EP3471474 - PHYSICAL DOWNLINK CONTROL CHANNEL TRANSMISSION METHOD, BASE STATION DEVICE, AND USER EQUIPMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.01.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 28.01.2022 | ||
Former | Grant of patent is intended Status updated on 28.09.2021 | ||
Former | Examination is in progress Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 23.03.2021 | ||
Former | Examination is in progress Status updated on 08.05.2020 | ||
Former | Request for examination was made Status updated on 15.03.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/16] | Inventor(s) | 01 /
ZHANG, Xiangdong c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 02 /
YU, Zheng c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 03 /
XIA, Jinhuan c/o Huawei Technologies Co., Ltd. Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2019/16] | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2019/16] | Application number, filing date | 18186748.2 | 07.11.2014 | [2019/16] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3471474 | Date: | 17.04.2019 | Language: | EN | [2019/16] | Type: | B1 Patent specification | No.: | EP3471474 | Date: | 02.03.2022 | Language: | EN | [2022/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.01.2019 | Classification | IPC: | H04W72/04, H04L5/00, // H04W74/08 | [2021/10] | CPC: |
H04L5/0053 (EP,KR);
H04L5/0092 (KR);
H04W72/23 (EP,US);
H04L5/0007 (KR);
H04L5/0094 (EP);
H04W74/0833 (US);
|
Former IPC [2019/16] | H04W72/04, H04W74/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/16] | Title | German: | VERFAHREN ZUR PHYSICAL-DOWNLINK-CONTROL-CHANNEL-ÜBERTRAGUNG, BASISSTATIONSVORRICHTUNG UND BENUTZERGERÄT | [2019/16] | English: | PHYSICAL DOWNLINK CONTROL CHANNEL TRANSMISSION METHOD, BASE STATION DEVICE, AND USER EQUIPMENT | [2019/16] | French: | PROCÉDÉ DE TRANSMISSION DE CANAL DE COMMANDE DE LIAISON DESCENDANTE PHYSIQUE, DISPOSITIF DE STATION DE BASE ET ÉQUIPEMENT UTILISATEUR | [2019/16] | Examination procedure | deleted | Date on which the examining division has become responsible | 01.08.2018 | Examination requested [2019/16] | 17.10.2019 | Amendment by applicant (claims and/or description) | 12.05.2020 | Despatch of a communication from the examining division (Time limit: M03) | 03.08.2020 | Reply to a communication from the examining division | 24.03.2021 | Communication of intention to grant the patent | 17.06.2021 | Fee for grant paid | 17.06.2021 | Fee for publishing/printing paid | 30.07.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 29.09.2021 | Communication of intention to grant the patent | 26.01.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14905547.7 / EP3209050 | Opposition(s) | 05.12.2022 | No opposition filed within time limit [2023/06] | Fees paid | Renewal fee | 01.08.2018 | Renewal fee patent year 03 | 01.08.2018 | Renewal fee patent year 04 | 28.11.2018 | Renewal fee patent year 05 | 27.11.2019 | Renewal fee patent year 06 | 27.11.2020 | Renewal fee patent year 07 | 29.11.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.11.2014 | AL | 02.03.2022 | AT | 02.03.2022 | CY | 02.03.2022 | CZ | 02.03.2022 | DK | 02.03.2022 | EE | 02.03.2022 | ES | 02.03.2022 | FI | 02.03.2022 | HR | 02.03.2022 | IT | 02.03.2022 | LT | 02.03.2022 | LV | 02.03.2022 | MC | 02.03.2022 | MK | 02.03.2022 | NL | 02.03.2022 | PL | 02.03.2022 | RO | 02.03.2022 | RS | 02.03.2022 | SE | 02.03.2022 | SI | 02.03.2022 | SK | 02.03.2022 | SM | 02.03.2022 | TR | 02.03.2022 | BG | 02.06.2022 | NO | 02.06.2022 | GR | 03.06.2022 | IS | 02.07.2022 | PT | 04.07.2022 | IE | 07.11.2022 | LU | 07.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | FR | 30.11.2022 | LI | 30.11.2022 | [2024/29] |
Former [2024/27] | HU | 07.11.2014 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CY | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
MK | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 07.11.2022 | ||
LU | 07.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | HU | 07.11.2014 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CY | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 07.11.2022 | ||
LU | 07.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 07.11.2014 | |
AL | 02.03.2022 | ||
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 07.11.2022 | ||
LU | 07.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/52] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 07.11.2022 | ||
LU | 07.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 07.11.2022 | ||
LU | 07.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
IE | 07.11.2022 | ||
LU | 07.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
LU | 07.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
IT | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
MC | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/10] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SI | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/07] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
DK | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2023/01] | AL | 02.03.2022 | |
AT | 02.03.2022 | ||
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/51] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
IS | 02.07.2022 | ||
PT | 04.07.2022 | ||
Former [2022/49] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SK | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/48] | AT | 02.03.2022 | |
CZ | 02.03.2022 | ||
EE | 02.03.2022 | ||
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/47] | AT | 02.03.2022 | |
ES | 02.03.2022 | ||
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RO | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
SM | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
PT | 04.07.2022 | ||
Former [2022/44] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
NL | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/39] | ES | 02.03.2022 | |
FI | 02.03.2022 | ||
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/36] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
LV | 02.03.2022 | ||
PL | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
GR | 03.06.2022 | ||
Former [2022/35] | ES | 02.03.2022 | |
HR | 02.03.2022 | ||
LT | 02.03.2022 | ||
RS | 02.03.2022 | ||
SE | 02.03.2022 | ||
BG | 02.06.2022 | ||
NO | 02.06.2022 | ||
Former [2022/34] | ES | 02.03.2022 | |
LT | 02.03.2022 | ||
NO | 02.06.2022 | ||
Former [2022/33] | LT | 02.03.2022 | |
NO | 02.06.2022 | Documents cited: | Search | [A]US2013083749 (XU HAO [US], et al) [A] 1-15* paragraphs [0069] - [0075] *; | [A]US2013242882 (BLANKENSHIP YUFEI WU [US], et al) [A] 1-15 * paragraphs [0103] - [0118] *; | [A]EP2683098 (LG ELECTRONICS INC [KR]) [A] 1-15 * Section 4; paragraphs [0011] , [ 104] , [0107] - [0119] *; | [E]EP3013010 (HUAWEI TECH CO LTD [CN]) [E] 1,4,7,11,15 * claims 1-7 *; | [A] - KT CORP, "Considerations on common control messages", vol. RAN WG1, no. Ljubljana, Slovenia; 20141006 - 20141010, (20140927), 3GPP DRAFT; R1-144251, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_78b/Docs/, (20140927), XP050869880 [A] 1-15 * Sections 2 and 4 * |