blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3492640

EP3492640 - METHOD FOR CONTROL OF THE DELIVERY OF YARNS OF A SYSTEM COMPRISING A PLURALITY OF YARN FEEDERS AND TEXTILE MACHINE WITH A SYSTEM HAVING A PLURALITY OF YARN FEEDERS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  08.01.2020
FormerRequest for examination was made
Status updated on  14.12.2019
FormerGrant of patent is intended
Status updated on  25.11.2019
FormerRequest for examination was made
Status updated on  05.07.2019
FormerThe application has been published
Status updated on  03.05.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE, MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Memminger-IRO GmbH
Jakob-Mutz-Strasse 7
72280 Dornstetten / DE
[2019/23]
Inventor(s)01 / Schleeh, Sascha
Vogelsang 5
72178 Waldachtal / DE
 [2019/23]
Representative(s)Thomas, Stephan
Frese Patent PartGmbB Patentanwälte
Hüttenallee 237b
47800 Krefeld / DE
[2020/20]
Former [2019/23]Thomas, Stephan
Fitzner & Frese PartGmbB
Hüttenallee 237b
47800 Krefeld / DE
Application number, filing date18206922.919.11.2018
[2019/23]
Priority number, dateDE20171012832729.11.2017         Original published format: DE102017128327
[2019/23]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3492640
Date:05.06.2019
Language:DE
[2019/23]
Type: B1 Patent specification 
No.:EP3492640
Date:13.05.2020
Language:DE
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP16.04.2019
ClassificationIPC:D04B15/48
[2019/23]
CPC:
D04B15/484 (EP); D04B15/99 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/32]
Former [2019/23]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR STEUERUNG DER LIEFERUNG VON FÄDEN EINES SYSTEMS MIT MEHREREN FADENLIEFERGERÄTEN UND TEXTILMASCHINE MIT EINEM SYSTEM MIT MEHREREN FADENLIEFERGERÄTEN[2019/23]
English:METHOD FOR CONTROL OF THE DELIVERY OF YARNS OF A SYSTEM COMPRISING A PLURALITY OF YARN FEEDERS AND TEXTILE MACHINE WITH A SYSTEM HAVING A PLURALITY OF YARN FEEDERS[2019/23]
French:PROCÉDÉ DE COMMANDE DE L'ALIMENTATION EN FIL D'UN SYSTÈME COMPORTANT UNE PLURALITÉ D'APPAREILS D'ALIMENTATION EN FIL ET MACHINE TEXTILE DOTÉE D'UN SYSTÈME COMPORTANT UNE PLURALITÉ D'APPAREILS D'ALIMENTATION EN FIL[2019/23]
Examination procedure28.06.2019Examination requested  [2019/32]
28.06.2019Date on which the examining division has become responsible
26.11.2019Communication of intention to grant the patent
12.12.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
09.01.2020Communication of intention to grant the patent
28.02.2020Fee for grant paid
28.02.2020Fee for publishing/printing paid
28.02.2020Receipt of the translation of the claim(s)
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.11.2018
AL13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE19.11.2020
LU19.11.2020
BE30.11.2020
FR30.11.2020
[2022/33]
Former [2022/28]HU19.11.2018
AL13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE19.11.2020
LU19.11.2020
FR30.11.2020
Former [2021/48]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE19.11.2020
LU19.11.2020
FR30.11.2020
Former [2021/46]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE19.11.2020
LU19.11.2020
Former [2021/33]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
LU19.11.2020
Former [2021/31]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/24]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[A]DE10005101  (HEPP GMBH [DE]) [A] 1-11 * column 2, lines 5-58; figure 1 * * column 5, line 19 - column 6, line 2 *;
 [AD]EP2067886  (BTSR INT SPA [IT]) [AD] 1-11 * paragraphs [0026] - [0028] - [0041]; figure 1 *;
 [A]EP2572023  (BTSR INT SPA [IT]) [A] 1-11* paragraphs [0028] - [0030] - [0038] - [0042] *;
 [AD]DE102015118027  (MEMMINGER-IRO GMBH [DE]) [AD] 1-11 * paragraphs [0001] , [0056] - [0137]; figures 1-7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.