blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3618442

EP3618442 - AN IMAGE CAPTURING DEVICE, A METHOD AND COMPUTER PROGRAM PRODUCT FOR FORMING AN ENCODED IMAGE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.08.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  28.08.2020
FormerGrant of patent is intended
Status updated on  30.03.2020
FormerExamination is in progress
Status updated on  12.07.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Axis AB
Gränden 1
223 69 Lund / SE
[2021/09]
Former [2020/10]For all designated states
Axis AB
Emdalavägen 14
223 69 Lund / SE
Inventor(s)01 / Ardö, Björn
c/o Axis Communications AB Emdalavägen 14
223 69 Lund / SE
02 / Lundberg, Stefan
c/o Axis Communications AB Emdalavägen 14
223 69 Lund / SE
03 / Sandström, Stefan
c/o Axis Communications AB Emdalavägen 14
223 69 Lund / SE
 [2020/10]
Representative(s)AWA Sweden AB
Box 5117
200 71 Malmö / SE
[N/P]
Former [2020/10]AWA Sweden AB
P.O. Box 5117
200 71 Malmö / SE
Application number, filing date18190932.627.08.2018
[2020/10]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3618442
Date:04.03.2020
Language:EN
[2020/10]
Type: B1 Patent specification 
No.:EP3618442
Date:30.09.2020
Language:EN
[2020/40]
Search report(s)(Supplementary) European search report - dispatched on:EP11.03.2019
ClassificationIPC:H04N19/14, H04N19/172, H04N19/115, H04N5/235, H04N5/262
[2020/10]
CPC:
H04N19/115 (EP); H04N23/80 (EP,CN,KR,US); H04N19/184 (CN);
H04N19/136 (US); H04N19/14 (EP); H04N19/172 (EP);
H04N19/174 (CN,KR,US); H04N19/176 (CN); H04N19/436 (KR);
H04N19/46 (US); H04N21/23602 (CN); H04N21/23608 (CN);
H04N23/45 (EP,KR,US); H04N23/661 (KR); H04N23/70 (KR);
H04N23/90 (EP); H04N5/04 (US); H04N5/2624 (CN,US);
H04N5/265 (CN); H04N7/181 (CN); H04N23/698 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/10]
TitleGerman:BILDAUFNAHMEVORRICHTUNG, VERFAHREN UND COMPUTERPROGRAMMPRODUKT ZUR ERZEUGUNG EINES CODIERTEN BILDES[2020/10]
English:AN IMAGE CAPTURING DEVICE, A METHOD AND COMPUTER PROGRAM PRODUCT FOR FORMING AN ENCODED IMAGE[2020/10]
French:DISPOSITIF DE CAPTURE D'IMAGES, PROCÉDÉ ET PRODUIT DE PROGRAMME INFORMATIQUE PERMETTANT DE FORMER UNE IMAGE CODÉE[2020/10]
Examination procedure04.04.2019Amendment by applicant (claims and/or description)
04.04.2019Examination requested  [2020/10]
04.04.2019Date on which the examining division has become responsible
16.07.2019Despatch of a communication from the examining division (Time limit: M04)
02.09.2019Reply to a communication from the examining division
16.03.2020Cancellation of oral proceeding that was planned for 13.07.2020
31.03.2020Communication of intention to grant the patent
13.07.2020Date of oral proceedings (cancelled)
20.07.2020Fee for grant paid
20.07.2020Fee for publishing/printing paid
20.07.2020Receipt of the translation of the claim(s)
Opposition(s)01.07.2021No opposition filed within time limit [2021/36]
Fees paidRenewal fee
19.08.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.08.2018
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
[2024/29]
Former [2024/23]HU27.08.2018
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2023/33]HU27.08.2018
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2023/30]AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/23]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/18]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2022/10]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/50]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/48]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/37]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/30]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/28]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/25]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/23]AT30.09.2020
CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RO30.09.2020
RS30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/22]CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RO30.09.2020
RS30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/21]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/20]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/10]FI30.09.2020
HR30.09.2020
LV30.09.2020
RS30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/08]FI30.09.2020
BG30.12.2020
NO30.12.2020
Former [2021/07]FI30.09.2020
NO30.12.2020
Documents cited:Search[A]US2005175091  (PURI ATUL [US], et al);
 [XYI]US2013141523  (BANTA BILL [US], et al);
 [Y]US2015288865  (OSBORNE THOMAS WESLEY [US]);
 [X]US2016088280  (SADI SAJID [US], et al);
 [A]US2016286138  (KIM YONG SUN [KR]);
 [A]WO2017127816  (WEN ZIYU [CN], et al);
 [Y]US2018020238  (LIU SHAN [US], et al);
 [A]WO2018045098  (SONIC IP INC [US]);
 [Y]US2018084257  (ABBAS ADEEL [US])
ExaminationEP1966917
 US2009067507
by applicantEP2814253
 EP3021583
 EP20170167724
 EP20170167732
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.