blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3489443

EP3489443 - DEVICE FOR DRIVING A DOOR LATCH ROD OF A SLIDING DOOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.06.2021
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  26.06.2020
FormerGrant of patent is intended
Status updated on  17.11.2019
FormerRequest for examination was made
Status updated on  26.07.2019
FormerThe application has been published
Status updated on  26.04.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Sotralu (Société par Actions Simplifiée)
151 avenue des Pyrénées
31600 Muret / FR
[2019/22]
Inventor(s)01 / BERTON, Cyril
9 rue Federico Garcia Lorca
31270 CUGNAUX / FR
 [2019/22]
Representative(s)BARRE LAFORGUE
35, rue Lancefoc
31000 Toulouse / FR
[N/P]
Former [2019/22]Cabinet BARRE LAFORGUE & associés
35, rue Lancefoc
31000 Toulouse / FR
Application number, filing date18207058.119.11.2018
[2019/22]
Priority number, dateFR2017006130828.11.2017         Original published format: FR 1761308
[2019/22]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3489443
Date:29.05.2019
Language:FR
[2019/22]
Type: B1 Patent specification 
No.:EP3489443
Date:29.07.2020
Language:FR
[2020/31]
Search report(s)(Supplementary) European search report - dispatched on:EP26.03.2019
ClassificationIPC:E05C9/12
[2019/22]
CPC:
E05C9/12 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/35]
Former [2019/22]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Validation statesMA22.07.2019
TN22.07.2019
TitleGerman:VORRICHTUNG ZUM ANTRIEB EINER TÜRVERRIEGELUNGSSTANGE EINES SCHIEBE-ÖFFNUNGSELEMENTS[2019/22]
English:DEVICE FOR DRIVING A DOOR LATCH ROD OF A SLIDING DOOR[2019/22]
French:DISPOSITIF POUR ENTRAÎNER UNE TRINGLE PORTE-PÊNE D'OUVRANT COULISSANT[2019/22]
Examination procedure22.07.2019Examination requested  [2019/35]
22.07.2019Date on which the examining division has become responsible
18.11.2019Communication of intention to grant the patent
06.03.2020Fee for grant paid
06.03.2020Fee for publishing/printing paid
06.03.2020Receipt of the translation of the claim(s)
Opposition(s)30.04.2021No opposition filed within time limit [2021/27]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.11.2018
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
MT29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE19.11.2020
LU19.11.2020
IS29.11.2020
[2022/33]
Former [2022/28]HU19.11.2018
AL29.07.2020
AT29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MT29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE19.11.2020
LU19.11.2020
IS29.11.2020
Former [2021/46]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IE19.11.2020
LU19.11.2020
IS29.11.2020
Former [2021/36]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
LU19.11.2020
IS29.11.2020
Former [2021/33]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
LU19.11.2020
IS29.11.2020
Former [2021/31]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/28]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/25]AL29.07.2020
AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/22]AT29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/21]AT29.07.2020
DK29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/17]AT29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/10]AT29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
Former [2021/09]AT29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
Former [2021/08]FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
Former [2021/07]FI29.07.2020
LT29.07.2020
NO29.10.2020
Documents cited:Search[A]EP1243728  (SCHUECO INT KG [DE]) [A] 1,15,16* figures 7,8 *;
 [A]EP1533453  (WINKHAUS FA AUGUST [DE]) [A] 1,15,16 * the whole document *;
 [A]EP2374972  (MACO TECHNOLOGIE GMBH [AT]) [A] 1,15,16 * figure - *;
 [A]DE102015206905  (ROTO FRANK AG [DE]) [A] 1,15,16 * figures 7,8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.