| EP3492227 - RAZOR CARTRIDGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.03.2024 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 07.04.2023 | ||
| Former | Grant of patent is intended Status updated on 20.11.2022 | ||
| Former | Examination is in progress Status updated on 17.04.2020 | ||
| Former | Request for examination was made Status updated on 13.12.2019 | ||
| Former | The application has been published Status updated on 03.05.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Dorco Co., Ltd. 36-9 Hyoryeong-ro, 70-gil Seocho-gu Seoul 06723 / KR | [2019/23] | Inventor(s) | 01 /
PARK, Semin Dorco Co., Ltd. 36-9 Hyoryeong-ro, 70-gil Seocho-gu 06723 Seoul / KR | 02 /
AHN, Byungsun Dorco Co., Ltd. 36-9 Hyoryeong-ro, 70-gil Seocho-gu 06723 Seoul / KR | [2019/23] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2019/23] | Application number, filing date | 18209138.9 | 29.11.2018 | [2019/23] | Priority number, date | KR20170162040 | 29.11.2017 Original published format: KR 20170162040 | [2019/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3492227 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Type: | B1 Patent specification | No.: | EP3492227 | Date: | 10.05.2023 | Language: | EN | [2023/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.04.2019 | Classification | IPC: | B26B21/22, B26B21/40 | [2019/23] | CPC: |
B26B21/4025 (EP,US);
B26B21/4012 (EP,KR,US);
B26B21/222 (EP,US);
B26B21/4018 (EP,US);
B26B21/4031 (EP,US);
B26B21/4068 (KR);
B26B21/4075 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/03] |
| Former [2019/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | RASIERKLINGENEINHEIT | [2019/23] | English: | RAZOR CARTRIDGE | [2019/23] | French: | CARTOUCHE DE RASOIR | [2019/23] | Examination procedure | 05.12.2019 | Amendment by applicant (claims and/or description) | 05.12.2019 | Examination requested [2020/03] | 05.12.2019 | Date on which the examining division has become responsible | 21.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.09.2020 | Reply to a communication from the examining division | 11.01.2021 | Despatch of a communication from the examining division (Time limit: M04) | 20.05.2021 | Reply to a communication from the examining division | 24.08.2021 | Despatch of a communication from the examining division (Time limit: M06) | 07.01.2022 | Reply to a communication from the examining division | 21.11.2022 | Communication of intention to grant the patent | 29.03.2023 | Fee for grant paid | 29.03.2023 | Fee for publishing/printing paid | 29.03.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23166840.1 / EP4219099 | Opposition(s) | 13.02.2024 | No opposition filed within time limit [2024/16] | Fees paid | Renewal fee | 26.11.2020 | Renewal fee patent year 03 | 25.11.2021 | Renewal fee patent year 04 | 23.11.2022 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 29.11.2018 | HU | 29.11.2018 | AT | 10.05.2023 | BG | 10.05.2023 | CZ | 10.05.2023 | DK | 10.05.2023 | EE | 10.05.2023 | ES | 10.05.2023 | FI | 10.05.2023 | HR | 10.05.2023 | IT | 10.05.2023 | LT | 10.05.2023 | LV | 10.05.2023 | MC | 10.05.2023 | NL | 10.05.2023 | PL | 10.05.2023 | RO | 10.05.2023 | RS | 10.05.2023 | SE | 10.05.2023 | SI | 10.05.2023 | SK | 10.05.2023 | SM | 10.05.2023 | TR | 10.05.2023 | NO | 10.08.2023 | GR | 11.08.2023 | IS | 10.09.2023 | PT | 11.09.2023 | IE | 29.11.2023 | LU | 29.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | [2026/04] |
| Former [2025/39] | CY | 29.11.2018 | |
| HU | 29.11.2018 | ||
| AT | 10.05.2023 | ||
| BG | 10.05.2023 | ||
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| IE | 29.11.2023 | ||
| LU | 29.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2025/36] | CY | 29.11.2018 | |
| AT | 10.05.2023 | ||
| BG | 10.05.2023 | ||
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| IE | 29.11.2023 | ||
| LU | 29.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/51] | AT | 10.05.2023 | |
| BG | 10.05.2023 | ||
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| IE | 29.11.2023 | ||
| LU | 29.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/47] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| IE | 29.11.2023 | ||
| LU | 29.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/46] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| IE | 29.11.2023 | ||
| LU | 29.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/34] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| LU | 29.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/32] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| MC | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2024/26] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| IT | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2024/24] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SI | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2024/10] | AT | 10.05.2023 | |
| CZ | 10.05.2023 | ||
| DK | 10.05.2023 | ||
| EE | 10.05.2023 | ||
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RO | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2024/08] | AT | 10.05.2023 | |
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| SK | 10.05.2023 | ||
| SM | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2024/03] | AT | 10.05.2023 | |
| ES | 10.05.2023 | ||
| FI | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2024/01] | AT | 10.05.2023 | |
| ES | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| LT | 10.05.2023 | ||
| LV | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2023/51] | AT | 10.05.2023 | |
| ES | 10.05.2023 | ||
| HR | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| RS | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2023/50] | AT | 10.05.2023 | |
| ES | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| PL | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| GR | 11.08.2023 | ||
| IS | 10.09.2023 | ||
| PT | 11.09.2023 | ||
| Former [2023/48] | AT | 10.05.2023 | |
| ES | 10.05.2023 | ||
| NL | 10.05.2023 | ||
| SE | 10.05.2023 | ||
| NO | 10.08.2023 | ||
| PT | 11.09.2023 | ||
| Former [2023/46] | ES | 10.05.2023 | |
| PT | 11.09.2023 | Documents cited: | Search | [XAY] WO2007147420 (BIC VIOLEX SA et al.) [X] 1-3,5-7,10,11,13,14 * page 10, line 28 - page 11, line 29; figures 2, 13-15 *[A] 4,12,15 [Y] 8,9 | [XY] EP0064190 (GILLETTE CO et al.) [X] 1,3,5,10,11 * page 4, line 3 - page 5, line 25; figures 2, 3 *[Y] 8,9 | [X] US2011308089 (BRIDGES KELLY DANIEL et al.) [X] 1-3,5-8,11-15 * paragraphs [0017] , [0 21]; figures 3-5 * | [X] WO9916592 (GILLETTE CO et al.) [X] 1-5,10,11 * page 4, line 14 - page 5, line 31; figures 2, 8-11 * | [X] EP1046473 (WARNER LAMBERT CO et al.) [X] 1,3,5,6,11,13,14 * paragraphs [0020] - [0022] - [0 27]; figures 2, 4-6 * | [A] EP2823941 (GILLETTE CO et al.) [A] 1-15 * paragraphs [0015] - [0025]; figures 2-9 * |