EP3462092 - A COOKING DEVICE HAVING A CONTROL KNOB [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.03.2023 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 22.04.2022 | ||
Former | Grant of patent is intended Status updated on 16.01.2022 | ||
Former | Examination is in progress Status updated on 24.07.2020 | ||
Former | Request for examination was made Status updated on 11.10.2019 | ||
Former | The application has been published Status updated on 01.03.2019 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states BSH Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | [2019/14] | Inventor(s) | 01 /
Cosar, Sevgi Büyüksehir Mah. Derya Sok. B34 D:32 Beylikdüzü 34520 ISTANBUL / TR | 02 /
Isbilen, Sezer Talatpasa mahallesi 1037. Sokak no: 40 kat:3 Esenyurt/Istanbul / TR | 03 /
Kilic, Ahmet Mert Zafer Mah. Cumhuriyet Bulv. Armadacity Plus F4/No: 53 Corlu/Tekirdag / TR | 04 /
Ünver, Ali Esentepe mah. Adnan Dogu Cad. Ergene Vadisi b-2 blok daire : 23 TR Çorlu/Tekirdag / TR | [2019/14] | Application number, filing date | 18189169.8 | 15.08.2018 | [2019/14] | Priority number, date | TR20170014516 | 28.09.2017 Original published format: TR 201714516 | [2019/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3462092 | Date: | 03.04.2019 | Language: | EN | [2019/14] | Type: | B1 Patent specification | No.: | EP3462092 | Date: | 25.05.2022 | Language: | EN | [2022/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.02.2019 | Classification | IPC: | F24C7/08, F24C3/12, G05G1/10, G05G5/00 | [2022/01] | CPC: |
F24C7/082 (EP);
F24C3/124 (EP);
G05G1/10 (EP);
G05G5/005 (EP)
|
Former IPC [2019/14] | F24C7/08, F24C3/12, G05G1/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/46] |
Former [2019/14] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KOCHVORRICHTUNG MIT BEDIENKNOPF | [2019/14] | English: | A COOKING DEVICE HAVING A CONTROL KNOB | [2019/14] | French: | DISPOSITIF DE CUISSON AYANT UN BOUTON DE COMMANDE | [2019/14] | Examination procedure | 05.07.2019 | Amendment by applicant (claims and/or description) | 04.10.2019 | Examination requested [2019/46] | 04.10.2019 | Date on which the examining division has become responsible | 27.07.2020 | Despatch of a communication from the examining division (Time limit: M06) | 26.01.2021 | Reply to a communication from the examining division | 17.01.2022 | Communication of intention to grant the patent | 13.04.2022 | Fee for grant paid | 13.04.2022 | Fee for publishing/printing paid | 13.04.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 28.02.2023 | No opposition filed within time limit [2023/18] | Fees paid | Renewal fee | 31.08.2020 | Renewal fee patent year 03 | 31.08.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.08.2018 | AL | 25.05.2022 | AT | 25.05.2022 | CY | 25.05.2022 | CZ | 25.05.2022 | DK | 25.05.2022 | EE | 25.05.2022 | ES | 25.05.2022 | FI | 25.05.2022 | HR | 25.05.2022 | IT | 25.05.2022 | LT | 25.05.2022 | LV | 25.05.2022 | MC | 25.05.2022 | MK | 25.05.2022 | PL | 25.05.2022 | RO | 25.05.2022 | RS | 25.05.2022 | SI | 25.05.2022 | SK | 25.05.2022 | SM | 25.05.2022 | IE | 15.08.2022 | LU | 15.08.2022 | BG | 25.08.2022 | GB | 25.08.2022 | NO | 25.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | FR | 31.08.2022 | LI | 31.08.2022 | IS | 25.09.2022 | PT | 26.09.2022 | [2024/27] |
Former [2024/21] | HU | 15.08.2018 | |
AL | 25.05.2022 | ||
AT | 25.05.2022 | ||
CY | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
IT | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
GB | 25.08.2022 | ||
NO | 25.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2024/18] | HU | 15.08.2018 | |
AL | 25.05.2022 | ||
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
IT | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
GB | 25.08.2022 | ||
NO | 25.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2024/11] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
IT | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
GB | 25.08.2022 | ||
NO | 25.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/47] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
GB | 25.08.2022 | ||
NO | 25.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/42] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/35] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/33] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
IE | 15.08.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/25] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SI | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/21] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
LU | 15.08.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/17] | AL | 25.05.2022 | |
AT | 25.05.2022 | ||
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/16] | AT | 25.05.2022 | |
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
MC | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/09] | AT | 25.05.2022 | |
CZ | 25.05.2022 | ||
DK | 25.05.2022 | ||
EE | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
PL | 25.05.2022 | ||
RO | 25.05.2022 | ||
RS | 25.05.2022 | ||
SK | 25.05.2022 | ||
SM | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2023/07] | AT | 25.05.2022 | |
DK | 25.05.2022 | ||
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
PL | 25.05.2022 | ||
RS | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2022/51] | AT | 25.05.2022 | |
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
PL | 25.05.2022 | ||
RS | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
IS | 25.09.2022 | ||
PT | 26.09.2022 | ||
Former [2022/50] | AT | 25.05.2022 | |
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
PL | 25.05.2022 | ||
RS | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
PT | 26.09.2022 | ||
Former [2022/49] | AT | 25.05.2022 | |
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
HR | 25.05.2022 | ||
LT | 25.05.2022 | ||
LV | 25.05.2022 | ||
BG | 25.08.2022 | ||
NO | 25.08.2022 | ||
PT | 26.09.2022 | ||
Former [2022/47] | AT | 25.05.2022 | |
ES | 25.05.2022 | ||
FI | 25.05.2022 | ||
LT | 25.05.2022 | ||
NO | 25.08.2022 | ||
PT | 26.09.2022 | Documents cited: | Search | [A]US3158034 (WILLIAMSON HARRY A) [A] 1 * figures 1-3 * * column 2, lines 53-60 * * column 3, lines 17-42 *; | [XYI]GB2219377 (VALOR HEATING LTD [GB]) [X] 1-3,7-13 * figures 1-4 * * page 1, lines 3-7 * * page 5, line 7 - page 7, line 10 * [Y] 6 [I] 4,5; | [A]EP0388375 (SMEG SPA [IT]) [A] 1 * figures 1-3 *; | [Y]WO2012089506 (ARCELIK AS [TR], et al) [Y] 6 * abstract *; | [AP]CN107990374 (ZHANG WEI) [AP] 1-13 * figures 1-8 *; | [L]CN108826377 (FOSHAN SHUNDE MIDEA WASHING APPLIANCES MFG CO LTD) [L] 1* figures 1-5 * | Examination | US2841031 | by applicant | DE102005032509 |