blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3636607

EP3636607 - METHOD FOR MANUFACTURING A CAPILLARY TUBE [Right-click to bookmark this link]
Former [2020/16]CAPILLARY TUBE AND METHOD FOR MANUFACTURING THE SAME
[2020/39]
StatusNo opposition filed within time limit
Status updated on  19.11.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  11.12.2020
FormerGrant of patent is intended
Status updated on  01.09.2020
FormerRequest for examination was made
Status updated on  13.03.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Heraeus Quarzglas GmbH & Co. KG
Quarzstrasse 8
63450 Hanau / DE
[2020/16]
Inventor(s)01 / WEIDLICH, Stefan
Kaestrich 43
55116 Mainz / DE
02 / SCHMITT, Clemens
Wingertsweg 3
63825 Blankenbach / DE
03 / WERNER, Jörg
Muehlweg 10 a
63674 Altenstadt / DE
 [2020/16]
Representative(s)Staudt, Armin Walter
Sandeldamm 24a
63450 Hanau / DE
[2020/16]
Application number, filing date18199287.609.10.2018
[2020/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3636607
Date:15.04.2020
Language:DE
[2020/16]
Type: B1 Patent specification 
No.:EP3636607
Date:13.01.2021
Language:DE
[2021/02]
Search report(s)(Supplementary) European search report - dispatched on:EP02.04.2019
ClassificationIPC:C03B37/012, C03B23/047, G02B6/036
[2020/16]
CPC:
C03B23/047 (EP,CN,KR); C03B37/15 (US); C03B23/043 (KR);
C03B23/0476 (CN); C03B23/057 (KR); C03B23/08 (KR);
C03B37/01242 (EP); G02B6/03611 (EP); C03B2203/16 (EP);
C03B2203/32 (US); C03B2205/16 (US); C03B2205/30 (US);
C03B37/02781 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/16]
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES KAPILLARROHRES[2020/39]
English:METHOD FOR MANUFACTURING A CAPILLARY TUBE[2020/39]
French:PROCÉDÉ DE FABRICATION D'UN TUBE CAPILLAIRE[2020/39]
Former [2020/16]KAPILLARROHR UND VERFAHREN ZUR HERSTELLUNG DESSELBEN
Former [2020/16]CAPILLARY TUBE AND METHOD FOR MANUFACTURING THE SAME
Former [2020/16]TUBE CAPILLAIRE ET SON PROCÉDÉ DE FABRICATION
Examination procedure12.11.2019Amendment by applicant (claims and/or description)
12.11.2019Examination requested  [2020/16]
12.11.2019Date on which the examining division has become responsible
02.09.2020Communication of intention to grant the patent
02.12.2020Fee for grant paid
02.12.2020Fee for publishing/printing paid
02.12.2020Receipt of the translation of the claim(s)
Opposition(s)14.10.2021No opposition filed within time limit [2021/51]
Fees paidRenewal fee
23.10.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.10.2018
AL13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
MK13.01.2021
NL13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
TR13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
IE09.10.2021
LU09.10.2021
[2024/29]
Former [2024/23]HU09.10.2018
AL13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
MK13.01.2021
NL13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
IE09.10.2021
LU09.10.2021
Former [2023/33]HU09.10.2018
AL13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
NL13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
IE09.10.2021
LU09.10.2021
Former [2023/30]AL13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
NL13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
IE09.10.2021
LU09.10.2021
Former [2023/29]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
NL13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
IE09.10.2021
LU09.10.2021
Former [2022/48]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
IE09.10.2021
LU09.10.2021
Former [2022/35]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
LU09.10.2021
Former [2022/33]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2022/23]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
IT13.01.2021
LT13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2022/13]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2022/10]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2022/08]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2022/07]AL13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/50]CZ13.01.2021
DK13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/49]CZ13.01.2021
DK13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/48]CZ13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/46]FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
SM13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/42]FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/39]FI13.01.2021
HR13.01.2021
LT13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/38]FI13.01.2021
HR13.01.2021
LT13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/37]FI13.01.2021
HR13.01.2021
LT13.01.2021
RS13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/36]FI13.01.2021
HR13.01.2021
LT13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/35]FI13.01.2021
HR13.01.2021
LT13.01.2021
NO13.04.2021
PT13.05.2021
Former [2021/33]FI13.01.2021
LT13.01.2021
NO13.04.2021
PT13.05.2021
Documents cited:Search[A]JPH038733  (HITACHI CABLE) [A] 1-13* abstract *;
 [I]JPH04342430  (IWAKI GLASS CO LTD) [I] 13 * paragraph [0024]; example - *;
 [XAI]JPH08157227  (HOYA CORP) [X] 1,7,13 * paragraphs [0004] , [0015] , [0049] - [0052]; figure 1; examples 25-28; table 5 * [A] 11,12 [I] 2-6,8-10;
 [A]EP1884808  (FURUKAWA ELECTRIC NORTH AM INC [US]) [A] 11,12 * paragraphs [0024] , [0030]; figure 3 *
by applicantEP0259877
 DE19856892
 WO2014141168
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.