blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3657193

EP3657193 - METHOD FOR MAGNETIZING A SUPERCONDUCTOR BULK MAGNET, WITH GENERATING AN AUXILIARY MAGNETIC FIELD IN THE SUPERCONDUCTOR BORE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 20.05.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  01.11.2020
FormerRequest for examination was made
Status updated on  11.09.2020
FormerGrant of patent is intended
Status updated on  11.06.2020
FormerRequest for examination was made
Status updated on  24.04.2020
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024 [2024/23]
Applicant(s)For all designated states
Bruker Switzerland AG
Industriestrasse 26
8117 Fällanden / CH
[2020/22]
Inventor(s)01 / Hinderer, Jörg
Am Buchenhain 18
79761 Waldshut-Tiengen / DE
02 / March, Stephen Alfred
Saumackerstr. 62
8048 Zürich / CH
03 / Borgnolutti, Franck
Kurvenstr. 6
8600 Dübendorf / CH
 [2020/22]
Representative(s)Kohler Schmid Möbus Patentanwälte
Partnerschaftsgesellschaft mbB
Gropiusplatz 10
70563 Stuttgart / DE
[2020/22]
Application number, filing date18207267.820.11.2018
[2020/22]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3657193
Date:27.05.2020
Language:EN
[2020/22]
Type: B1 Patent specification 
No.:EP3657193
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)(Supplementary) European search report - dispatched on:EP10.05.2019
ClassificationIPC:G01R33/3815, H01F6/00, H01F6/04, H01F13/00
[2020/22]
CPC:
H01F13/00 (EP); H01F13/003 (US); G01R33/34023 (US);
G01R33/3875 (US); H01F6/00 (EP); H01F6/04 (US);
G01R33/3815 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/22]
TitleGerman:VERFAHREN ZUM MAGNETISIEREN EINES SUPRALEITENDEN MAGNETEN MIT ERZEUGUNG EINES ZUSÄTZLICHEN MAGNETFELDES IN DER SUPRALEITERBOHRUNG[2020/22]
English:METHOD FOR MAGNETIZING A SUPERCONDUCTOR BULK MAGNET, WITH GENERATING AN AUXILIARY MAGNETIC FIELD IN THE SUPERCONDUCTOR BORE[2020/22]
French:PROCÉDÉ DE MAGNÉTISATION D'UN AIMANT SUPRACONDUCTEUR, AVEC GÉNÉRATION D'UN CHAMP MAGNÉTIQUE AUXILIAIRE DANS L'ALÉSAGE DE SUPRACONDUCTEUR[2020/22]
Examination procedure15.10.2019Amendment by applicant (claims and/or description)
15.10.2019Examination requested  [2020/22]
15.10.2019Date on which the examining division has become responsible
12.06.2020Communication of intention to grant the patent
09.09.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
02.11.2020Communication of intention to grant the patent
27.11.2020Fee for grant paid
27.11.2020Fee for publishing/printing paid
27.11.2020Receipt of the translation of the claim(s)
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
19.11.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.11.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
[2024/23]
Former [2023/41]HU20.11.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2023/33]HU20.11.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2023/30]AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/33]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[A]JP2014053479  (AISIN SEIKI, et al) [A] 1,10* paragraphs [0040] , [0 55] , [0 56] *;
 [XI]WO2015015892  (HITACHI LTD [JP]) [X] 10,13-15 * see fig. 5 and the description thereof * [I] 11,12
by applicantDE19908433
 US7859374
 US8228148
 US8948829
 WO2015015892
 US9564262
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.