EP3499905 - POWER AWARE ADAPTION FOR VIDEO STREAMING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.07.2023 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 19.08.2022 | ||
Former | Grant of patent is intended Status updated on 21.04.2022 | ||
Former | Examination is in progress Status updated on 10.06.2020 | ||
Former | Request for examination was made Status updated on 17.05.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states InterDigital Patent Holdings, Inc. 200 Bellevue Parkway, Suite 300 Wilmington, DE 19809 / US | [2023/11] |
Former [2019/25] | For all designated states InterDigital Patent Holdings, Inc. 200 Bellevue Parkway Suite 300 Wilmington, DE 19809 / US | Inventor(s) | 01 /
HE, Yuwen 13542 Silver Vine Path San Diego, CA 92130 / US | 02 /
KUNSTNER, Markus Bozenergasse 20 9020 Klagenfurt / AT | 03 /
YE, Yan 5001 Pearlman Way San Diego, CA 92130 / US | 04 /
NEFF, Ralph 11438 Honey Ridge San Diego, CA 92130 / US | [2019/25] | Representative(s) | AWA Sweden AB Box 45086 104 30 Stockholm / SE | [2022/38] |
Former [2019/25] | AWA Sweden AB P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 18208512.6 | 06.03.2014 | [2019/25] | Priority number, date | US201361773379P | 06.03.2013 Original published format: US 201361773379 P | US201461936828P | 06.02.2014 Original published format: US 201461936828 P | [2019/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3499905 | Date: | 19.06.2019 | Language: | EN | [2019/25] | Type: | B1 Patent specification | No.: | EP3499905 | Date: | 21.09.2022 | Language: | EN | [2022/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.03.2019 | Classification | IPC: | H04N21/443, H04N21/442, H04N21/462, H04N21/845, H04N21/2343, H04N21/262, H04N21/414, H04N21/482, H04N21/8543, H04N21/41 | [2022/18] | CPC: |
H04N21/4424 (EP,KR,US);
H04N21/4436 (EP,KR,US);
H04N21/23439 (EP,KR,US);
H04N21/26258 (EP,US);
H04N21/4126 (EP,KR,US);
H04N21/41407 (EP,US);
H04N21/4621 (EP,KR,US);
H04N21/4825 (EP,US);
H04N21/64322 (US);
|
Former IPC [2019/25] | H04N21/443, H04N21/442, H04N21/462, H04N21/845, H04N21/2343, H04N21/262, H04N21/414, H04N21/482, H04N21/8543 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/25] | Title | German: | ENERGIEBEWUSSTE ANPASSUNG FÜR VIDEOSTREAMING | [2019/25] | English: | POWER AWARE ADAPTION FOR VIDEO STREAMING | [2019/25] | French: | ADAPTATION SENSIBLE À LA PUISSANCE POUR DIFFUSION VIDÉO EN CONTINU | [2019/25] | Examination procedure | 27.11.2018 | Examination requested [2019/25] | 17.12.2019 | Amendment by applicant (claims and/or description) | 16.06.2020 | Despatch of a communication from the examining division (Time limit: M06) | 08.01.2021 | Reply to a communication from the examining division | 31.03.2022 | Date of oral proceedings | 13.04.2022 | Minutes of oral proceedings despatched | 22.04.2022 | Communication of intention to grant the patent | 15.08.2022 | Fee for grant paid | 15.08.2022 | Fee for publishing/printing paid | 15.08.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14715156.7 / EP2965529 | Divisional application(s) | EP22190891.6 / EP4156703 | Opposition(s) | 22.06.2023 | No opposition filed within time limit [2023/35] | Fees paid | Renewal fee | 27.11.2018 | Renewal fee patent year 03 | 27.11.2018 | Renewal fee patent year 04 | 27.11.2018 | Renewal fee patent year 05 | 22.03.2019 | Renewal fee patent year 06 | 27.03.2020 | Renewal fee patent year 07 | 29.03.2021 | Renewal fee patent year 08 | 25.03.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 21.09.2022 | AT | 21.09.2022 | CZ | 21.09.2022 | DK | 21.09.2022 | EE | 21.09.2022 | ES | 21.09.2022 | FI | 21.09.2022 | HR | 21.09.2022 | IT | 21.09.2022 | LT | 21.09.2022 | LV | 21.09.2022 | MC | 21.09.2022 | PL | 21.09.2022 | RO | 21.09.2022 | RS | 21.09.2022 | SE | 21.09.2022 | SI | 21.09.2022 | SK | 21.09.2022 | SM | 21.09.2022 | NO | 21.12.2022 | GR | 22.12.2022 | IS | 21.01.2023 | PT | 23.01.2023 | IE | 06.03.2023 | LU | 06.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | [2024/26] |
Former [2024/12] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
MC | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SI | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
IE | 06.03.2023 | ||
LU | 06.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/09] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
MC | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SI | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
IE | 06.03.2023 | ||
LU | 06.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
MC | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SI | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
IE | 06.03.2023 | ||
LU | 06.03.2023 | ||
Former [2024/02] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
MC | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SI | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
LU | 06.03.2023 | ||
Former [2023/48] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
MC | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SI | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
Former [2023/37] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SI | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
Former [2023/34] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
DK | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
Former [2023/29] | AL | 21.09.2022 | |
AT | 21.09.2022 | ||
CZ | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
Former [2023/26] | AT | 21.09.2022 | |
CZ | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
PL | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
IS | 21.01.2023 | ||
PT | 23.01.2023 | ||
Former [2023/23] | AT | 21.09.2022 | |
CZ | 21.09.2022 | ||
EE | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SK | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
PT | 23.01.2023 | ||
Former [2023/22] | AT | 21.09.2022 | |
CZ | 21.09.2022 | ||
ES | 21.09.2022 | ||
FI | 21.09.2022 | ||
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
RO | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
PT | 23.01.2023 | ||
Former [2023/20] | FI | 21.09.2022 | |
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
SM | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
Former [2023/10] | FI | 21.09.2022 | |
HR | 21.09.2022 | ||
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
NO | 21.12.2022 | ||
GR | 22.12.2022 | ||
Former [2023/09] | FI | 21.09.2022 | |
LT | 21.09.2022 | ||
LV | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
NO | 21.12.2022 | ||
Former [2023/08] | FI | 21.09.2022 | |
LT | 21.09.2022 | ||
RS | 21.09.2022 | ||
SE | 21.09.2022 | ||
NO | 21.12.2022 | Documents cited: | Search | [Y]US2012141089 (HUNT NEIL D [US]) [Y] 1-4,11-13 * figures 1-3, 5 * * paragraphs [0011] , [0 27] * * paragraph [0032] - paragraph [0048] *; | [Y] - MARTIN KENNEDY ET AL, "Dynamic stream control for energy efficient video streaming", BROADBAND MULTIMEDIA SYSTEMS AND BROADCASTING (BMSB), 2011 IEEE INTERNATIONAL SYMPOSIUM ON, IEEE, (20110608), doi:10.1109/BMSB.2011.5954971, ISBN 978-1-61284-121-2, pages 1 - 6, XP031894689 [Y] 1-15 * abstract * * sections II - VI * DOI: http://dx.doi.org/10.1109/BMSB.2011.5954971 | [Y] - SHAOBO ZHANG ET AL, "Out of Band Signalling for Quality Driven Adaptation", 103. MPEG MEETING; 21-1-2013 - 25-1-2013; GENEVA; (MOTION PICTURE EXPERT GROUP OR ISO/IEC JTC1/SC29/WG11),, (20130116), no. m28169, XP030056716 [Y] 1-15 * sections 1-2 * | [Y] - YASUAKI YAMAGISHI ET AL, "Consideration about Quality Signaling", 103. MPEG MEETING; 21-1-2013 - 25-1-2013; GENEVA; (MOTION PICTURE EXPERT GROUP OR ISO/IEC JTC1/SC29/WG11),, (20130119), no. m28215, XP030056762 [Y] 1-15 * section 1-3 * | [A] - ZHAN MA ET AL, "Draft Requirements and Discussion on Green MPEG", 103. MPEG MEETING; 21-1-2013 - 25-1-2013; GENEVA; (MOTION PICTURE EXPERT GROUP OR ISO/IEC JTC1/SC29/WG11),, (20130124), no. m27770, XP030056323 [A] 6 * the whole document * |