EP3568362 - CARTRIDGE AND MACHINE FOR MULTI-COMPONENT BEVERAGE PREPARATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.08.2021 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 11.09.2020 | ||
Former | Grant of patent is intended Status updated on 03.08.2020 | ||
Former | Request for examination was made Status updated on 18.10.2019 | ||
Former | The international publication has been made Status updated on 20.07.2018 | ||
Former | unknown Status updated on 23.01.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Société des Produits Nestlé S.A. Entre-deux-Villes 1800 Vevey / CH | [2019/47] | Inventor(s) | 01 /
TALON, Christian 22C Chemin des Vignes 1134 Vufflens-le-Château / CH | [2019/47] | Application number, filing date | 18700353.8 | 15.01.2018 | [2019/47] | WO2018EP50909 | Priority number, date | EP20170151656 | 16.01.2017 Original published format: EP 17151656 | [2019/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018130698 | Date: | 19.07.2018 | Language: | EN | [2018/29] | Type: | A1 Application with search report | No.: | EP3568362 | Date: | 20.11.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.07.2018 takes the place of the publication of the European patent application. | [2019/47] | Type: | B1 Patent specification | No.: | EP3568362 | Date: | 14.10.2020 | Language: | EN | [2020/42] | Search report(s) | International search report - published on: | EP | 19.07.2018 | Classification | IPC: | B65D85/804 | [2019/47] | CPC: |
B65D85/8055 (EP,US);
A47J31/002 (US);
A47J31/369 (US);
B65D81/3294 (US);
B65D85/8052 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KARTUSCHE UND MASCHINE FÜR MEHRKOMPONENTIGE GETRÄNKEHERSTELLUNG | [2019/47] | English: | CARTRIDGE AND MACHINE FOR MULTI-COMPONENT BEVERAGE PREPARATION | [2019/47] | French: | CARTOUCHE ET MACHINE DE PRÉPARATION DE BOISSON À PLUSIEURS COMPOSANTS | [2020/28] |
Former [2019/47] | CARTOUCHE ET MACHINE DE PRÉPARATION DE BOISSONS À COMPOSANTS MULTIPLES | Entry into regional phase | 16.08.2019 | National basic fee paid | 16.08.2019 | Designation fee(s) paid | 16.08.2019 | Examination fee paid | Examination procedure | 16.08.2019 | Examination requested [2019/47] | 16.08.2019 | Date on which the examining division has become responsible | 04.08.2020 | Communication of intention to grant the patent | 04.09.2020 | Fee for grant paid | 04.09.2020 | Fee for publishing/printing paid | 04.09.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20201561.6 / EP3795496 | Opposition(s) | 15.07.2021 | No opposition filed within time limit [2021/38] | Fees paid | Renewal fee | 14.01.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.01.2018 | AL | 14.10.2020 | AT | 14.10.2020 | CY | 14.10.2020 | CZ | 14.10.2020 | DK | 14.10.2020 | EE | 14.10.2020 | FI | 14.10.2020 | HR | 14.10.2020 | LT | 14.10.2020 | LV | 14.10.2020 | MC | 14.10.2020 | MK | 14.10.2020 | NL | 14.10.2020 | PL | 14.10.2020 | RO | 14.10.2020 | RS | 14.10.2020 | SE | 14.10.2020 | SI | 14.10.2020 | SK | 14.10.2020 | SM | 14.10.2020 | BG | 14.01.2021 | NO | 14.01.2021 | GR | 15.01.2021 | IE | 15.01.2021 | LU | 15.01.2021 | BE | 31.01.2021 | IS | 14.02.2021 | PT | 15.02.2021 | [2024/23] |
Former [2023/33] | HU | 15.01.2018 | |
AL | 14.10.2020 | ||
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
BE | 31.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2023/30] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CY | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
BE | 31.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2022/34] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
BE | 31.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2022/23] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2022/10] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
PT | 15.02.2021 | ||
Former [2022/07] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/50] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SI | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/45] | AL | 14.10.2020 | |
AT | 14.10.2020 | ||
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/43] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/40] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
MC | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/37] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
DK | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/36] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
EE | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/35] | AT | 14.10.2020 | |
CZ | 14.10.2020 | ||
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RO | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SK | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/33] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LT | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/32] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
SM | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/30] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
NL | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/28] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
HR | 14.10.2020 | ||
LV | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/25] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
LV | 14.10.2020 | ||
PL | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
IS | 14.02.2021 | ||
PT | 15.02.2021 | ||
Former [2021/23] | AT | 14.10.2020 | |
FI | 14.10.2020 | ||
LV | 14.10.2020 | ||
RS | 14.10.2020 | ||
SE | 14.10.2020 | ||
BG | 14.01.2021 | ||
NO | 14.01.2021 | ||
GR | 15.01.2021 | ||
PT | 15.02.2021 | ||
Former [2021/22] | FI | 14.10.2020 | |
RS | 14.10.2020 | ||
NO | 14.01.2021 | ||
PT | 15.02.2021 | ||
Former [2021/21] | FI | 14.10.2020 | |
PT | 15.02.2021 | ||
Former [2021/20] | FI | 14.10.2020 | Cited in | International search | [A]WO2006021405 (NESTEC SA [CH], et al) [A] 1-13 * figures 1,15; claim 1 *; | [A]WO2006137737 (FRIESLAND BRANDS BV [NL], et al) [A] 1-13* the whole document *; | [A]WO2012121597 (CUPSYSTEM COMPANY B V [NL], et al) [A] 1-13 * the whole document *; | [A]WO2015022191 (MERCK PATENT GMBH [DE]) [A] 1-13 * the whole document *; | [A]WO2015062703 (MITACA SRL [IT]) [A] 1-13 * figure 4 * | by applicant | EP0512468 | EP1472156 | EP1785369 | EP1808382 |