EP3487114 - METHOD OF SIGNALING CONTROL INFORMATION IN WIRELESS COMMUNICATION SYSTEM WITH MULTIPLE FREQUENCY BLOCKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.09.2022 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 21.10.2021 | ||
Former | Grant of patent is intended Status updated on 07.06.2021 | ||
Former | Examination is in progress Status updated on 28.01.2020 | ||
Former | Request for examination was made Status updated on 05.12.2019 | ||
Former | The application has been published Status updated on 19.04.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero, Yeongdeungpo-Gu Seoul 07336 / KR | [2019/21] | Inventor(s) | 01 /
AHN, Joon Kui LG Institute, Hogye 1(il)-dong, Dongan-gu Anyang-si 431-080 GYEONGGI-DO / KR | 02 /
LEE, Jung Hoon LG Institute, Hogye 1(il)-dong, Dongan-gu Anyang-si 431-080 GYEONGGI-DO / KR | 03 /
SEO, Dong Youn LG Institute, Hogye 1(il)-dong, Dongan-gu Anyang-si 431-080 GYEONGGI-DO / KR | [2019/21] | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2021/46] | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | ||
Former [2019/21] | Cabinet Plasseraud 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | Application number, filing date | 18216008.5 | 03.08.2009 | [2019/21] | Priority number, date | US20088773608P | 11.08.2008 Original published format: US 8773608 P | US20088773408P | 11.08.2008 Original published format: US 8773408 P | KR20090062962 | 10.07.2009 Original published format: KR 20090062962 | [2019/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3487114 | Date: | 22.05.2019 | Language: | EN | [2019/21] | Type: | B1 Patent specification | No.: | EP3487114 | Date: | 17.11.2021 | Language: | EN | [2021/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.03.2019 | Classification | IPC: | H04L5/00, H04L1/00, H04W72/00, H04L1/18, H04L5/06, H04W72/12, H04W72/04 | [2019/21] | CPC: |
H04L5/0007 (EP,KR,US);
H04L5/0094 (EP,KR,US);
H04W72/23 (US);
H04L1/001 (KR);
H04L1/1812 (US);
H04L1/1887 (US);
H04L5/001 (EP,US);
H04L5/0053 (EP,KR,US);
H04L5/06 (EP,KR,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/01] |
Former [2019/21] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR SIGNALISIERUNG VON STEUERUNGSINFORMATIONEN IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM MIT MEHREREN FREQUENZBLÖCKEN | [2019/21] | English: | METHOD OF SIGNALING CONTROL INFORMATION IN WIRELESS COMMUNICATION SYSTEM WITH MULTIPLE FREQUENCY BLOCKS | [2019/21] | French: | PROCÉDÉ DE SIGNALISATION D'INFORMATIONS DE COMMANDE DANS UN SYSTÈME DE COMMUNICATION SANS FIL COMPORTANT PLUSIEURS BLOCS DE FRÉQUENCE | [2019/21] | Examination procedure | 21.11.2019 | Amendment by applicant (claims and/or description) | 21.11.2019 | Examination requested [2020/01] | 21.11.2019 | Date on which the examining division has become responsible | 31.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.06.2020 | Reply to a communication from the examining division | 29.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 02.11.2020 | Reply to a communication from the examining division | 03.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.04.2021 | Reply to a communication from the examining division | 08.06.2021 | Communication of intention to grant the patent | 07.10.2021 | Fee for grant paid | 07.10.2021 | Fee for publishing/printing paid | 07.10.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP09806807.5 / EP2250751 | Opposition(s) | 18.08.2022 | No opposition filed within time limit [2022/43] | Fees paid | Renewal fee | 31.12.2018 | Renewal fee patent year 03 | 31.12.2018 | Renewal fee patent year 04 | 31.12.2018 | Renewal fee patent year 05 | 31.12.2018 | Renewal fee patent year 06 | 31.12.2018 | Renewal fee patent year 07 | 31.12.2018 | Renewal fee patent year 08 | 31.12.2018 | Renewal fee patent year 09 | 31.12.2018 | Renewal fee patent year 10 | 26.08.2019 | Renewal fee patent year 11 | 20.08.2020 | Renewal fee patent year 12 | 24.08.2021 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.08.2009 | AT | 17.11.2021 | CY | 17.11.2021 | CZ | 17.11.2021 | DK | 17.11.2021 | EE | 17.11.2021 | ES | 17.11.2021 | FI | 17.11.2021 | HR | 17.11.2021 | IT | 17.11.2021 | LT | 17.11.2021 | LV | 17.11.2021 | MC | 17.11.2021 | MK | 17.11.2021 | NL | 17.11.2021 | PL | 17.11.2021 | RO | 17.11.2021 | SE | 17.11.2021 | SI | 17.11.2021 | SK | 17.11.2021 | SM | 17.11.2021 | TR | 17.11.2021 | BG | 17.02.2022 | NO | 17.02.2022 | GR | 18.02.2022 | IS | 17.03.2022 | PT | 17.03.2022 | IE | 03.08.2022 | LU | 03.08.2022 | [2024/29] |
Former [2024/23] | HU | 03.08.2009 | |
AT | 17.11.2021 | ||
CY | 17.11.2021 | ||
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
IT | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
MK | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
IE | 03.08.2022 | ||
LU | 03.08.2022 | ||
Former [2024/20] | HU | 03.08.2009 | |
AT | 17.11.2021 | ||
CY | 17.11.2021 | ||
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
IT | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
IE | 03.08.2022 | ||
LU | 03.08.2022 | ||
Former [2024/18] | HU | 03.08.2009 | |
AT | 17.11.2021 | ||
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
IT | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
IE | 03.08.2022 | ||
LU | 03.08.2022 | ||
Former [2023/33] | AT | 17.11.2021 | |
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
IT | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
IE | 03.08.2022 | ||
LU | 03.08.2022 | ||
Former [2023/27] | AT | 17.11.2021 | |
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
IT | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
LU | 03.08.2022 | ||
Former [2023/21] | AT | 17.11.2021 | |
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
LU | 03.08.2022 | ||
Former [2023/16] | AT | 17.11.2021 | |
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
MC | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2023/01] | AT | 17.11.2021 | |
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SI | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2022/35] | AT | 17.11.2021 | |
CZ | 17.11.2021 | ||
DK | 17.11.2021 | ||
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SK | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2022/34] | AT | 17.11.2021 | |
EE | 17.11.2021 | ||
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
RO | 17.11.2021 | ||
SE | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2022/33] | AT | 17.11.2021 | |
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
SE | 17.11.2021 | ||
SM | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2022/25] | AT | 17.11.2021 | |
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
SE | 17.11.2021 | ||
BG | 17.02.2022 | ||
NO | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2022/24] | AT | 17.11.2021 | |
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
NL | 17.11.2021 | ||
PL | 17.11.2021 | ||
SE | 17.11.2021 | ||
BG | 17.02.2022 | ||
GR | 18.02.2022 | ||
IS | 17.03.2022 | ||
PT | 17.03.2022 | ||
Former [2022/23] | AT | 17.11.2021 | |
ES | 17.11.2021 | ||
FI | 17.11.2021 | ||
HR | 17.11.2021 | ||
LT | 17.11.2021 | ||
LV | 17.11.2021 | ||
PL | 17.11.2021 | ||
BG | 17.02.2022 | ||
PT | 17.03.2022 | ||
Former [2022/22] | AT | 17.11.2021 | |
FI | 17.11.2021 | ||
LT | 17.11.2021 | ||
BG | 17.02.2022 | ||
Former [2022/21] | AT | 17.11.2021 | |
BG | 17.02.2022 | ||
Former [2022/19] | BG | 17.02.2022 | Documents cited: | Search | [XI]EP1816883 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [X] 1,2,7,8 * paragraphs [0024] - [0027] * * paragraphs [0106] - [0128] * [I] 3-6,9-13; | [XI]US2007230350 (HEO YOUN-HYOUNG [KR], et al) [X] 1,2,7,8 * paragraphs [0022] - [0036] * * paragraphs [0053] - [0057] *[I] 3-6,9-13 |