blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3473749

EP3473749 - METHOD OF APPLYING A COATING TO A COMPONENT AND COMPONENT PRODUCED ACCORDING TO THE METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.04.2023
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  13.05.2022
FormerGrant of patent is intended
Status updated on  22.03.2022
FormerExamination is in progress
Status updated on  20.12.2019
FormerRequest for examination was made
Status updated on  18.10.2019
FormerThe application has been published
Status updated on  22.03.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Christian Maier GmbH & Co. KG Maschinenfabrik
Würzburger Strasse 67-69
89520 Heidenheim / DE
[2019/17]
Inventor(s)01 / MAIER, Florian
Philipp Funk Str. 80
73433 Aalen / DE
02 / SCHWENK, Günther
Großkuchener Straße 1
89520 Heidenheim / DE
 [2019/17]
Representative(s)Dr. Weitzel & Partner
Patent- und Rechtsanwälte mbB
Friedenstrasse 10
89522 Heidenheim / DE
[2019/17]
Application number, filing date18199775.011.10.2018
[2019/17]
Priority number, dateDE20171021858018.10.2017         Original published format: DE102017218580
[2019/17]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3473749
Date:24.04.2019
Language:DE
[2019/17]
Type: B1 Patent specification 
No.:EP3473749
Date:15.06.2022
Language:DE
[2022/24]
Search report(s)(Supplementary) European search report - dispatched on:EP17.12.2018
ClassificationIPC:C23C24/10, B23K26/342, F16J15/34
[2019/17]
CPC:
C23C24/10 (EP); B23K26/0624 (EP); B23K26/123 (EP);
B23K26/144 (EP); B23K26/342 (EP); F16J15/3496 (EP);
B23K2103/08 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/47]
Former [2019/17]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUM AUFBRINGEN EINER SCHICHT AUF EIN BAUTEIL UND BAUTEIL HERGESTELLT NACH DEM VERFAHREN[2019/17]
English:METHOD OF APPLYING A COATING TO A COMPONENT AND COMPONENT PRODUCED ACCORDING TO THE METHOD[2019/17]
French:PROCÉDÉ D'APPLICATION D'UNE COUCHE SUR UN COMPOSANT ET COMPOSANT FABRIQUÉ SELON LEDIT PROCÉDÉ[2019/17]
Examination procedure16.10.2019Amendment by applicant (claims and/or description)
16.10.2019Examination requested  [2019/47]
16.10.2019Date on which the examining division has become responsible
07.01.2020Despatch of a communication from the examining division (Time limit: M04)
07.05.2020Reply to a communication from the examining division
31.05.2021Despatch of a communication from the examining division (Time limit: M06)
04.11.2021Reply to a communication from the examining division
23.03.2022Communication of intention to grant the patent
05.05.2022Fee for grant paid
05.05.2022Fee for publishing/printing paid
05.05.2022Receipt of the translation of the claim(s)
Opposition(s)16.03.2023No opposition filed within time limit [2023/21]
Fees paidRenewal fee
14.10.2020Renewal fee patent year 03
13.10.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.10.2018
AL15.06.2022
CY15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
MK15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
TR15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IE11.10.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
BE31.10.2022
[2024/29]
Former [2024/27]HU11.10.2018
AL15.06.2022
CY15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
MK15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IE11.10.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
BE31.10.2022
Former [2024/21]HU11.10.2018
AL15.06.2022
CY15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IE11.10.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
BE31.10.2022
Former [2024/18]HU11.10.2018
AL15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IE11.10.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
BE31.10.2022
Former [2023/48]AL15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IE11.10.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
BE31.10.2022
Former [2023/42]AL15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
BE31.10.2022
Former [2023/30]AL15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
LU11.10.2022
IS15.10.2022
PT17.10.2022
Former [2023/25]AL15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
MC15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SI15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/21]AL15.06.2022
CZ15.06.2022
DK15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/17]AL15.06.2022
CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/12]CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
IS15.10.2022
PT17.10.2022
Former [2023/11]CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
PL15.06.2022
RO15.06.2022
RS15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
PT17.10.2022
Former [2023/09]CZ15.06.2022
EE15.06.2022
ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
RO15.06.2022
RS15.06.2022
SK15.06.2022
SM15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
PT17.10.2022
Former [2023/08]ES15.06.2022
FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
RS15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2022/50]FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
RS15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2022/49]FI15.06.2022
HR15.06.2022
LT15.06.2022
LV15.06.2022
BG15.09.2022
NO15.09.2022
GR16.09.2022
Former [2022/47]FI15.06.2022
LT15.06.2022
NO15.09.2022
Documents cited:Search[XY]EP0246003  (NORSKE STATS OLJESELSKAP [NO]) [X] 1-4,7,8,11,12,15,16 * page 4, lines 21 - 25; figure 3; example 5 * [Y] 5,6,9,10,14;
 [X]CN202180081U  (HANWEI GUANGYUAN GUANZHOU MACHINERY EQUIPMENT CO LTD) [X] 15,18* claim 1 *;
 [Y]  - CHANG C ET AL, "Micro-scale mechanical characterization of Inconel cermet coatings deposited by laser cladding", BOLETIN DE LA SOCIEDAD ESPANOLA DE CERAMICA Y VIDRIO, Elsevier [NL], (20160123), vol. 55, no. 4, doi:10.1016/j.bsecv.2016.01.001, ISSN 0366-3175, pages 136 - 142, XP055530813 [Y] 5,6 * page 137, column l *

DOI:   http://dx.doi.org/10.1016/j.bsecv.2016.01.001
 [Y]  - SCHOPPHOVEN T ET AL, "EHLA: Extreme High-Speed Laser Material Deposition", LASER TECHNIK JOURNAL, Wiley-VCH-Verlag, Weinheim [DE], (20170616), vol. 14, no. 4, doi:10.1002/latj.201700020, ISSN 1613-7728, pages 26 - 29, XP055530213 [Y] 9,10 * the whole document *

DOI:   http://dx.doi.org/10.1002/latj.201700020
 [Y]  - MALINAUSKAS M ET AL, "Ultrafast laser processing of materials: from science to industry", LIGHT: SCIENCE & APPLICATIONS, (20160314), vol. 5, no. 8, doi:10.1038/lsa.2016.133, pages 1 - 14, XP055530724 [Y] 14 * Zusammenfassung; page 2, column l *

DOI:   http://dx.doi.org/10.1038/lsa.2016.133
ExaminationUS4898785
by applicantDE2201664
 US6410470
 DE10151716
 US2016047254
 DE102015118441
 US2016368096
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.