blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3467257

EP3467257 - VANE PLATFORM COOLING SYSTEM AND METHOD [Right-click to bookmark this link]
Former [2019/15]VANE PLATFORM COOLING STRUCTURESPLATFORM
[2020/20]
StatusNo opposition filed within time limit
Status updated on  11.02.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  05.03.2021
FormerGrant of patent is intended
Status updated on  20.10.2020
FormerRequest for examination was made
Status updated on  22.08.2020
FormerGrant of patent is intended
Status updated on  06.05.2020
FormerRequest for examination was made
Status updated on  11.10.2019
FormerThe application has been published
Status updated on  08.03.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Raytheon Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2021/12]
Former [2019/15]For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
Inventor(s)01 / PROPHETER-HINCKLEY, Tracy A.
44 Oak Forest Drive
Manchester, CT 06042 / US
02 / SURACE, Raymond
319 Connecticut Avenue
Newington, CT 06111 / US
 [2019/15]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2021/14]
Former [2019/15]Dehns
St. Brides House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date18186880.301.08.2018
[2019/15]
Priority number, dateUS20171572781609.10.2017         Original published format: US201715727816
[2019/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3467257
Date:10.04.2019
Language:EN
[2019/15]
Type: B1 Patent specification 
No.:EP3467257
Date:07.04.2021
Language:EN
[2021/14]
Search report(s)(Supplementary) European search report - dispatched on:EP04.01.2019
ClassificationIPC:F01D5/14, F01D5/18
[2019/15]
CPC:
F01D5/141 (EP,US); F01D25/12 (US); F01D5/147 (EP,US);
F01D5/186 (EP,US); F01D5/187 (EP,US); F01D9/041 (US);
F02C7/18 (US); F23R3/002 (US); F05D2220/32 (US);
F05D2230/10 (US); F05D2230/21 (US); F05D2240/35 (US);
F05D2240/81 (EP,US); F05D2260/201 (US); F05D2260/202 (EP,US);
Y02T50/60 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/46]
Former [2019/15]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LEITSCHAUFELPLATTFORM KÜHL-SYSTEM UND VERFAHREN[2020/20]
English:VANE PLATFORM COOLING SYSTEM AND METHOD[2020/20]
French:SYSTEM DE REFROIDISSEMENT DES PLATFORMES DES AUBES STATORIQUE ET PROCÉDÉ[2020/20]
Former [2019/15]LEITSCHAUFELPLATTFORM-KÜHLSTRUKTUREN
Former [2019/15]VANE PLATFORM COOLING STRUCTURESPLATFORM
Former [2019/15]STRUCTURES DE REFROIDISSEMENT DES PLATFORMES DES AUBES STATORIQUE
Examination procedure08.10.2019Amendment by applicant (claims and/or description)
08.10.2019Examination requested  [2019/46]
08.10.2019Date on which the examining division has become responsible
07.05.2020Communication of intention to grant the patent
20.08.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
02.11.2020Communication of intention to grant the patent
24.02.2021Fee for grant paid
24.02.2021Fee for publishing/printing paid
24.02.2021Receipt of the translation of the claim(s)
Opposition(s)10.01.2022No opposition filed within time limit [2022/11]
Fees paidRenewal fee
19.08.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.08.2018
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
TR07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IE01.08.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
[2024/29]
Former [2024/23]HU01.08.2018
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IE01.08.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
Former [2023/33]HU01.08.2018
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IE01.08.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
Former [2023/30]AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IE01.08.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/36]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IE01.08.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/35]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IE01.08.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/34]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
BE31.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/29]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/26]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/23]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
LU01.08.2021
IS07.08.2021
PT09.08.2021
CH31.08.2021
LI31.08.2021
Former [2022/21]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
CH31.08.2021
LI31.08.2021
IS22.12.2021
Former [2022/18]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/10]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/09]AT07.04.2021
CZ07.04.2021
DK07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/08]AT07.04.2021
CZ07.04.2021
DK07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/07]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/52]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/51]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
RS07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/50]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
Former [2021/49]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
Former [2021/46]AT07.04.2021
FI07.04.2021
LT07.04.2021
NL07.04.2021
BG07.07.2021
Documents cited:Search[X]EP1138878  (ALSTOM POWER NV [NL]) [X] 1 * paragraph [0019]; figure 1 *;
 [XYI]US2005100437  (PHILLIPS JAMES S [US], et al) [X] 1,4-6 * paragraphs [0019] , [0020]; figure 4 * * paragraph [0003] * [Y] 7-15 [I] 2,3;
 [XY]EP1849965  (UNITED TECHNOLOGIES CORP [US]) [X] 1 * paragraphs [0013] , [0019]; figures 4,5 * [Y] 7;
 [Y]US9752447  (CLUM CAREY [US], et al) [Y] 8-15 * column 5, line 63 - line 67; figures 2, 3A, 3B ** column 4, line 52 - line 63 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.