blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3453447

EP3453447 - PROCESS FOR THE PREPARATION OF ALKANESULFONIC ACID [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  29.10.2021
Database last updated on 30.09.2024
FormerThe patent has been granted
Status updated on  20.11.2020
FormerGrant of patent is intended
Status updated on  09.08.2020
FormerRequest for examination was made
Status updated on  09.05.2020
FormerGrant of patent is intended
Status updated on  05.03.2020
FormerRequest for examination was made
Status updated on  08.02.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Evonik Operations GmbH
Rellinghauser Straße 1-11
45128 Essen / DE
[2019/50]
Former [2019/11]For all designated states
Evonik Degussa GmbH
Rellinghauser Straße 1-11
45128 Essen / DE
Inventor(s)01 / Fonfe, Benjamin
Nibelungenallee 51
60318 Frankfurt / DE
02 / Cheung, Chiu Kee
Beim Klostergut 3
63755 Alzenau / DE
03 / Hartwig, Ali
Braunwiesenstr. 12
63584 Gründau / DE
 [2019/11]
Representative(s)Evonik Patent Association
c/o Evonik Industries AG
IP Management
Bau 1042A/PB 15
Paul-Baumann-Straße 1
45772 Marl / DE
[2020/52]
Application number, filing date18192500.904.09.2018
[2019/11]
Priority number, dateEP2017018955106.09.2017         Original published format: EP 17189551
[2019/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3453447
Date:13.03.2019
Language:EN
[2019/11]
Type: B1 Patent specification 
No.:EP3453447
Date:23.12.2020
Language:EN
[2020/52]
Search report(s)(Supplementary) European search report - dispatched on:EP24.10.2018
ClassificationIPC:B01J19/00, B01J19/18, C07C309/04
[2019/11]
CPC:
C07C303/16 (EP,CN,US); B01J19/002 (EP,US); B01J19/0053 (CN);
B01J19/0066 (EP,CN,US); B01J19/18 (EP,CN,US); B01J19/1862 (EP,US);
B01J2219/00033 (US); B01J2219/00065 (US); B01J2219/00094 (EP,US);
B01J2219/00101 (EP,US); B01J2219/00103 (EP,US); B01J2219/00162 (US);
B01J2219/00182 (EP,US); B01J2219/00186 (EP,US); B01J2219/002 (EP,US);
B01J2219/00211 (US); B01J2219/00263 (EP,US); B01J2219/00779 (EP,US);
B01J2219/2474 (US) (-)
C-Set:
C07C303/16, C07C309/04 (CN,EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/11]
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON ALKANSULFONSÄURE[2019/11]
English:PROCESS FOR THE PREPARATION OF ALKANESULFONIC ACID[2019/11]
French:PROCÉDÉ DE FABRICATION D'ACIDE ALCANESULFONIQUE[2019/11]
Examination proceduredeletedDate on which the examining division has become responsible
04.09.2018Examination requested  [2019/11]
24.10.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
17.12.2019Amendment by applicant (claims and/or description)
06.03.2020Communication of intention to grant the patent
07.05.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
10.08.2020Communication of intention to grant the patent
11.11.2020Fee for grant paid
11.11.2020Fee for publishing/printing paid
11.11.2020Receipt of the translation of the claim(s)
Opposition(s)24.09.2021No opposition filed within time limit [2021/48]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
20.12.2019Request for further processing filed
20.12.2019Full payment received (date of receipt of payment)
Request granted
16.01.2020Decision despatched
The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application
17.12.2019Request for further processing filed
20.12.2019Full payment received (date of receipt of payment)
Request granted
16.01.2020Decision despatched
Fees paidRenewal fee
24.09.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.09.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
MK23.12.2020
MT23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
TR23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
IE04.09.2021
LU04.09.2021
[2024/42]
Former [2024/29]HU04.09.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
MK23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
TR23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
IE04.09.2021
LU04.09.2021
Former [2024/23]HU04.09.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
MK23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
IE04.09.2021
LU04.09.2021
Former [2023/33]HU04.09.2018
AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
IE04.09.2021
LU04.09.2021
Former [2023/30]AL23.12.2020
AT23.12.2020
CY23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
IE04.09.2021
LU04.09.2021
Former [2022/35]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
IE04.09.2021
LU04.09.2021
Former [2022/34]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
LU04.09.2021
Former [2022/25]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
MC23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2022/23]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2022/13]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SI23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2022/10]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2022/08]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
ES23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/49]AL23.12.2020
AT23.12.2020
CZ23.12.2020
DK23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/45]AL23.12.2020
AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/42]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
IS23.04.2021
PT23.04.2021
Former [2021/39]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
PL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/37]AT23.12.2020
CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/36]CZ23.12.2020
EE23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/35]CZ23.12.2020
FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
RO23.12.2020
RS23.12.2020
SE23.12.2020
SK23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/33]FI23.12.2020
HR23.12.2020
LT23.12.2020
LV23.12.2020
NL23.12.2020
RS23.12.2020
SE23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
PT23.04.2021
Former [2021/32]FI23.12.2020
HR23.12.2020
LV23.12.2020
NL23.12.2020
RS23.12.2020
SE23.12.2020
SM23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
Former [2021/30]FI23.12.2020
HR23.12.2020
LV23.12.2020
NL23.12.2020
RS23.12.2020
SE23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
Former [2021/28]FI23.12.2020
HR23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
Former [2021/24]FI23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
BG23.03.2021
NO23.03.2021
GR24.03.2021
Former [2021/23]FI23.12.2020
LV23.12.2020
RS23.12.2020
SE23.12.2020
NO23.03.2021
GR24.03.2021
Former [2021/22]FI23.12.2020
RS23.12.2020
NO23.03.2021
Former [2021/20]FI23.12.2020
Documents cited:Search[XY]US3428671  (TOLAND WILLIAM G) [X] 1 * example 1 * [Y] 3-10,12-15;
 [Y]US5211924  (LEE MYON K [US], et al) [Y] 3,5-10,12-15 * abstract * * figure 1 * * column 1, lines 45-50 * * column 2, lines 40-47 *;
 [XY]US6124497  (CHEN JOHNSON [US]) [X] 1 * abstract * * claim 1 * * example 1 * [Y] 3-10,12-15;
 [XY]US2004186316  (CHOUDARY BOYAPATI MANORANJAN [IN], et al) [X] 1 * abstract * * paragraph [[0035]] * * claim 1 * [Y] 3-10,12-15;
 [Y]WO2009023515  (LILLY CO ELI [US], et al) [Y] 4,5 * abstract * * figure 1 * * claims 3, 16, 87 * * page 2, line 27 - page 3, line 3 * * page 17, lines 19-20 ** page 12, lines 26-27 *
by applicantUS2505910
 US2727920
 US4239696
 WO9834914
 WO0031027
 CN101648892
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.