blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3643156

EP3643156 - INSERT FOR A SHARE FOR UPROOTING ROOT CROP, CORRESPONDING SET OF INSERTS, SHARE AND METHODS OF MANUFACTURE AND MAINTENANCE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.09.2022
Database last updated on 28.06.2024
FormerThe patent has been granted
Status updated on  22.10.2021
FormerGrant of patent is intended
Status updated on  17.06.2021
FormerExamination is in progress
Status updated on  17.12.2020
FormerRequest for examination was made
Status updated on  30.10.2020
FormerThe application has been published
Status updated on  27.03.2020
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 03.07.2024 [2024/27]
Applicant(s)For all designated states
Exel Industries
54, rue Marcel Paul
51200 Epernay / FR
[2020/18]
Inventor(s)01 / * * *
02 / RICHTER, Eduard
Hagelstädter Strasse 11
93095 Hagelstadt/Gailsbach / DE
 [2021/47]
Former [2020/18]01 / NEUMEIER, Anton
Hans- Carossa-Strasse 6
94315 Straubing / DE
02 / RICHTER, Eduard
Hagelstädter Strasse 11
93095 Hagelstadt/Gailsbach / DE
Representative(s)Lavoix
Bayerstraße 83
80335 München / DE
[2021/47]
Former [2020/18]Lavoix
Bayerstrasse 83
80335 München / DE
Application number, filing date18306381.723.10.2018
[2020/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3643156
Date:29.04.2020
Language:EN
[2020/18]
Type: B1 Patent specification 
No.:EP3643156
Date:24.11.2021
Language:EN
[2021/47]
Search report(s)(Supplementary) European search report - dispatched on:EP04.04.2019
ClassificationIPC:A01D25/02, A01B15/04
[2020/18]
CPC:
A01D25/02 (EP,CN,US); A01B15/04 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/49]
Former [2020/18]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:EINSATZ FÜR EIN SCHAR ZUM ENTWURZELN VON WURZELFRÜCHTEN, ENTSPRECHENDER SATZ VON EINSÄTZEN, SCHAR UND VERFAHREN ZUR HERSTELLUNG UND WARTUNG[2020/18]
English:INSERT FOR A SHARE FOR UPROOTING ROOT CROP, CORRESPONDING SET OF INSERTS, SHARE AND METHODS OF MANUFACTURE AND MAINTENANCE[2020/18]
French:INSERT DE SOC POUR LE DÉRACINEMENT DE TUBERCULES, ENSEMBLE CORRESPONDANT D'INSERTS, SOC ET PROCÉDÉS DE FABRICATION ET D'ENTRETIEN[2020/18]
Examination procedure23.10.2020Amendment by applicant (claims and/or description)
23.10.2020Examination requested  [2020/49]
23.10.2020Date on which the examining division has become responsible
16.12.2020Despatch of a communication from the examining division (Time limit: M04)
12.04.2021Reply to a communication from the examining division
18.06.2021Communication of intention to grant the patent
14.10.2021Fee for grant paid
14.10.2021Fee for publishing/printing paid
14.10.2021Receipt of the translation of the claim(s)
Opposition(s)25.08.2022No opposition filed within time limit [2022/44]
Fees paidRenewal fee
23.09.2020Renewal fee patent year 03
28.09.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.10.2018
AL24.11.2021
AT24.11.2021
CY24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
MK24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
[2024/27]
Former [2024/21]HU23.10.2018
AL24.11.2021
AT24.11.2021
CY24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2024/18]HU23.10.2018
AL24.11.2021
AT24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2023/25]AL24.11.2021
AT24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
IT24.11.2021
LT24.11.2021
LV24.11.2021
MC24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2023/01]AL24.11.2021
AT24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SI24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/49]AL24.11.2021
AT24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/35]AT24.11.2021
CZ24.11.2021
DK24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SK24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/34]AT24.11.2021
EE24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RO24.11.2021
RS24.11.2021
SE24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/33]AT24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
SE24.11.2021
SM24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/25]AT24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
SE24.11.2021
BG24.02.2022
NO24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/24]AT24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
SE24.11.2021
BG24.02.2022
IS24.03.2022
PT24.03.2022
Former [2022/23]AT24.11.2021
ES24.11.2021
FI24.11.2021
HR24.11.2021
LT24.11.2021
LV24.11.2021
PL24.11.2021
RS24.11.2021
BG24.02.2022
PT24.03.2022
Former [2022/22]AT24.11.2021
FI24.11.2021
LT24.11.2021
RS24.11.2021
BG24.02.2022
Former [2022/21]AT24.11.2021
RS24.11.2021
BG24.02.2022
Former [2022/19]BG24.02.2022
Documents cited:Search[YD]DE102013104836  (BETEK GMBH & CO KG [DE]) [YD] 1-13 * figures 1-5 *;
 [XY]WO2015165934  (SANDVIK INTELLECTUAL PROPERTY [SE]) [X] 1,2 * figures 7-10 * [Y] 1-13;
 [XY]DE102017210780  (THYSSENKRUPP AG [DE], et al) [X] 1,2 * figure 2 * [Y] 1-13;
 [X]DE10218778  (RIETER WERKE HAENDLE [DE]) [X] 1 * figure 2 *;
 [A]US1169229  (BIMSON ALFRED G [US]) [A] 1 * figure 1 *
by applicantDE102013104836
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.