EP3618442 - AN IMAGE CAPTURING DEVICE, A METHOD AND COMPUTER PROGRAM PRODUCT FOR FORMING AN ENCODED IMAGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 30.03.2020 | ||
Former | Examination is in progress Status updated on 12.07.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Axis AB Gränden 1 223 69 Lund / SE | [2021/09] |
Former [2020/10] | For all designated states Axis AB Emdalavägen 14 223 69 Lund / SE | Inventor(s) | 01 /
Ardö, Björn c/o Axis Communications AB Emdalavägen 14 223 69 Lund / SE | 02 /
Lundberg, Stefan c/o Axis Communications AB Emdalavägen 14 223 69 Lund / SE | 03 /
Sandström, Stefan c/o Axis Communications AB Emdalavägen 14 223 69 Lund / SE | [2020/10] | Representative(s) | AWA Sweden AB Box 5117 200 71 Malmö / SE | [N/P] |
Former [2020/10] | AWA Sweden AB P.O. Box 5117 200 71 Malmö / SE | Application number, filing date | 18190932.6 | 27.08.2018 | [2020/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3618442 | Date: | 04.03.2020 | Language: | EN | [2020/10] | Type: | B1 Patent specification | No.: | EP3618442 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.03.2019 | Classification | IPC: | H04N19/14, H04N19/172, H04N19/115, H04N5/235, H04N5/262 | [2020/10] | CPC: |
H04N19/115 (EP);
H04N23/80 (EP,CN,KR,US);
H04N19/184 (CN);
H04N19/136 (US);
H04N19/14 (EP);
H04N19/172 (EP);
H04N19/174 (CN,KR,US);
H04N19/176 (CN);
H04N19/436 (KR);
H04N19/46 (US);
H04N21/23602 (CN);
H04N21/23608 (CN);
H04N23/45 (EP,KR,US);
H04N23/661 (KR);
H04N23/70 (KR);
H04N23/90 (EP);
H04N5/04 (US);
H04N5/2624 (CN,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/10] | Title | German: | BILDAUFNAHMEVORRICHTUNG, VERFAHREN UND COMPUTERPROGRAMMPRODUKT ZUR ERZEUGUNG EINES CODIERTEN BILDES | [2020/10] | English: | AN IMAGE CAPTURING DEVICE, A METHOD AND COMPUTER PROGRAM PRODUCT FOR FORMING AN ENCODED IMAGE | [2020/10] | French: | DISPOSITIF DE CAPTURE D'IMAGES, PROCÉDÉ ET PRODUIT DE PROGRAMME INFORMATIQUE PERMETTANT DE FORMER UNE IMAGE CODÉE | [2020/10] | Examination procedure | 04.04.2019 | Amendment by applicant (claims and/or description) | 04.04.2019 | Examination requested [2020/10] | 04.04.2019 | Date on which the examining division has become responsible | 16.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 02.09.2019 | Reply to a communication from the examining division | 16.03.2020 | Cancellation of oral proceeding that was planned for 13.07.2020 | 31.03.2020 | Communication of intention to grant the patent | 13.07.2020 | Date of oral proceedings (cancelled) | 20.07.2020 | Fee for grant paid | 20.07.2020 | Fee for publishing/printing paid | 20.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 19.08.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.08.2018 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | TR | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | [2024/29] |
Former [2024/23] | HU | 27.08.2018 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/33] | HU | 27.08.2018 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/18] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/23] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Documents cited: | Search | [A]US2005175091 (PURI ATUL [US], et al); | [XYI]US2013141523 (BANTA BILL [US], et al); | [Y]US2015288865 (OSBORNE THOMAS WESLEY [US]); | [X]US2016088280 (SADI SAJID [US], et al); | [A]US2016286138 (KIM YONG SUN [KR]); | [A]WO2017127816 (WEN ZIYU [CN], et al); | [Y]US2018020238 (LIU SHAN [US], et al); | [A]WO2018045098 (SONIC IP INC [US]); | [Y]US2018084257 (ABBAS ADEEL [US]) | Examination | EP1966917 | US2009067507 | by applicant | EP2814253 | EP3021583 | EP20170167724 | EP20170167732 |