EP3508390 - ABS DISPOSITION STRUCTURE OF SADDLE RIDING VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.11.2020 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 20.12.2019 | ||
Former | Grant of patent is intended Status updated on 25.09.2019 | ||
Former | Request for examination was made Status updated on 07.06.2019 | Most recent event Tooltip | 08.09.2023 | Lapse of the patent in a contracting state New state(s): SI | published on 11.10.2023 [2023/41] | Applicant(s) | For all designated states HONDA MOTOR CO., LTD. 1-1, Minami-Aoyama, 2-chome Minato-ku Tokyo 107-8556 / JP | [2019/28] | Inventor(s) | 01 /
YAMAMOTO, Kanta c/o Honda R&D Co., Ltd. 4-1, Chuo 1-chome Wako-shi, Saitama 351-0193 / JP | 02 /
NOTSU, Kunihiro c/o Honda R&D Co., Ltd. 4-1, Chuo 1-chome Wako-shi, Saitama 351-0193 / JP | [2019/28] | Representative(s) | Weickmann & Weickmann PartmbB Postfach 860 820 81635 München / DE | [2019/28] | Application number, filing date | 18213918.8 | 19.12.2018 | [2019/28] | Priority number, date | JP20170254244 | 28.12.2017 Original published format: JP 2017254244 | [2019/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3508390 | Date: | 10.07.2019 | Language: | EN | [2019/28] | Type: | B1 Patent specification | No.: | EP3508390 | Date: | 22.01.2020 | Language: | EN | [2020/04] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.06.2019 | Classification | IPC: | B60T8/32, B60T8/36, B62K19/30 | [2019/28] | CPC: |
B60T8/3685 (EP,US);
B62K19/38 (CN,US);
B60T8/176 (US);
B60T8/3225 (EP,US);
B62K11/04 (EP,US);
B62K19/30 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/28] | Title | German: | ABS-ANORDNUNGSSTRUKTUR EINES SATTELFAHRZEUGS | [2019/28] | English: | ABS DISPOSITION STRUCTURE OF SADDLE RIDING VEHICLE | [2019/28] | French: | STRUCTURE DE DISPOSITION ABS DE VÉHICULE DE TYPE À SELLE | [2019/28] | Examination procedure | 19.12.2018 | Examination requested [2019/28] | 28.06.2019 | Amendment by applicant (claims and/or description) | 26.09.2019 | Communication of intention to grant the patent | 03.12.2019 | Fee for grant paid | 03.12.2019 | Fee for publishing/printing paid | 03.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 23.10.2020 | No opposition filed within time limit [2020/53] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.12.2018 | AL | 22.01.2020 | AT | 22.01.2020 | CY | 22.01.2020 | CZ | 22.01.2020 | DK | 22.01.2020 | EE | 22.01.2020 | ES | 22.01.2020 | FI | 22.01.2020 | HR | 22.01.2020 | IT | 22.01.2020 | LT | 22.01.2020 | LV | 22.01.2020 | MC | 22.01.2020 | MK | 22.01.2020 | MT | 22.01.2020 | NL | 22.01.2020 | PL | 22.01.2020 | RO | 22.01.2020 | RS | 22.01.2020 | SE | 22.01.2020 | SI | 22.01.2020 | SK | 22.01.2020 | SM | 22.01.2020 | TR | 22.01.2020 | BG | 22.04.2020 | NO | 22.04.2020 | GR | 23.04.2020 | IS | 22.05.2020 | PT | 14.06.2020 | [2023/41] |
Former [2022/33] | HU | 19.12.2018 | |
AL | 22.01.2020 | ||
AT | 22.01.2020 | ||
CY | 22.01.2020 | ||
CZ | 22.01.2020 | ||
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
IT | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
MC | 22.01.2020 | ||
MK | 22.01.2020 | ||
MT | 22.01.2020 | ||
NL | 22.01.2020 | ||
PL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
TR | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2022/31] | HU | 19.12.2018 | |
AL | 22.01.2020 | ||
AT | 22.01.2020 | ||
CY | 22.01.2020 | ||
CZ | 22.01.2020 | ||
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
IT | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
MC | 22.01.2020 | ||
MK | 22.01.2020 | ||
MT | 22.01.2020 | ||
NL | 22.01.2020 | ||
PL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
TR | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2022/30] | HU | 19.12.2018 | |
AL | 22.01.2020 | ||
AT | 22.01.2020 | ||
CY | 22.01.2020 | ||
CZ | 22.01.2020 | ||
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
IT | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
MC | 22.01.2020 | ||
MT | 22.01.2020 | ||
NL | 22.01.2020 | ||
PL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
TR | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2022/27] | HU | 19.12.2018 | |
AT | 22.01.2020 | ||
CY | 22.01.2020 | ||
CZ | 22.01.2020 | ||
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
IT | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
MC | 22.01.2020 | ||
MT | 22.01.2020 | ||
NL | 22.01.2020 | ||
PL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
TR | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2021/40] | AT | 22.01.2020 | |
CZ | 22.01.2020 | ||
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
IT | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
MC | 22.01.2020 | ||
NL | 22.01.2020 | ||
PL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2021/10] | AT | 22.01.2020 | |
CZ | 22.01.2020 | ||
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
IT | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
PL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2020/50] | CZ | 22.01.2020 | |
DK | 22.01.2020 | ||
EE | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2020/49] | CZ | 22.01.2020 | |
DK | 22.01.2020 | ||
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SK | 22.01.2020 | ||
SM | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2020/48] | DK | 22.01.2020 | |
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RO | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
SM | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2020/47] | DK | 22.01.2020 | |
ES | 22.01.2020 | ||
FI | 22.01.2020 | ||
HR | 22.01.2020 | ||
LT | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2020/40] | FI | 22.01.2020 | |
HR | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
IS | 22.05.2020 | ||
PT | 14.06.2020 | ||
Former [2020/39] | FI | 22.01.2020 | |
HR | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
BG | 22.04.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
PT | 14.06.2020 | ||
Former [2020/38] | FI | 22.01.2020 | |
HR | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
NO | 22.04.2020 | ||
GR | 23.04.2020 | ||
PT | 14.06.2020 | ||
Former [2020/37] | FI | 22.01.2020 | |
HR | 22.01.2020 | ||
LV | 22.01.2020 | ||
NL | 22.01.2020 | ||
RS | 22.01.2020 | ||
SE | 22.01.2020 | ||
NO | 22.04.2020 | ||
PT | 14.06.2020 | ||
Former [2020/35] | FI | 22.01.2020 | |
NL | 22.01.2020 | ||
NO | 22.04.2020 | ||
Former [2020/33] | NL | 22.01.2020 | Documents cited: | Search | [A]EP1679243 (HONDA MOTOR CO LTD [JP]) [A] 1-8 * abstract * * figures 1,2,4 *; | [A]US2008079310 (YAMAKURA YUTAKA [JP], et al) [A] 1-8 * abstract ** figures 1,4,11,13 *; | [A]EP2130731 (YAMAHA MOTOR CO LTD [JP]) [A] 1-8 * abstract * * figures 1,8 *; | [A]US2010071985 (HARADA DAI [JP]) [A] 1-8 * abstract * * figures 1-3 *; | [AD]WO2014097504 (KAWASAKI HEAVY IND LTD [JP]) [AD] 1-8 * abstract * * figures 1,3 * |