EP3617441 - ROCK BREAKING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.04.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 11.05.2021 | ||
Former | Grant of patent is intended Status updated on 10.03.2021 | ||
Former | Request for examination was made Status updated on 11.09.2020 | ||
Former | The application has been published Status updated on 31.01.2020 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Sandvik Mining and Construction Oy PL 100 33311 Tampere / FI | [2020/10] | Inventor(s) | 01 /
Hämäläinen, Pasi Sandvik Mining and Construction Oy PL 100 33311 Tampere / FI | [2020/10] | Representative(s) | Sandvik Sandvik Mining and Construction Oy Patent Department PL 100 33311 Tampere / FI | [N/P] |
Former [2020/10] | Sandvik Sandvik Mining and Construction Oy PL 100 Patent Department 33311 Tampere / FI | Application number, filing date | 18192024.0 | 31.08.2018 | [2020/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3617441 | Date: | 04.03.2020 | Language: | EN | [2020/10] | Type: | B1 Patent specification | No.: | EP3617441 | Date: | 09.06.2021 | Language: | EN | [2021/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.02.2019 | Classification | IPC: | E21B44/00, E21B47/00 | [2020/10] | CPC: |
E21B44/00 (EP);
E21C37/26 (KR);
E21B41/00 (CN);
E21B44/08 (KR,US);
E21B1/00 (EP,CN,KR,US);
E21B47/00 (EP,CN,KR,US);
E21C39/00 (CN);
G01L1/10 (KR,US);
G01L1/255 (KR,US);
G01M13/00 (CN,KR);
G01N29/11 (KR,US);
G01N2291/02827 (KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/42] |
Former [2020/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GESTEINSBRUCHVORRICHTUNG | [2020/10] | English: | ROCK BREAKING DEVICE | [2020/10] | French: | DISPOSITIF BRISE-ROCHES | [2020/10] | Examination procedure | 02.09.2020 | Amendment by applicant (claims and/or description) | 04.09.2020 | Examination requested [2020/42] | 04.09.2020 | Date on which the examining division has become responsible | 11.03.2021 | Communication of intention to grant the patent | 29.04.2021 | Fee for grant paid | 29.04.2021 | Fee for publishing/printing paid | 29.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 10.03.2022 | No opposition filed within time limit [2022/20] | Fees paid | Renewal fee | 31.08.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.08.2018 | AL | 09.06.2021 | AT | 09.06.2021 | CY | 09.06.2021 | CZ | 09.06.2021 | DK | 09.06.2021 | EE | 09.06.2021 | ES | 09.06.2021 | HR | 09.06.2021 | IT | 09.06.2021 | LT | 09.06.2021 | LV | 09.06.2021 | MC | 09.06.2021 | MK | 09.06.2021 | MT | 09.06.2021 | NL | 09.06.2021 | PL | 09.06.2021 | RO | 09.06.2021 | RS | 09.06.2021 | SI | 09.06.2021 | SK | 09.06.2021 | SM | 09.06.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | LU | 31.08.2021 | BG | 09.09.2021 | NO | 09.09.2021 | GR | 10.09.2021 | IS | 09.10.2021 | PT | 11.10.2021 | [2024/42] |
Former [2024/23] | HU | 31.08.2018 | |
AL | 09.06.2021 | ||
AT | 09.06.2021 | ||
CY | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
IT | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
MK | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SI | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2023/33] | HU | 31.08.2018 | |
AL | 09.06.2021 | ||
AT | 09.06.2021 | ||
CY | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
IT | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SI | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2023/30] | AL | 09.06.2021 | |
AT | 09.06.2021 | ||
CY | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
IT | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SI | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/36] | AL | 09.06.2021 | |
AT | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
IT | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SI | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/34] | AL | 09.06.2021 | |
AT | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SI | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/29] | AL | 09.06.2021 | |
AT | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SI | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/26] | AL | 09.06.2021 | |
AT | 09.06.2021 | ||
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/24] | AT | 09.06.2021 | |
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
LU | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/21] | AT | 09.06.2021 | |
CZ | 09.06.2021 | ||
DK | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/18] | AT | 09.06.2021 | |
CZ | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
MC | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/11] | AT | 09.06.2021 | |
CZ | 09.06.2021 | ||
EE | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
NL | 09.06.2021 | ||
PL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
IS | 09.10.2021 | ||
PT | 11.10.2021 | ||
Former [2022/09] | AT | 09.06.2021 | |
CZ | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
NL | 09.06.2021 | ||
RO | 09.06.2021 | ||
RS | 09.06.2021 | ||
SK | 09.06.2021 | ||
SM | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
PT | 11.10.2021 | ||
Former [2022/08] | AT | 09.06.2021 | |
CZ | 09.06.2021 | ||
ES | 09.06.2021 | ||
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
NL | 09.06.2021 | ||
RS | 09.06.2021 | ||
SM | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
Former [2022/07] | AT | 09.06.2021 | |
HR | 09.06.2021 | ||
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
NL | 09.06.2021 | ||
RS | 09.06.2021 | ||
SM | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
Former [2021/51] | HR | 09.06.2021 | |
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
RS | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
Former [2021/49] | HR | 09.06.2021 | |
LT | 09.06.2021 | ||
LV | 09.06.2021 | ||
BG | 09.09.2021 | ||
NO | 09.09.2021 | ||
GR | 10.09.2021 | ||
Former [2021/46] | LT | 09.06.2021 | |
BG | 09.09.2021 | Documents cited: | Search | [A]EP0409304 (SCHLUMBERGER PROSPECTION [FR]); | [A]WO03033216 (SANDVIK TAMROCK OY [FI], et al); | [X]WO2007082997 (SANDVIK MINING & CONSTR OY [FI], et al); | [A]WO2010037905 (SANDVIK MINING & CONSTR OY [FI], et al); | [A]EP2416149 (SUMITOMO METAL IND [JP]) | by applicant | US4671366 |