EP3450185 - DEFECT DETECTION FOR PRINT MEDIA [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 20.05.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 08.12.2020 | ||
Former | Request for examination was made Status updated on 13.09.2019 | ||
Former | The application has been published Status updated on 01.02.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Canon Production Printing Holding B.V. Van der Grintenstraat 10 5914 HH Venlo / NL | [2020/48] |
Former [2020/13] | For all designated states Canon Production Printing Holding B.V. St. Urbanusweg 43 5914 CA Venlo / NL | ||
Former [2019/10] | For all designated states OCE Holding B.V. 101 St. Urbanusweg 43 5914 CA Venlo / NL | Inventor(s) | 01 /
JANSSEN, Cornelius M.F. St. Urbanusweg 43 5914 CA Venlo / NL | 02 /
VAN BREUGEL, Leon C. St. Urbanusweg 43 5914 CA Venlo / NL | 03 /
BOONEN, Ken A.G. St. Urbanusweg 43 5914 CA Venlo / NL | [2019/10] | Representative(s) | Canon Production Printing IP Department Canon Production Printing Netherlands B.V. Van der Grintenstraat 10 5914 HH Venlo / NL | [N/P] |
Former [2021/18] | Canon Production Printing IP Department St. Urbanusweg 43 5914 CA Venlo / NL | ||
Former [2019/10] | OCE IP Department St. Urbanusweg 43 5914 CA Venlo / NL | Application number, filing date | 18190067.1 | 21.08.2018 | [2019/10] | Priority number, date | EP20170189032 | 01.09.2017 Original published format: EP 17189032 | [2019/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3450185 | Date: | 06.03.2019 | Language: | EN | [2019/10] | Type: | B1 Patent specification | No.: | EP3450185 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.11.2018 | Classification | IPC: | B41J11/00, B41J13/00 | [2019/10] | CPC: |
B41J11/0095 (EP,US);
B41J13/0009 (US);
B41J13/0027 (EP,US);
B41J2203/011 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] |
Former [2019/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FEHLERERKENNUNG FÜR DRUCKMEDIEN | [2019/10] | English: | DEFECT DETECTION FOR PRINT MEDIA | [2019/10] | French: | DÉTECTION DE DÉFAUTS SUR UN SUPPORT D'IMPRESSION | [2019/10] | Examination procedure | 29.08.2019 | Amendment by applicant (claims and/or description) | 06.09.2019 | Examination requested [2019/42] | 06.09.2019 | Date on which the examining division has become responsible | 09.12.2020 | Communication of intention to grant the patent | 26.03.2021 | Fee for grant paid | 26.03.2021 | Fee for publishing/printing paid | 26.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 31.08.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.08.2018 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IE | 21.08.2021 | LU | 21.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | FR | 31.08.2021 | LI | 31.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | [2024/23] |
Former [2023/33] | HU | 21.08.2018 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IE | 21.08.2021 | ||
LU | 21.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2023/30] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IE | 21.08.2021 | ||
LU | 21.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/36] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IE | 21.08.2021 | ||
LU | 21.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/35] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IE | 21.08.2021 | ||
LU | 21.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/34] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
LU | 21.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
LU | 21.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
LU | 21.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
LU | 21.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/21] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/52] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | Documents cited: | Search | [A]US2011279507 (CASTILLO RUDDY [US], et al) [A] 1-15* paragraphs [0027] - [0032] - [ 0051]; figure 3 *; | [A]WO2016055501 (OCE TECH BV [NL]) [A] 1-15 * page 27, line 18 - page 28, line 29 * * Section "Print system control"; page 32, line 12 - page 34, line 20 * * figures 1, 4 * | by applicant | US8419144 |