blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3493333

EP3493333 - ELECTRIC PLUG CONNECTION FOR DATA TRANSMISSION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.04.2021
Database last updated on 02.08.2024
FormerThe patent has been granted
Status updated on  01.05.2020
FormerGrant of patent is intended
Status updated on  15.03.2020
FormerRequest for examination was made
Status updated on  04.10.2019
FormerThe application has been published
Status updated on  03.05.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE, MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Neutrik AG
Im alten Riet 143
9494 Schaan / LI
[2019/23]
Inventor(s)01 / Dobler, Oliver
Beckaweg 36
9491 Ruggell / LI
 [2019/23]
Representative(s)Fechner, Thomas
Hofmann & Fechner
Patentanwälte
Hörnlingerstrasse 3
Postfach 5
6830 Rankweil / AT
[2019/23]
Application number, filing date18204510.406.11.2018
[2019/23]
Priority number, dateDE20171012860401.12.2017         Original published format: DE102017128604
[2019/23]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3493333
Date:05.06.2019
Language:DE
[2019/23]
Type: B1 Patent specification 
No.:EP3493333
Date:03.06.2020
Language:DE
[2020/23]
Search report(s)(Supplementary) European search report - dispatched on:EP01.04.2019
ClassificationIPC:H01R13/627, H01R24/76, H01R13/66, H01R13/187, H01R12/70
[2019/23]
CPC:
H01R13/6275 (EP,US); H01R13/6395 (US); H01R13/5845 (US);
H01R12/7029 (EP,US); H01R13/187 (EP,US); H01R13/6658 (EP,US);
H01R24/76 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/45]
Former [2019/23]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTRISCHE STECKVERBINDUNG ZUR DATENÜBERTRAGUNG[2019/23]
English:ELECTRIC PLUG CONNECTION FOR DATA TRANSMISSION[2019/23]
French:FICHE DE RACCORDEMENT ÉLECTRIQUE DESTINÉE À LA TRANSMISSION DE DONNÉES[2019/23]
Examination procedure27.09.2019Amendment by applicant (claims and/or description)
27.09.2019Examination requested  [2019/45]
27.09.2019Date on which the examining division has become responsible
16.03.2020Communication of intention to grant the patent
28.04.2020Fee for grant paid
28.04.2020Fee for publishing/printing paid
28.04.2020Receipt of the translation of the claim(s)
Opposition(s)04.03.2021No opposition filed within time limit [2021/19]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.11.2018
AL03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
MT03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
IE06.11.2020
LU06.11.2020
BE30.11.2020
[2022/33]
Former [2022/28]HU06.11.2018
AL03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MT03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
IE06.11.2020
LU06.11.2020
Former [2021/46]AL03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
IE06.11.2020
LU06.11.2020
Former [2021/33]AL03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
LU06.11.2020
Former [2021/31]AL03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/24]AL03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/21]AL03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/10]AL03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/09]AL03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/04]AL03.06.2020
FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2021/01]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2020/51]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/50]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/48]FI03.06.2020
LT03.06.2020
SE03.06.2020
NO03.09.2020
Former [2020/47]LT03.06.2020
NO03.09.2020
Documents cited:Search[Y]US2010151720  (LIN MIAO-TING [TW]) [Y] 3,4,10* the whole document *;
 [Y]US9039455  (HSIEH HUNG-SHENG [TW]) [Y] 2,7,8 * column 3, line 9 - column 4, line 48 * * figures 2-7 *;
 [XY]US2016373845  (AKINO HIROSHI [JP]) [X] 1,5,6,9 * paragraph [0055] - paragraph [0075] * * figures 2-3B * [Y] 2-4,7,8,10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.