blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3608245

EP3608245 - NESTABLE PLATFORM, SUPPORT DEVICE, DECK AND CORRESPONDING METHOD [Right-click to bookmark this link]
Former [2020/07]NESTABLE PLATFORM CONSISTING OF REPLACEABLE ELEMENTS
[2021/29]
StatusNo opposition filed within time limit
Status updated on  19.08.2022
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  10.09.2021
FormerGrant of patent is intended
Status updated on  06.07.2021
FormerExamination is in progress
Status updated on  10.12.2020
FormerRequest for examination was made
Status updated on  14.08.2020
FormerThe application has been published
Status updated on  10.01.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
NAECO SL
P.I. La Floridia Parcela 45
33950 Sotrondio Asturias / ES
[2021/17]
Former [2020/07]For all designated states
Nortpalet Fábrica S.L
P.l. La Florida Parcela 45
33950 Sotrondio, Asturias / ES
Inventor(s)01 / MENÉNDEZ CABO, Maximino
NAECO, S.L.
P.l. La Florida Parcela 45
E-33950 Sotrondio, Asturias / ES
02 / FERNÁNDEZ GUTIÉRREZ, Antón
NAECO, S.L.
P.l. La Florida Parcela 45
E-33950 Sotrondio, Asturias / ES
 [2021/47]
Former [2021/41]01 / * * *
02 / * * *
Former [2020/07]01 / MENÉNDEZ CABO, Maximino
NORTPALET FÁBRICA, S.L.
P.l. La Florida Parcela 45
E-33950 Sotrondio, Asturias / ES
02 / FERNÁNDEZ GUTIÉRREZ, Antón
NORTPALET FÁBRICA, S.L.
P.l. La Florida Parcela 45
E-33950 Sotrondio, Asturias / ES
Representative(s)ABG Intellectual Property Law, S.L.
Avenida de Burgos, 16D
Edificio Euromor
28036 Madrid / ES
[2020/07]
Application number, filing date18382604.910.08.2018
[2020/07]
Filing languageES
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3608245
Date:12.02.2020
Language:EN
[2020/07]
Type: B1 Patent specification 
No.:EP3608245
Date:13.10.2021
Language:EN
[2021/41]
Type: B8 Corrected title page of specification 
No.:EP3608245
Date:24.11.2021
[2021/47]
Search report(s)(Supplementary) European search report - dispatched on:EP17.12.2018
ClassificationIPC:B65D19/32
[2020/07]
CPC:
B65D19/0075 (EP); B65D2519/00034 (EP); B65D2519/00069 (EP);
B65D2519/00129 (EP); B65D2519/00139 (EP); B65D2519/00273 (EP);
B65D2519/00293 (EP); B65D2519/00308 (EP); B65D2519/00323 (EP);
B65D2519/00338 (EP); B65D2519/00407 (EP); B65D2519/00437 (EP);
B65D2519/00562 (EP); B65D2519/00567 (EP); B65D2519/00572 (EP);
B65D2519/0094 (EP); B65D2519/00985 (EP); B65D2519/0099 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/38]
Former [2020/07]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:NESTBARE PALETTE, STÜTZVORRICHTUNG, DECK UND ZUGEHÖRIGES VERFAHREN[2021/29]
English:NESTABLE PLATFORM, SUPPORT DEVICE, DECK AND CORRESPONDING METHOD[2021/29]
French:PALETTE EMBOÎTABLE, DISPOSITIF DE SUPPORT, PLATEAU ET PROCÉDÉ CORRESPONDANT[2021/29]
Former [2020/07]NESTBARE PALETTE BESTEHEND AUS AUSTAUSCHBAREN ELEMENTEN
Former [2020/07]NESTABLE PLATFORM CONSISTING OF REPLACEABLE ELEMENTS
Former [2020/07]PALETTE EMBOÎTABLE CONSTITUÉE D'ÉLÉMENTS REMPLAÇABLES
Examination procedure06.08.2020Amendment by applicant (claims and/or description)
06.08.2020Examination requested  [2020/38]
06.08.2020Date on which the examining division has become responsible
09.12.2020Despatch of a communication from the examining division (Time limit: M04)
07.04.2021Reply to a communication from the examining division
07.07.2021Communication of intention to grant the patent
06.09.2021Fee for grant paid
06.09.2021Fee for publishing/printing paid
06.09.2021Receipt of the translation of the claim(s)
19.10.2021Request for correction of the decision to grant filed
Opposition(s)14.07.2022No opposition filed within time limit [2022/38]
Fees paidRenewal fee
04.08.2020Renewal fee patent year 03
10.08.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.08.2018
AL13.10.2021
AT13.10.2021
CY13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
IT13.10.2021
LT13.10.2021
LV13.10.2021
MC13.10.2021
MK13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
TR13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
[2024/29]
Former [2024/27]HU10.08.2018
AL13.10.2021
AT13.10.2021
CY13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
IT13.10.2021
LT13.10.2021
LV13.10.2021
MC13.10.2021
MK13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2024/21]HU10.08.2018
AL13.10.2021
AT13.10.2021
CY13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
IT13.10.2021
LT13.10.2021
LV13.10.2021
MC13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2024/18]HU10.08.2018
AL13.10.2021
AT13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
IT13.10.2021
LT13.10.2021
LV13.10.2021
MC13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2023/27]AL13.10.2021
AT13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
IT13.10.2021
LT13.10.2021
LV13.10.2021
MC13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2023/16]AL13.10.2021
AT13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
MC13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2023/01]AL13.10.2021
AT13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SI13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/49]AL13.10.2021
AT13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/35]AT13.10.2021
CZ13.10.2021
DK13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/34]AT13.10.2021
EE13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RO13.10.2021
RS13.10.2021
SE13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/33]AT13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RS13.10.2021
SE13.10.2021
SK13.10.2021
SM13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/25]AT13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RS13.10.2021
SE13.10.2021
SK13.10.2021
BG13.01.2022
NO13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/24]AT13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
NL13.10.2021
PL13.10.2021
RS13.10.2021
SE13.10.2021
SK13.10.2021
BG13.01.2022
IS13.02.2022
PT14.02.2022
Former [2022/23]AT13.10.2021
FI13.10.2021
HR13.10.2021
LT13.10.2021
LV13.10.2021
PL13.10.2021
RS13.10.2021
SK13.10.2021
BG13.01.2022
PT14.02.2022
Former [2022/22]AT13.10.2021
FI13.10.2021
LT13.10.2021
RS13.10.2021
BG13.01.2022
Former [2022/21]AT13.10.2021
RS13.10.2021
BG13.01.2022
Former [2022/19]BG13.01.2022
Documents cited:Search[Y]US3294040  (GREGOIRE RESTA S) [Y] 9,21 * column 1, line 8 - column 2, line 54; figures 1-3 *;
 [Y]US4290369  (PROPST ROBERT L, et al) [Y] 9,10,21,22 * column 1, line 25 - column 3, line 11; figures 1-4 *;
 [XAYI]FR2490189  (CATRY GILLES [FR]) [X] 1,4,5,14,16,17,19,20,23,24 * page 1 - page 8 * * figures 1,2 * [A] 8,25 [Y] 9-12,21,22 [I] 2,3,6,15,18;
 [Y]US4735154  (HEMERY ANDRE [FR]) [Y] 12 * column 1, line 63 - column 4, line 64; figure 1 *;
 [Y]JPH06227542  (KYOWA ELECTRIC & CHEMICAL) [Y] 9,10,21,22 * abstract *;
 [X]DE20309286U  (HOLZAPFEL & CO KG GEB [DE]) [X] 1-3,14,15,23,24 * page 6 - page 7; figures 1-7 *;
 [Y]DE202009016385U  (BOSCH GMBH ROBERT [DE]) [Y] 11 * paragraph [0026] - paragraph [0030] * * figures 1-5 *;
 [A]ES1074690U  (QUALITY PACKAGING SYSTEMS S L [ES]) [A] 1-25* figures 1-22 *;
 [Y]US2013119623  (SADEH DAGAN [IL], et al) [Y] 12 * paragraph [0096] - paragraph [0097] * * figure 7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.