EP3637085 - METHOD FOR RADIAL ALIGNMENT OF WHEEL SETS OF RAILWAY VEHICLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.10.2021 Database last updated on 08.06.2024 | |
Former | The patent has been granted Status updated on 06.11.2020 | ||
Former | Grant of patent is intended Status updated on 28.09.2020 | ||
Former | Examination is in progress Status updated on 17.07.2020 | ||
Former | Request for examination was made Status updated on 13.03.2020 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states HEGENSCHEIDT-MFD GmbH Hegenscheidt Platz 41812 Erkelenz / DE | [2020/38] |
Former [2020/16] | For all designated states Hegenscheidt-MFD GmbH & Co. KG Hegenscheidt Platz 41812 Erkelenz / DE | Inventor(s) | 01 /
NAUMANN, John Oliver Burgstrasse 10 41489 Wassenberg / DE | 02 /
THOLEN, Sascha Mühlenweid 10 52525 Waldfeucht / DE | 03 /
MÜLLER, Karl Houverather Heide 3 41812 Erkelenz / DE | [2020/16] | Representative(s) | Brinkmann & Partner Patentanwälte Partnerschaft mbB Am Seestern 8 40547 Düsseldorf / DE | [N/P] |
Former [2020/16] | Rausch Wanischeck-Bergmann Brinkmann Partnerschaft mbB Patentanwälte Am Seestern 8 40547 Düsseldorf / DE | Application number, filing date | 18200207.1 | 12.10.2018 | [2020/16] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3637085 | Date: | 15.04.2020 | Language: | DE | [2020/16] | Type: | B1 Patent specification | No.: | EP3637085 | Date: | 09.12.2020 | Language: | DE | [2020/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.04.2019 | Classification | IPC: | G01B21/24, G01M17/10 | [2020/41] | CPC: |
G01M17/10 (EP,US);
G01B21/24 (EP,US);
B61K9/12 (US)
|
Former IPC [2020/16] | G01M17/10, B61F5/38, B61K9/12, G01B11/275, G01B5/255 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/16] | Title | German: | VERFAHREN ZUM RADIALEN AUSRICHTEN VON RADSÄTZEN VON SCHIENENFAHRZEUGEN | [2020/16] | English: | METHOD FOR RADIAL ALIGNMENT OF WHEEL SETS OF RAILWAY VEHICLES | [2020/16] | French: | PROCÉDÉ D'ALIGNEMENT RADIAL DES TRAINS DE ROUES DES VÉHICULES FERROVIAIRES | [2020/16] | Examination procedure | 11.10.2019 | Amendment by applicant (claims and/or description) | 11.10.2019 | Examination requested [2020/16] | 11.10.2019 | Date on which the examining division has become responsible | 17.07.2020 | Despatch of a communication from the examining division (Time limit: M02) | 31.08.2020 | Reply to a communication from the examining division | 05.10.2020 | Communication of intention to grant the patent | 21.10.2020 | Fee for grant paid | 21.10.2020 | Fee for publishing/printing paid | 21.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 10.09.2021 | No opposition filed within time limit [2021/46] | Fees paid | Renewal fee | 29.10.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.10.2018 | AL | 09.12.2020 | CY | 09.12.2020 | CZ | 09.12.2020 | DK | 09.12.2020 | EE | 09.12.2020 | FI | 09.12.2020 | HR | 09.12.2020 | LT | 09.12.2020 | LV | 09.12.2020 | MC | 09.12.2020 | MK | 09.12.2020 | NL | 09.12.2020 | RO | 09.12.2020 | RS | 09.12.2020 | SE | 09.12.2020 | SI | 09.12.2020 | SK | 09.12.2020 | SM | 09.12.2020 | BG | 09.03.2021 | NO | 09.03.2021 | GR | 10.03.2021 | IS | 09.04.2021 | PT | 09.04.2021 | [2024/23] |
Former [2023/33] | HU | 12.10.2018 | |
AL | 09.12.2020 | ||
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2023/30] | AL | 09.12.2020 | |
CY | 09.12.2020 | ||
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2022/33] | AL | 09.12.2020 | |
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
MC | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2022/23] | AL | 09.12.2020 | |
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2022/10] | AL | 09.12.2020 | |
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/49] | AL | 09.12.2020 | |
CZ | 09.12.2020 | ||
DK | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SI | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/45] | AL | 09.12.2020 | |
CZ | 09.12.2020 | ||
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/42] | CZ | 09.12.2020 | |
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
IS | 09.04.2021 | ||
PT | 09.04.2021 | ||
Former [2021/36] | CZ | 09.12.2020 | |
EE | 09.12.2020 | ||
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/35] | CZ | 09.12.2020 | |
FI | 09.12.2020 | ||
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RO | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SK | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/33] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LT | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
PT | 09.04.2021 | ||
Former [2021/32] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
SM | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/30] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
NL | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/28] | FI | 09.12.2020 | |
HR | 09.12.2020 | ||
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/23] | FI | 09.12.2020 | |
LV | 09.12.2020 | ||
RS | 09.12.2020 | ||
SE | 09.12.2020 | ||
BG | 09.03.2021 | ||
NO | 09.03.2021 | ||
GR | 10.03.2021 | ||
Former [2021/22] | FI | 09.12.2020 | |
RS | 09.12.2020 | ||
NO | 09.03.2021 | ||
Former [2021/20] | FI | 09.12.2020 | Documents cited: | Search | [A]EP2402227 (DMA S R L [IT]) [A] 1-5 * the whole document *; | [A]DE102013111526 (BOMBARDIER TRANSP GMBH [DE]) [A] 1-5 * the whole document *; | [A]AU2015261670B (INT ELECTRONIC MACHINES CORPORATION [US]) [A] 1-5 * abstract *; | [A]CN106769116 (BEIJING CHANGCHENG INST METROLOGY & MEASUREMENT AVIATION IND CORP CHINA) [A] 1-5 * the whole document *; | [A] - ATTIVISSIMO F ET AL, "A Railway Measurement System to Evaluate the Wheel-Rail Interaction Quality", IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (20071001), vol. 56, no. 5, doi:10.1109/TIM.2007.903583, ISSN 0018-9456, pages 1583 - 1589, XP011192296 [A] 1-5 * the whole document * DOI: http://dx.doi.org/10.1109/TIM.2007.903583 |