blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3670323

EP3670323 - AIRCRAFT AND RELATED MANUFACTURING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  13.07.2020
FormerRequest for examination was made
Status updated on  22.05.2020
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
LEONARDO S.p.A.
Piazza Monte Grappa 4
00195 Roma / IT
[2020/26]
Inventor(s)01 / ABDEL NOUR, Pierre
c/o LEONARDO S.p.A., Divisione Elicotteri, Via
Giovanni Agusta, 520, Frazione Cascina Costa
21017 SAMARATE (VA) / IT
02 / PECORARO, Matteo
c/o LEONARDO S.p.A., Divisione Elicotteri, Via
Giovanni Agusta, 520, Frazione Cascina Costa
21017 SAMARATE (VA) / IT
 [2020/26]
Representative(s)Di Sciuva, Michele, et al
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[2020/26]
Application number, filing date18214252.119.12.2018
[2020/26]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3670323
Date:24.06.2020
Language:EN
[2020/26]
Type: B1 Patent specification 
No.:EP3670323
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)(Supplementary) European search report - dispatched on:EP29.04.2019
ClassificationIPC:B64C1/00, B64C29/00, B64C23/06
[2020/26]
CPC:
B64C29/0033 (EP,KR,US); B64C23/069 (KR,US); B64C23/065 (EP);
B64F5/10 (KR); B64C3/56 (EP,KR,US); Y02T50/10 (EP,KR)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/26]
TitleGerman:FLUGZEUG UND ENTSPRECHENDES HERSTELLUNGSVERFAHREN[2020/26]
English:AIRCRAFT AND RELATED MANUFACTURING METHOD[2020/26]
French:AERONEF ET PROCEDE DE FABRICATION ASSOCIE[2020/31]
Former [2020/26]AÉRONEF ET PROCÉDÉ DE FABRICATION ASSOCIÉ
Examination procedure07.05.2019Amendment by applicant (claims and/or description)
13.05.2019Examination requested  [2020/26]
13.05.2019Date on which the examining division has become responsible
14.07.2020Communication of intention to grant the patent
04.11.2020Fee for grant paid
04.11.2020Fee for publishing/printing paid
04.11.2020Receipt of the translation of the claim(s)
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
22.12.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.12.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
MT17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
TR17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
[2024/42]
Former [2024/29]HU19.12.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
TR17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2024/23]HU19.12.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2023/41]HU19.12.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2023/33]HU19.12.2018
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2023/30]AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/33]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[XI]DE202014003490U  (QUAST WILFRIED [DE])
ExaminationUS4545552
 US10106253
by applicantUS211538
 US4691878
 EP1568604
 EP3296202
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.