blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3479977

EP3479977 - METHOD FOR PRODUCTION OF WALL COMPONENTS FOR BUILDING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.05.2024
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  23.06.2023
FormerGrant of patent is intended
Status updated on  08.03.2023
FormerExamination is in progress
Status updated on  19.08.2021
FormerRequest for examination was made
Status updated on  05.04.2019
Most recent event   Tooltip31.05.2024No opposition filed within time limitpublished on 03.07.2024 [2024/27]
Applicant(s)For all designated states
Binder Beteiligungs AG
Zillertalstr. 39
6263 Fügen / AT
[2019/19]
Inventor(s)01 / Binder, Mattheo Johannes
Schanzlgasse 5
6263 Fügen / AT
 [2019/19]
Representative(s)Herrmann, Uwe
Lorenz Seidler Gossel
Rechtsanwälte Patentanwälte
Partnerschaft mbB
Widenmayerstraße 23
80538 München / DE
[2019/19]
Application number, filing date18204556.706.11.2018
[2019/19]
Priority number, dateDE20171012582906.11.2017         Original published format: DE102017125829
[2019/19]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3479977
Date:08.05.2019
Language:DE
[2019/19]
Type: B1 Patent specification 
No.:EP3479977
Date:26.07.2023
Language:DE
[2023/30]
Search report(s)(Supplementary) European search report - dispatched on:EP26.03.2019
ClassificationIPC:B27M3/00, B27B5/06, E04C2/12, E04B1/10, B27M1/08, // E04B1/348
[2023/12]
CPC:
B27M1/08 (EP,US); E04B2/70 (US); B27B5/06 (EP,US);
B27M3/0026 (EP,US); B65D9/34 (US); E04B1/00 (US);
E04B1/10 (EP,US); E04B1/34815 (EP,US); E04B1/34838 (US);
E04B1/34869 (EP,US); E04C2/12 (EP,US); E04C2/24 (US);
E04C2/46 (US); E04B2103/04 (US) (-)
Former IPC [2019/19]B27M3/00, B27B5/06, E04C2/12, E04B2/00, // E04B1/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/19]  
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON WANDBAUTEILEN FÜR GEBÄUDE[2019/19]
English:METHOD FOR PRODUCTION OF WALL COMPONENTS FOR BUILDING[2019/19]
French:PROCÉDÉ DE FABRICATION DE COMPOSANTS MURAUX POUR BÂTIMENTS[2019/19]
Examination proceduredeletedDate on which the examining division has become responsible
06.11.2018Examination requested  [2019/19]
21.06.2019Amendment by applicant (claims and/or description)
18.08.2021Despatch of a communication from the examining division (Time limit: M04)
19.08.2021Reply to a communication from the examining division
09.03.2023Communication of intention to grant the patent
15.06.2023Fee for grant paid
15.06.2023Fee for publishing/printing paid
15.06.2023Receipt of the translation of the claim(s)
Opposition(s)29.04.2024No opposition filed within time limit [2024/27]
Fees paidRenewal fee
26.11.2020Renewal fee patent year 03
29.11.2021Renewal fee patent year 04
28.11.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ26.07.2023
ES26.07.2023
HR26.07.2023
PL26.07.2023
RO26.07.2023
RS26.07.2023
SK26.07.2023
SM26.07.2023
NO26.10.2023
GR27.10.2023
IS26.11.2023
[2024/23]
Former [2024/20]HR26.07.2023
PL26.07.2023
RS26.07.2023
SM26.07.2023
NO26.10.2023
GR27.10.2023
IS26.11.2023
Former [2024/10]HR26.07.2023
PL26.07.2023
RS26.07.2023
NO26.10.2023
GR27.10.2023
IS26.11.2023
Former [2024/09]NO26.10.2023
GR27.10.2023
IS26.11.2023
Former [2024/08]NO26.10.2023
GR27.10.2023
Documents cited:Search[I]GB936135  (ALFRED MATTHIAS SIEGMUND SCHUD) [I] 1-7 * page 2, line 23 - page 4, line 81; figures 1-8 *;
 [A]EP2618972  (WEINIG MICHAEL AG [DE]) [A] 1-7* paragraph [0014] - paragraph [0057]; figures 1-6 *
ExaminationEP2618972
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.