blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3585062

EP3585062 - NETWORK SYSTEM FOR IDENTIFYING CABLE CONNECTION AND METHOD FOR AUTHENTICATING CABLE ID [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.10.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  13.11.2020
FormerGrant of patent is intended
Status updated on  15.06.2020
FormerRequest for examination was made
Status updated on  22.11.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Quanta Computer Inc.
No. 188, Wenhua 2nd Road
Guishan District
Taoyuan City 33377 / TW
[2019/52]
Inventor(s)01 / YANG, Ting-Hao
No.211, Wenhua 2nd Rd., Guishan Dist.
33377 Taoyuan City / TW
02 / KUNG, Tsu-Tai
No.211, Wenhua 2nd Rd., Guishan Dist.
33377 Taoyuan City / TW
03 / LIN, Hou-Lung
No.211, Wenhua 2nd Rd., Guishan Dist.
33377 Taoyuan City / TW
 [2019/52]
Representative(s)dompatent von Kreisler Selting Werner - Partnerschaft von Patent- und Rechtsanwälten mbB
Deichmannhaus am Dom
Bahnhofsvorplatz 1
50667 Köln / DE
[2019/52]
Application number, filing date18192949.806.09.2018
[2019/52]
Priority number, dateUS20181601352620.06.2018         Original published format: US201816013526
[2019/52]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3585062
Date:25.12.2019
Language:EN
[2019/52]
Type: B1 Patent specification 
No.:EP3585062
Date:16.12.2020
Language:EN
[2020/51]
Search report(s)(Supplementary) European search report - dispatched on:EP05.02.2019
ClassificationIPC:H04Q1/02
[2019/52]
CPC:
H04Q1/136 (EP); G06F13/4068 (US); G02B6/3895 (US);
G06F11/3041 (CN); G06F11/3051 (CN); G06F11/325 (CN);
G06F13/1668 (US); G06F13/4282 (US); H04L41/12 (EP,CN,US);
H04L41/24 (CN); H04L43/50 (CN); G06F2213/0016 (US);
H04L43/10 (US); H04L67/10 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/52]
TitleGerman:NETZWERKSYSTEM ZUR IDENTIFIZIERUNG EINER KABELVERBINDUNG UND VERFAHREN ZUR AUTHENTIFIZIERUNG EINER KABEL-ID[2019/52]
English:NETWORK SYSTEM FOR IDENTIFYING CABLE CONNECTION AND METHOD FOR AUTHENTICATING CABLE ID[2019/52]
French:SYSTÈME DE RÉSEAU POUR L'IDENTIFICATION D'UNE CONNEXION DE CÂBLE ET PROCÉDÉ D'AUTHENTIFICATION D'IDENTIFICATION DE CÂBLE[2019/52]
Examination procedure13.05.2019Amendment by applicant (claims and/or description)
13.05.2019Examination requested  [2019/52]
13.05.2019Date on which the examining division has become responsible
16.06.2020Communication of intention to grant the patent
07.10.2020Fee for grant paid
07.10.2020Fee for publishing/printing paid
07.10.2020Receipt of the translation of the claim(s)
Opposition(s)17.09.2021No opposition filed within time limit [2021/47]
Fees paidRenewal fee
15.07.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.09.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
TR16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE06.09.2021
LU06.09.2021
[2024/29]
Former [2024/23]HU06.09.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE06.09.2021
LU06.09.2021
Former [2023/33]HU06.09.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE06.09.2021
LU06.09.2021
Former [2023/30]AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE06.09.2021
LU06.09.2021
Former [2022/35]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE06.09.2021
LU06.09.2021
Former [2022/34]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
LU06.09.2021
Former [2022/25]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2022/23]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2022/13]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2022/10]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2022/08]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/49]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/48]AL16.12.2020
AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/45]AL16.12.2020
AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/42]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/39]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/37]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/36]CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/35]CZ16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/33]FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/32]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/30]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/28]FI16.12.2020
HR16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/23]FI16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/22]FI16.12.2020
RS16.12.2020
NO16.03.2021
Former [2021/20]FI16.12.2020
Documents cited:Search[A]KR20060130517  (PANDUIT CORP [US]) [A] 1-15* abstract *;
 [A]CN102726056B  (COMMSCOPE INC) [A] 1-15 * abstract *;
 [I]US2016109662  (ANNE LAXMAN R [US], et al) [I] 1-15 * paragraph [0018] * * paragraph [0021] * * paragraph [0024] * * paragraph [0033] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.