EP3499584 - FUNCTIONALIZED INFRASTRUCTURE AND METHOD OF INSTALLING SUCH A FUNCTIONALIZED INFRASTRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 17.05.2020 | ||
Former | Request for examination was made Status updated on 17.05.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | For all designated states COLAS 1 rue du Colonel Pierre Avia 75015 Paris / FR | [2020/46] |
Former [2019/25] | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | Inventor(s) | 01 /
CHAINTREUIL, Nicolas 7 rue François Dumas 73800 MONTMELIAN / FR | 02 /
BARRUEL, Franck 33 chemin des champs - Brédy 73370 LE BOURGET DU LAC / FR | [2019/25] | Representative(s) | Jacobacci Coralis Harle 32, rue de l'Arcade 75008 Paris / FR | [2020/48] |
Former [2019/25] | GIE Innovation Competence Group 310, avenue Berthelot 69372 Lyon Cedex 08 / FR | Application number, filing date | 18206252.1 | 14.11.2018 | [2019/25] | Priority number, date | FR20170062050 | 13.12.2017 Original published format: FR 1762050 | [2019/25] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3499584 | Date: | 19.06.2019 | Language: | FR | [2019/25] | Type: | B1 Patent specification | No.: | EP3499584 | Date: | 25.11.2020 | Language: | FR | [2020/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.12.2018 | Classification | IPC: | H01L31/042, H01L31/02, H02S40/36, H02S40/34 | [2019/25] | CPC: |
H01L31/042 (EP,US);
H02S20/21 (US);
H01L31/0481 (US);
H01L31/0504 (US);
H02S40/32 (EP,US);
H02S40/34 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/25] | Title | German: | FUNKTIONALISIERTE INFRASTRUKTUR UND VERFAHREN ZUM AUFBAU EINER SOLCHEN FUNKTIONALISIERTEN INFRASTRUKTUR | [2019/25] | English: | FUNCTIONALIZED INFRASTRUCTURE AND METHOD OF INSTALLING SUCH A FUNCTIONALIZED INFRASTRUCTURE | [2019/25] | French: | INFRASTRUCTURE FONCTIONNALISÉE ET PROCÉDÉ D'INSTALLATION D'UNE TELLE INFRASTRUCTURE FONCTIONNALISÉE | [2019/25] | Examination procedure | 14.11.2018 | Examination requested [2019/25] | 19.12.2019 | Amendment by applicant (claims and/or description) | 18.05.2020 | Communication of intention to grant the patent | 17.09.2020 | Fee for grant paid | 17.09.2020 | Fee for publishing/printing paid | 17.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 16.10.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.11.2018 | AL | 25.11.2020 | AT | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | BG | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | [2024/23] |
Former [2023/33] | HU | 14.11.2018 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2023/30] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/33] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
NO | 25.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Documents cited: | Search | [A]US2005199282 (OLEINICK JONATHAN [US], et al) [A] 1-16 * paragraphs [0031] - [0061] * * figures 2,3A * * abstract *; | [A] - GNATOV ANDREY ET AL, "Smart road as a complex system of electric power generation", 2017 IEEE FIRST UKRAINE CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (UKRCON), IEEE, (20170529), doi:10.1109/UKRCON.2017.8100531, pages 457 - 461, XP033251258 [A] 1-16 * abstract * * figure 1 * DOI: http://dx.doi.org/10.1109/UKRCON.2017.8100531 |