blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3648465

EP3648465 - A METHOD FOR GENERATING A UNIQUE EVENT IDENTIFIER FOR AN EPG EVENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 15.07.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  20.05.2021
FormerRequest for examination was made
Status updated on  30.10.2020
FormerThe application has been published
Status updated on  03.04.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Advanced Digital Broadcast S.A.
Route de Lausanne 319
1293 Bellevue / CH
[2020/19]
Inventor(s)01 / Polak, Michal
ADB Polska Sp. z o.o.
ul. Trasa Polnocna 16
65-119 Zielona Gora / PL
 [2020/19]
Representative(s)Kancelaria Eupatent.pl Sp. z.o.o
Ul. Kilinskiego 185
90-348 Lodz / PL
[2020/19]
Application number, filing date18203234.230.10.2018
[2020/19]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3648465
Date:06.05.2020
Language:EN
[2020/19]
Type: B1 Patent specification 
No.:EP3648465
Date:15.09.2021
Language:EN
[2021/37]
Search report(s)(Supplementary) European search report - dispatched on:EP08.01.2019
ClassificationIPC:H04N21/2362, H04N21/262, H04N21/434
[2020/19]
CPC:
H04N21/2362 (EP); H04N21/26283 (EP); H04N21/4345 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/49]
Former [2020/19]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EIN VERFAHREN ZUR ERZEUGUNG EINER EINDEUTIGEN EREIGNISKENNUNG FÜR EIN EREIGNIS EINES ELEKTRONISCHEN PROGRAMMFÜHRERS[2020/19]
English:A METHOD FOR GENERATING A UNIQUE EVENT IDENTIFIER FOR AN EPG EVENT[2020/19]
French:PROCÉDÉ POUR GÉNÉRER UN IDENTIFIANT D'ÉVÉNEMENT UNIQUE POUR UN ÉVÉNEMENT DU GUIDE DE PROGRAMME ÉLECTRONIQUE[2020/19]
Examination procedure27.10.2020Examination requested  [2020/49]
27.10.2020Date on which the examining division has become responsible
04.11.2020Amendment by applicant (claims and/or description)
21.05.2021Communication of intention to grant the patent
07.07.2021Receipt of the translation of the claim(s)
10.08.2021Fee for grant paid
10.08.2021Fee for publishing/printing paid
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
27.10.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.10.2018
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
TR15.09.2021
IE30.10.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
[2024/29]
Former [2024/23]HU30.10.2018
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
IE30.10.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/33]HU30.10.2018
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
IE30.10.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/30]AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
IE30.10.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/10]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
IE30.10.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/48]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
IE30.10.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/37]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
LU30.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
LU30.10.2021
BE31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/35]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
LU30.10.2021
BE31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/33]AL15.09.2021
AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BE31.10.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/23]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
PL15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
PT17.01.2022
Former [2022/21]AT15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Documents cited:Search[A]US2002059636  (TAKEUCHI KOICHI [JP]) [A] 1-5 * figures 2, 5 ** paragraph [0042] - paragraph [0045] *;
 [A]US2010088734  (DEWA YOSHIHARU [JP], et al) [A] 1-5 * figure 5 * * paragraphs [0039] , [0 70] *;
 [A]WO2014121818  (ERICSSON TELEFON AB L M [SE]) [A] 1-5 * figures 2-7, 9 * * page 2, line 7 - line 31 * * page 8, line 10 - page 19, line 27 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.