blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3499584

EP3499584 - FUNCTIONALIZED INFRASTRUCTURE AND METHOD OF INSTALLING SUCH A FUNCTIONALIZED INFRASTRUCTURE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2021
Database last updated on 31.05.2024
FormerThe patent has been granted
Status updated on  23.10.2020
FormerGrant of patent is intended
Status updated on  17.05.2020
FormerRequest for examination was made
Status updated on  17.05.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024 [2024/23]
Applicant(s)For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
Bâtiment "Le Ponant D" 25, rue Leblanc
75015 Paris / FR
For all designated states
COLAS
1 rue du Colonel Pierre Avia
75015 Paris / FR
[2020/46]
Former [2019/25]For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
Bâtiment "Le Ponant D" 25, rue Leblanc
75015 Paris / FR
Inventor(s)01 / CHAINTREUIL, Nicolas
7 rue François Dumas
73800 MONTMELIAN / FR
02 / BARRUEL, Franck
33 chemin des champs - Brédy
73370 LE BOURGET DU LAC / FR
 [2019/25]
Representative(s)Jacobacci Coralis Harle
32, rue de l'Arcade
75008 Paris / FR
[2020/48]
Former [2019/25]GIE Innovation Competence Group
310, avenue Berthelot
69372 Lyon Cedex 08 / FR
Application number, filing date18206252.114.11.2018
[2019/25]
Priority number, dateFR2017006205013.12.2017         Original published format: FR 1762050
[2019/25]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3499584
Date:19.06.2019
Language:FR
[2019/25]
Type: B1 Patent specification 
No.:EP3499584
Date:25.11.2020
Language:FR
[2020/48]
Search report(s)(Supplementary) European search report - dispatched on:EP14.12.2018
ClassificationIPC:H01L31/042, H01L31/02, H02S40/36, H02S40/34
[2019/25]
CPC:
H01L31/042 (EP,US); H02S20/21 (US); H01L31/0481 (US);
H01L31/0504 (US); H02S40/32 (EP,US); H02S40/34 (EP,US);
H02S40/36 (EP,US); Y02E10/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/25]
TitleGerman:FUNKTIONALISIERTE INFRASTRUKTUR UND VERFAHREN ZUM AUFBAU EINER SOLCHEN FUNKTIONALISIERTEN INFRASTRUKTUR[2019/25]
English:FUNCTIONALIZED INFRASTRUCTURE AND METHOD OF INSTALLING SUCH A FUNCTIONALIZED INFRASTRUCTURE[2019/25]
French:INFRASTRUCTURE FONCTIONNALISÉE ET PROCÉDÉ D'INSTALLATION D'UNE TELLE INFRASTRUCTURE FONCTIONNALISÉE[2019/25]
Examination procedure14.11.2018Examination requested  [2019/25]
19.12.2019Amendment by applicant (claims and/or description)
18.05.2020Communication of intention to grant the patent
17.09.2020Fee for grant paid
17.09.2020Fee for publishing/printing paid
17.09.2020Receipt of the translation of the claim(s)
Opposition(s)26.08.2021No opposition filed within time limit [2021/44]
Fees paidRenewal fee
16.10.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.11.2018
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
[2024/23]
Former [2023/33]HU14.11.2018
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2023/30]AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/33]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/23]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/10]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/50]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/46]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/45]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/37]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/36]AT25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/35]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/33]AT25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/32]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/28]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/25]AT25.11.2020
FI25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/23]AT25.11.2020
FI25.11.2020
LV25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/22]FI25.11.2020
RS25.11.2020
NO25.02.2021
PT25.03.2021
Former [2021/21]FI25.11.2020
PT25.03.2021
Former [2021/20]FI25.11.2020
Documents cited:Search[A]US2005199282  (OLEINICK JONATHAN [US], et al) [A] 1-16 * paragraphs [0031] - [0061] * * figures 2,3A * * abstract *;
 [A]  - GNATOV ANDREY ET AL, "Smart road as a complex system of electric power generation", 2017 IEEE FIRST UKRAINE CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (UKRCON), IEEE, (20170529), doi:10.1109/UKRCON.2017.8100531, pages 457 - 461, XP033251258 [A] 1-16 * abstract * * figure 1 *

DOI:   http://dx.doi.org/10.1109/UKRCON.2017.8100531
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.