blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3614096

EP3614096 - FEELER SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.05.2022
Database last updated on 04.06.2024
FormerThe patent has been granted
Status updated on  28.05.2021
FormerGrant of patent is intended
Status updated on  16.03.2021
FormerExamination is in progress
Status updated on  13.12.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Dr. Johannes Heidenhain GmbH
Dr.-Johannes-Heidenhain-Str. 5
83301 Traunreut / DE
[2020/09]
Inventor(s)01 / SCHOPF, Reinhold
Pirach 6a
83308 Trostberg / DE
02 / SCHROLL, Thomas
Reichlberg 20
83301 Traunreut / DE
 [2020/09]
Application number, filing date18190118.222.08.2018
[2020/09]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3614096
Date:26.02.2020
Language:DE
[2020/09]
Type: B1 Patent specification 
No.:EP3614096
Date:30.06.2021
Language:DE
[2021/26]
Search report(s)(Supplementary) European search report - dispatched on:EP21.11.2018
ClassificationIPC:G01B5/012, G01D11/30, G01B21/04, G01B7/012, B25J15/04, // H01F7/02
[2020/09]
CPC:
G01B5/012 (EP); G01B21/047 (EP); G01B7/012 (EP);
G01D11/30 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/40]
Former [2020/09]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:TASTSYSTEM[2020/09]
English:FEELER SYSTEM[2020/09]
French:SYSTÈME PAR CONTACT[2020/09]
Examination procedure22.08.2018Examination requested  [2020/09]
21.11.2018Date on which the examining division has become responsible
03.12.2018Despatch of a communication from the examining division (Time limit: M04)
02.04.2019Reply to a communication from the examining division
14.05.2019Despatch of a communication from the examining division (Time limit: M04)
30.08.2019Reply to a communication from the examining division
17.03.2021Communication of intention to grant the patent
19.05.2021Fee for grant paid
19.05.2021Fee for publishing/printing paid
19.05.2021Receipt of the translation of the claim(s)
Opposition(s)31.03.2022No opposition filed within time limit [2022/23]
Fees paidRenewal fee
31.08.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.08.2018
AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
IE22.08.2021
LU22.08.2021
FR30.08.2021
BE31.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
[2024/23]
Former [2023/33]HU22.08.2018
AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
IE22.08.2021
LU22.08.2021
FR30.08.2021
BE31.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2023/30]AL30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
IE22.08.2021
LU22.08.2021
FR30.08.2021
BE31.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2023/19]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
IE22.08.2021
LU22.08.2021
FR30.08.2021
BE31.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/35]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
IE22.08.2021
LU22.08.2021
FR30.08.2021
BE31.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/34]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
LU22.08.2021
FR30.08.2021
BE31.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/29]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
LU22.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/26]AL30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
LU22.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/24]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
LU22.08.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/21]CZ30.06.2021
DK30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/18]CZ30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/11]CZ30.06.2021
EE30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/09]CZ30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
PT02.11.2021
Former [2022/08]CZ30.06.2021
ES30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2022/07]FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/51]FI30.06.2021
HR30.06.2021
LV30.06.2021
RS30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/49]FI30.06.2021
HR30.06.2021
LV30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/47]FI30.06.2021
BG30.09.2021
Former [2021/46]FI30.06.2021
Documents cited:Search[A]EP0269789  (HEIDENHAIN GMBH DR JOHANNES [DE]) [A] 1-10 * abstract * * column 6, line 23 - column 8, line 34; figures 5 - 7 *;
 [XY]EP0551165  (RENISHAW PLC [GB]) [X] 1-10 * abstract * * column 6, line 39 - column 7, line 8; figure 9 * * column 9, line 3 - column 10, line 29; figure 5 * [Y] 1-10;
 [A]US5678944  (SLOCUM ALEXANDER H [US], et al) [A] 1-10* the whole document *;
 [YD]DE102009031323  (M & H INPROCESS MESSTECHNIK GMBH [DE]) [YD] 1-10 * the whole document *
by applicantDE102009031323
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.