PARTICULAR WIND TURBINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.04.2024
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  05.05.2023
FormerGrant of patent is intended
Status updated on  15.12.2022
FormerExamination is in progress
Status updated on  06.04.2020
FormerRequest for examination was made
Status updated on  09.08.2019
FormerThe application has been published
Status updated on  04.01.2019
Most recent event   Tooltip12.07.2024Lapse of the patent in a contracting state
New state(s): IE
published on 14.08.2024 [2024/33]
Applicant(s)For all designated states
Siemens Gamesa Renewable Energy Service GmbH
Beim Strohhause 17-31
20097 Hamburg / DE
[2022/04]
Former [2019/06]For all designated states
Senvion GmbH
Überseering 10
22297 Hamburg / DE
Inventor(s)01 / Geisler, Jens
Waldstraße 28a
24768 Rendsburg / DE
 [2019/06]
Representative(s)Glawe, Delfs, Moll
Partnerschaft mbB von
Patent- und Rechtsanwälten
Postfach 13 03 91
20103 Hamburg / DE
[2019/06]
Application number, filing date18186257.430.07.2018
[2019/06]
Priority number, dateDE2017100713231.07.2017         Original published format: DE102017007132
[2019/06]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3438447
Date:06.02.2019
Language:DE
[2019/06]
Type: B1 Patent specification 
No.:EP3438447
Date:07.06.2023
Language:DE
[2023/23]
Search report(s)(Supplementary) European search report - dispatched on:EP29.11.2018
ClassificationIPC:F03D7/02, F03D7/04, H02J3/38
[2019/06]
CPC:
F03D7/0284 (EP,US); H02J3/382 (CN); F03D7/028 (US);
F03D9/257 (US); G05B19/04 (US); G06Q10/0631 (CN);
G06Q50/06 (CN); H02J3/38 (US); H02J3/381 (EP,US);
H02J3/386 (CN); H02J3/46 (EP,US); F05B2260/84 (EP,US);
F05B2270/1033 (EP,CN,US); F05B2270/32 (EP,US); F05B2270/321 (EP,US);
F05B2270/335 (EP,US); G05B2219/2619 (US); H02J2300/28 (EP,US);
Y02E10/72 (EP); Y02E10/76 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/37]
Former [2019/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BEREITSTELLEN VON REGELLEISTUNG BEIM BETRIEB EINER REGENERATIVEN STROMERZEUGUNGSEINHEIT, INSBESONDERE WINDENERGIEANLAGE[2019/06]
English:PROVIDING CONTROL POWER DURING THE OPERATION OF A REGENERATIVE POWER GENERATION UNIT, IN PARTICULAR WIND TURBINE[2019/06]
French:FOURNITURE DE PUISSANCE DE RÉGULATION LORS DU FONCTIONNEMENT D'UNE UNITÉ DE PRODUCTION D'ÉNERGIE RENOUVELABLE, EN PARTICULIER D'UNE ÉOLIENNE[2019/06]
Examination procedure06.08.2019Amendment by applicant (claims and/or description)
06.08.2019Examination requested  [2019/37]
06.08.2019Date on which the examining division has become responsible
09.04.2020Despatch of a communication from the examining division (Time limit: M06)
09.09.2020Reply to a communication from the examining division
12.10.2022Cancellation of oral proceeding that was planned for 12.10.2022
12.10.2022Date of oral proceedings (cancelled)
16.12.2022Communication of intention to grant the patent
26.04.2023Fee for grant paid
26.04.2023Fee for publishing/printing paid
26.04.2023Receipt of the translation of the claim(s)
Divisional application(s)EP23177571.9  / EP4236004
Opposition(s)08.03.2024No opposition filed within time limit [2024/20]
Fees paidRenewal fee
22.07.2020Renewal fee patent year 03
22.07.2021Renewal fee patent year 04
20.07.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
IT07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
IE30.07.2023
LU30.07.2023
BE31.07.2023
CH31.07.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
[2024/33]
Former [2024/26]CZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
IT07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
LU30.07.2023
BE31.07.2023
CH31.07.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
Former [2024/24]CZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SI07.06.2023
SK07.06.2023
SM07.06.2023
LU30.07.2023
BE31.07.2023
CH31.07.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
Former [2024/18]CZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
LU30.07.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
Former [2024/16]CZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
MC07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
Former [2024/10]CZ07.06.2023
EE07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
PL07.06.2023
RO07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
PT09.10.2023
Former [2024/09]CZ07.06.2023
ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
GR08.09.2023
IS07.10.2023
Former [2024/08]ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
SK07.06.2023
SM07.06.2023
NO07.09.2023
GR08.09.2023
Former [2024/03]ES07.06.2023
FI07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2024/01]ES07.06.2023
HR07.06.2023
LT07.06.2023
LV07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2023/51]ES07.06.2023
HR07.06.2023
RS07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2023/50]ES07.06.2023
SE07.06.2023
NO07.09.2023
GR08.09.2023
Former [2023/48]ES07.06.2023
SE07.06.2023
NO07.09.2023
Former [2023/46]ES07.06.2023
Documents cited:Search[A]DE102010014165  (REPOWER SYSTEMS AG [DE]) [A] 1-16 * paragraphs [0020] , [0045] *;
 [XY]DE102012215565  (ENERGY & METEO SYSTEMS GMBH [DE], et al) [X] 1-11,13-16 * the whole document * [Y] 12;
 [A]DE102013215396  (WOBBEN PROPERTIES GMBH [DE]) [A] 1-16* paragraphs [0007] - [0016] - [0034] - [0052] *;
 [Y]DE102015114958  (WOBBEN PROPERTIES GMBH [DE]) [Y] 12 * paragraphs [0002] - [0005] - [0023] - [0034] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.