blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3480338

EP3480338 - ELECTROLESS DEPOSITION OF NICKEL-PHOSPHORUS ALLOY AND CORRESPONDING ELECTROLYTE [Right-click to bookmark this link]
Former [2019/19]ELECTROLESS DEPOSITION OF NICKEL-PHOSPHOR ALLOY AND CORRESPONDING ELECTROLYTE
[2020/23]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  28.05.2020
FormerRequest for examination was made
Status updated on  08.11.2019
FormerThe application has been published
Status updated on  05.04.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
RIAG Oberflächentechnik AG
Murgstrasse 19a
9545 Wängi / CH
[2019/19]
Inventor(s)01 / Egli, André
Kreuzhausweg 1
6010 Kriens / CH
02 / Schnippering, Mathias
Marktgasse 78
8400 Winterthur / CH
 [2019/19]
Representative(s)Moser Götze & Partner Patentanwälte mbB
Paul-Klinger-Strasse 9
45127 Essen / DE
[2019/19]
Application number, filing date18201278.118.10.2018
[2019/19]
Priority number, dateDE20171012595407.11.2017         Original published format: DE102017125954
[2019/19]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3480338
Date:08.05.2019
Language:DE
[2019/19]
Type: B1 Patent specification 
No.:EP3480338
Date:09.09.2020
Language:DE
[2020/37]
Search report(s)(Supplementary) European search report - dispatched on:EP02.01.2019
ClassificationIPC:C23C18/36
[2019/19]
CPC:
C23C18/36 (EP,US); C23C18/50 (US); C22C19/03 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/50]
Former [2019/19]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STROMLOSE ABSCHEIDUNG EINER NICKEL-PHOSPHOR LEGIERUNG UND ENTSPRECHENDER ELEKTROLYT[2019/19]
English:ELECTROLESS DEPOSITION OF NICKEL-PHOSPHORUS ALLOY AND CORRESPONDING ELECTROLYTE[2020/23]
French:DÉPÔT AUTOCATALYTIQUE D'ALLIAGE DE NICKEL-PHOSPHORE ET ÉLECTROLYTE CORRESPONDANT[2019/19]
Former [2019/19]ELECTROLESS DEPOSITION OF NICKEL-PHOSPHOR ALLOY AND CORRESPONDING ELECTROLYTE
Examination procedure06.11.2019Amendment by applicant (claims and/or description)
06.11.2019Examination requested  [2019/50]
06.11.2019Date on which the examining division has become responsible
29.05.2020Communication of intention to grant the patent
03.08.2020Fee for grant paid
03.08.2020Fee for publishing/printing paid
03.08.2020Receipt of the translation of the claim(s)
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.10.2018
AL09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
MT09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE18.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
[2022/33]
Former [2022/27]HU18.10.2018
AL09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MT09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
IE18.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/48]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
IE18.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/46]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
IE18.10.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/31]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[Y]EP1167582  (SHIPLEY CO LLC [US]) [Y] 1-10 * paragraph [0019] * * paragraph [0021] * * paragraph [0024] - paragraph [0026] ** paragraph [0031] *;
 [Y]US2004144285  (STARK FRANZ-JOSEF [DE], et al) [Y] 1-10 * abstract * * paragraph [0013] - paragraph [0014] * * paragraph [0017] * * paragraph [0025] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.