EP3501632 - APPARATUS OF PRODUCING METHANE AND METHOD FOR PRODUCING METHANE USING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.06.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 08.07.2022 | ||
Former | Grant of patent is intended Status updated on 15.05.2022 | ||
Former | Examination is in progress Status updated on 20.04.2020 | ||
Former | Request for examination was made Status updated on 27.05.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Kabushiki Kaisha Toyota Chuo Kenkyusho 41-1, Yokomichi Nagakute-shi, Aichi 480-1192 / JP | [2019/26] | Inventor(s) | 01 /
ITOH, Yoshihiko c/o Kabushiki Kaisha Toyota Chuo Kenkyusho 41-1, Yokomichi Nagakute-shi, Aichi 480-1192 / JP | 02 /
SAKAI, Masatoshi c/o Kabushiki Kaisha Toyota Chuo Kenkyusho 41-1, Yokomichi Nagakute-shi, Aichi 480-1192 / JP | 03 /
IMAGAWA, Haruo c/o Kabushiki Kaisha Toyota Chuo Kenkyusho 41-1, Yokomichi Nagakute-shi, Aichi 480-1192 / JP | 04 /
SAYAMA, Shogo c/o Kabushiki Kaisha Toyota Chuo Kenkyusho 41-1, Yokomichi Nagakute-shi, Aichi 480-1192 / JP | 05 /
BABA, Naoki c/o Kabushiki Kaisha Toyota Chuo Kenkyusho 41-1, Yokomichi Nagakute-shi, Aichi 480-1192 / JP | [2019/26] | Representative(s) | Kramer Barske Schmidtchen Patentanwälte PartG mbB European Patent Attorneys Landsberger Strasse 300 80687 München / DE | [2019/26] | Application number, filing date | 18206947.6 | 19.11.2018 | [2019/26] | Priority number, date | JP20170241970 | 18.12.2017 Original published format: JP 2017241970 | [2019/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3501632 | Date: | 26.06.2019 | Language: | EN | [2019/26] | Type: | B1 Patent specification | No.: | EP3501632 | Date: | 10.08.2022 | Language: | EN | [2022/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.05.2019 | Classification | IPC: | B01J7/00, C10L3/08, B01J12/00, C07C1/12 | [2022/19] | CPC: |
B01J7/00 (EP);
B01J12/007 (EP);
C07C1/12 (EP);
C10L3/08 (EP);
B01J2204/002 (EP);
C10L2290/10 (EP)
| C-Set: |
C07C1/12, C07C9/04 (EP)
|
Former IPC [2019/26] | B01J7/00, C10L3/08, B01J12/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/26] | Title | German: | VORRICHTUNG ZUR HERSTELLUNG VON METHAN UND VERFAHREN ZUR HERSTELLUNG VON METHAN DAMIT | [2019/26] | English: | APPARATUS OF PRODUCING METHANE AND METHOD FOR PRODUCING METHANE USING THE SAME | [2019/26] | French: | APPAREIL DE PRODUCTION DE MÉTHANE ET PROCÉDÉ DE PRODUCTION DE MÉTHANE Y FAISANT APPEL | [2019/26] | Examination procedure | 19.11.2018 | Examination requested [2019/26] | 15.10.2019 | Amendment by applicant (claims and/or description) | 23.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.07.2020 | Reply to a communication from the examining division | 07.04.2021 | Despatch of a communication from the examining division (Time limit: M02) | 18.05.2021 | Reply to a communication from the examining division | 16.05.2022 | Communication of intention to grant the patent | 05.07.2022 | Fee for grant paid | 05.07.2022 | Fee for publishing/printing paid | 05.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.05.2023 | No opposition filed within time limit [2023/29] | Fees paid | Renewal fee | 13.11.2020 | Renewal fee patent year 03 | 19.10.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.11.2018 | AL | 10.08.2022 | AT | 10.08.2022 | CY | 10.08.2022 | CZ | 10.08.2022 | DK | 10.08.2022 | EE | 10.08.2022 | ES | 10.08.2022 | FI | 10.08.2022 | HR | 10.08.2022 | IT | 10.08.2022 | LT | 10.08.2022 | LV | 10.08.2022 | MC | 10.08.2022 | MK | 10.08.2022 | NL | 10.08.2022 | PL | 10.08.2022 | RO | 10.08.2022 | RS | 10.08.2022 | SE | 10.08.2022 | SI | 10.08.2022 | SK | 10.08.2022 | SM | 10.08.2022 | TR | 10.08.2022 | NO | 10.11.2022 | GR | 11.11.2022 | GB | 19.11.2022 | IE | 19.11.2022 | LU | 19.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | FR | 30.11.2022 | LI | 30.11.2022 | IS | 10.12.2022 | PT | 12.12.2022 | [2024/29] |
Former [2024/27] | HU | 19.11.2018 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
IT | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
MK | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2024/26] | HU | 19.11.2018 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
IT | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2024/21] | HU | 19.11.2018 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CY | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2024/18] | HU | 19.11.2018 | |
AL | 10.08.2022 | ||
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/52] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/49] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/48] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
IE | 19.11.2022 | ||
LU | 19.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/47] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
GB | 19.11.2022 | ||
LU | 19.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/37] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SI | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
LU | 19.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/35] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/31] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
MC | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/29] | AL | 10.08.2022 | |
AT | 10.08.2022 | ||
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/23] | AT | 10.08.2022 | |
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
EE | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SK | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/22] | AT | 10.08.2022 | |
CZ | 10.08.2022 | ||
DK | 10.08.2022 | ||
ES | 10.08.2022 | ||
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RO | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/21] | DK | 10.08.2022 | |
FI | 10.08.2022 | ||
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/20] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
SM | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/12] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
IS | 10.12.2022 | ||
PT | 12.12.2022 | ||
Former [2023/11] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
PL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
PT | 12.12.2022 | ||
Former [2023/10] | FI | 10.08.2022 | |
HR | 10.08.2022 | ||
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
GR | 11.11.2022 | ||
PT | 12.12.2022 | ||
Former [2023/09] | FI | 10.08.2022 | |
LT | 10.08.2022 | ||
LV | 10.08.2022 | ||
NL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | ||
PT | 12.12.2022 | ||
Former [2023/08] | FI | 10.08.2022 | |
LT | 10.08.2022 | ||
NL | 10.08.2022 | ||
RS | 10.08.2022 | ||
SE | 10.08.2022 | ||
NO | 10.11.2022 | Documents cited: | Search | [Y]EP2216094 (AIR PROD & CHEM [US]) [Y] 4,5 * paragraph [169171]; figure 1 *; | [A]CN103666611 (CHINA PETROCHEMICAL CORP, et al) [A] 1-3* figure 1; claim - *; | [XI]EP2843031 (SUNSHINE KAIDI NEW ENERGY GROUP CO LTD [CN]) [X] 1 * paragraph [0035]; figure 3; example -; claim - * [I] 2,3; | [Y]WO2016007825 (UNIV COLUMBIA [US]) [Y] 4,5 * paragraphs [0003] , [0012] , [0014] , [0015] , [0016] , [0021] , [0022]; figure 1 * | by applicant | JPH05193920 | JPH09110731 | WO2006007825 | - Applied Catalysis B: Environmental, (20150000), pages 370 - 376 | - Catalysts, (20170000), vol. 7, page 88 |