| EP3493340 - IGNITION PLUG WITH EXTENDED HOUSING AND GROUNDING ELECTRODE ON THE INSIDE OF THE HOUSING [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 13.02.2026 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 18.12.2020 | ||
| Former | Grant of patent is intended Status updated on 04.10.2020 | ||
| Former | Request for examination was made Status updated on 13.12.2019 | ||
| Former | The application has been published Status updated on 03.05.2019 | Most recent event Tooltip | 13.02.2026 | Patent maintained (B2 publication) | published on 18.03.2026 [2026/12] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
| Former [2019/23] | For all designated states Robert Bosch GmbH P.O. Box 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
Odegov, Anatolij Kosmonavtov Str. 17 413121 Engels / RU | 02 /
Mueller, Bernd Solitudeallee 6 70825 Korntal-Muenchingen / DE | 03 /
Stockmeier, Ulrich Calwer Str. 75 75323 Bad Wildbad / DE | [2019/23] | Application number, filing date | 18204997.3 | 07.11.2018 | [2019/23] | Priority number, date | DE201710221517 | 30.11.2017 Original published format: DE102017221517 | [2019/23] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3493340 | Date: | 05.06.2019 | Language: | DE | [2019/23] | Type: | B1 Patent specification | No.: | EP3493340 | Date: | 20.01.2021 | Language: | DE | [2021/03] | Type: | B2 New European patent specification | No.: | EP3493340 | Date: | 18.03.2026 | Language: | DE | [2026/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.03.2019 | Classification | IPC: | H01T13/08, H01T13/32, H01T13/54 | [2019/23] | CPC: |
H01T13/54 (EP);
H01T13/08 (EP);
H01T13/32 (EP);
Y02T10/12 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/03] |
| Former [2019/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ZÜNDKERZE MIT VERLÄNGERTEM GEHÄUSE UND MASSEELEKTRODE AN DER GEHÄUSEINNENSEITE | [2019/23] | English: | IGNITION PLUG WITH EXTENDED HOUSING AND GROUNDING ELECTRODE ON THE INSIDE OF THE HOUSING | [2019/23] | French: | BOUGIE D'ALLUMAGE POURVUE DE LOGEMENT ALLONGÉ ET D'ÉLECTRODE DE MASSE SUR LA FACE INTÉRIEURE DU LOGEMENT | [2019/23] | Examination procedure | 20.11.2019 | Amendment by applicant (claims and/or description) | 05.12.2019 | Examination requested [2020/03] | 05.12.2019 | Date on which the examining division has become responsible | 05.10.2020 | Communication of intention to grant the patent | 04.12.2020 | Fee for grant paid | 04.12.2020 | Fee for publishing/printing paid | 04.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
20.10.2021
22.10.2021
ADMISSIBLE Zeitler Volpert Kandlbinder Werner-Eckert-Str. 4 81829 München / DE Opponent's representative Zeitler Volpert Kandlbinder Patentanwälte Werner-Eckert-Straße 4 81829 München / DE | [N/P] |
| Former [2023/29] | |||
| Opponent(s) | 01
20.10.2021
22.10.2021
ADMISSIBLE Zeitler Volpert Kandlbinder Werner-Eckert-Str. 4 81829 München / DE Opponent's representative Zeitler Volpert Kandlbinder Patentanwälte Partnerschaft mbB Werner-Eckert-Str. 4 81829 München / DE | ||
| Former [2021/47] | |||
| Opponent(s) | 01
20.10.2021
Zeitler Volpert Kandlbinder Herrnstrasse 44 80539 München / DE Opponent's representative Zeitler Volpert Kandlbinder Patentanwälte Partnerschaft mbB Herrnstrasse 44 80539 München / DE | 04.11.2021 | Invitation to proprietor to file observations on the notice of opposition | 11.03.2022 | Reply of patent proprietor to notice(s) of opposition | 22.11.2022 | Date of oral proceedings | 02.02.2023 | Despatch of interlocutory decision in opposition | 02.02.2023 | Despatch of minutes of oral proceedings | 29.09.2025 | Legal effect of interlocutory decision in opposition | 23.12.2025 | Despatch of communication that the patent will be maintained as amended | Appeal following opposition | 31.03.2023 | Appeal received No. T0644/23 | 31.03.2023 | Payment of appeal fee | 02.06.2023 | Statement of grounds filed | 29.09.2025 | Result of appeal procedure: maintenance in amended form | 19.12.2025 | Despatch of the decision of the Board of Appeal | 29.09.2025 | Date of oral proceedings | Fees paid | Renewal fee | 30.11.2020 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.11.2018 | AL | 20.01.2021 | CY | 20.01.2021 | CZ | 20.01.2021 | DK | 20.01.2021 | EE | 20.01.2021 | FI | 20.01.2021 | HR | 20.01.2021 | LT | 20.01.2021 | LV | 20.01.2021 | MC | 20.01.2021 | MK | 20.01.2021 | MT | 20.01.2021 | NL | 20.01.2021 | PL | 20.01.2021 | RO | 20.01.2021 | RS | 20.01.2021 | SE | 20.01.2021 | SI | 20.01.2021 | SK | 20.01.2021 | SM | 20.01.2021 | TR | 20.01.2021 | BG | 20.04.2021 | NO | 20.04.2021 | GR | 21.04.2021 | IS | 20.05.2021 | PT | 20.05.2021 | IE | 07.11.2021 | LU | 07.11.2021 | BE | 30.11.2021 | CH | 30.11.2021 | LI | 30.11.2021 | AT | 07.11.2023 | [2025/09] |
| Former [2024/42] | HU | 07.11.2018 | |
| AL | 20.01.2021 | ||
| CY | 20.01.2021 | ||
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| MK | 20.01.2021 | ||
| MT | 20.01.2021 | ||
| NL | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| TR | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2024/29] | HU | 07.11.2018 | |
| AL | 20.01.2021 | ||
| CY | 20.01.2021 | ||
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| MK | 20.01.2021 | ||
| NL | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| TR | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2024/23] | HU | 07.11.2018 | |
| AL | 20.01.2021 | ||
| CY | 20.01.2021 | ||
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| MK | 20.01.2021 | ||
| NL | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2023/33] | HU | 07.11.2018 | |
| AL | 20.01.2021 | ||
| CY | 20.01.2021 | ||
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| NL | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2023/30] | AL | 20.01.2021 | |
| CY | 20.01.2021 | ||
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| NL | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2023/29] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| NL | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2022/48] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| IE | 07.11.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2022/37] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| CH | 30.11.2021 | ||
| LI | 30.11.2021 | ||
| Former [2022/34] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| LU | 07.11.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/33] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| MC | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/23] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2022/13] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SI | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| PT | 20.05.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/10] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| PT | 20.05.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/07] | AL | 20.01.2021 | |
| CZ | 20.01.2021 | ||
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/50] | CZ | 20.01.2021 | |
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RO | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SK | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/49] | CZ | 20.01.2021 | |
| DK | 20.01.2021 | ||
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/48] | CZ | 20.01.2021 | |
| EE | 20.01.2021 | ||
| FI | 20.01.2021 | ||
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/46] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| SM | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/42] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| IS | 20.05.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/39] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| PL | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/38] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| SE | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/37] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| LV | 20.01.2021 | ||
| RS | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/36] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| BG | 20.04.2021 | ||
| NO | 20.04.2021 | ||
| GR | 21.04.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/35] | FI | 20.01.2021 | |
| HR | 20.01.2021 | ||
| LT | 20.01.2021 | ||
| NO | 20.04.2021 | ||
| PT | 20.05.2021 | ||
| Former [2021/33] | FI | 20.01.2021 | |
| LT | 20.01.2021 | ||
| NO | 20.04.2021 | ||
| PT | 20.05.2021 | Documents cited: | Search | [XDI] DE3821688 (KUHNERT DIETER DR ING et al.) | by applicant | DE3821688 | DE2916285 | Opposition | DE3821688 | GB478929 | UST866031 | DE3148296 | US4489596 | US1331282 | GB478929 | UST866031 | DE3148296 | US4489596 | US1331282 |