EP3568313 - CONTACT UNIT FOR A CHARGING STATION, AND METHOD FOR MAKING CONTACT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.01.2023 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 04.02.2022 | ||
Former | Grant of patent is intended Status updated on 26.09.2021 | ||
Former | Request for examination was made Status updated on 18.10.2019 | ||
Former | The international publication has been made Status updated on 20.07.2018 | ||
Former | unknown Status updated on 10.02.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Schunk Transit Systems GmbH Pabinger Str. 7 5151 Nussdorf am Haunsberg / AT | [2022/08] |
Former [2020/17] | For all designated states Schunk Transit Systems GmbH Aupoint 23 5101 Bergheim / AT | ||
Former [2019/47] | For all designated states Schunk Bahn- und Industrietechnik GmbH Aupoint 23 5101 Bergheim / AT | Inventor(s) | 01 /
FELDINGER, Martin Mayerlehen 28 5201 Seekirchen am Wallersee / AT | [2022/10] |
Former [2019/47] | 01 /
FELDINGER, Martin Mayerlehen 40 5201 Seekirchen am Wallersee / AT | Representative(s) | advotec. Patent- und Rechtsanwaltspartnerschaft Tappe mbB Georg-Schlosser-Straße 6 35390 Gießen / DE | [2022/10] |
Former [2019/47] | advotec. Patent- und Rechtsanwälte Georg-Schlosser-Straße 6 35390 Gießen / DE | Application number, filing date | 18702102.7 | 11.01.2018 | [2019/47] | WO2018EP50676 | Priority number, date | DE201710200593 | 16.01.2017 Original published format: DE102017200593 | [2019/47] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018130618 | Date: | 19.07.2018 | Language: | DE | [2018/29] | Type: | A1 Application with search report | No.: | EP3568313 | Date: | 20.11.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 19.07.2018 takes the place of the publication of the European patent application. | [2019/47] | Type: | B1 Patent specification | No.: | EP3568313 | Date: | 09.03.2022 | Language: | DE | [2022/10] | Type: | B9 Corrected patent specification | No.: | EP3568313 | Date: | 11.05.2022 | [2022/19] | Search report(s) | International search report - published on: | EP | 19.07.2018 | Classification | IPC: | B60L5/42, B60L53/30, // B60L5/36 | [2021/39] | CPC: |
B60L5/42 (EP,RU);
B60L53/30 (US);
B60L5/36 (EP,US);
B60L53/32 (EP);
Y02T10/70 (EP);
Y02T10/7072 (EP);
Y02T90/14 (EP)
(-)
|
Former IPC [2019/47] | B60L5/42, B60L11/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/47] | Extension states | BA | 06.08.2019 | ME | 06.08.2019 | Validation states | MA | 06.08.2019 | MD | 06.08.2019 | TN | 06.08.2019 | Title | German: | KONTAKTEINHEIT FÜR EINE LADESTATION UND VERFAHREN ZUR KONTAKTIERUNG | [2019/47] | English: | CONTACT UNIT FOR A CHARGING STATION, AND METHOD FOR MAKING CONTACT | [2019/47] | French: | ENSEMBLE DE CONTACTS POUR STATION DE CHARGE ET PROCÉDÉ DE MISE EN CONTACT | [2019/47] | Entry into regional phase | 06.08.2019 | National basic fee paid | 06.08.2019 | Designation fee(s) paid | 06.08.2019 | Examination fee paid | Examination procedure | 06.08.2019 | Examination requested [2019/47] | 06.08.2019 | Date on which the examining division has become responsible | 24.10.2019 | Amendment by applicant (claims and/or description) | 27.09.2021 | Communication of intention to grant the patent | 17.01.2022 | Fee for grant paid | 17.01.2022 | Fee for publishing/printing paid | 17.01.2022 | Receipt of the translation of the claim(s) | 30.03.2022 | Request for correction of the decision to grant filed | Opposition(s) | 12.12.2022 | No opposition filed within time limit [2023/07] | Fees paid | Renewal fee | 23.01.2020 | Renewal fee patent year 03 | 22.01.2021 | Renewal fee patent year 04 | 28.01.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 09.03.2022 | DK | 09.03.2022 | EE | 09.03.2022 | HR | 09.03.2022 | LT | 09.03.2022 | LV | 09.03.2022 | MC | 09.03.2022 | RS | 09.03.2022 | SI | 09.03.2022 | SK | 09.03.2022 | SM | 09.03.2022 | BG | 09.06.2022 | GR | 10.06.2022 | IS | 09.07.2022 | [2024/29] |
Former [2023/10] | AL | 09.03.2022 | |
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
Former [2023/07] | AL | 09.03.2022 | |
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
Former [2023/01] | AL | 09.03.2022 | |
EE | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
Former [2022/51] | EE | 09.03.2022 | |
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
Former [2022/49] | EE | 09.03.2022 | |
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/48] | EE | 09.03.2022 | |
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/47] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/36] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
BG | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/35] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
RS | 09.03.2022 | ||
BG | 09.06.2022 | ||
Former [2022/33] | LT | 09.03.2022 | Cited in | International search | [A]CN101580024 (UNIV SHANGHAI JIAOTONG [CN]) [A] 1-14 * figures 4,5 *; | [XD]DE102013201491 (SIEMENS AG [DE]) [XD] 13,14 * paragraph [0023] - paragraph [0034]; figures 1,2 *; | [A]DE102013202671 (SCHUNK BAHN & INDUSTRIETECHNIK GMBH [AT]) [A] 1-14 * paragraph [0006] - paragraph [0007]; figure 1 ** paragraph [0032] - paragraph [0034] *; | [X]DE102014213831 (SIEMENS AG [DE]) [X] 13,14 * the whole document *; | [X]EP3031658 (SIEMENS AG [DE]) [X] 13,14 * the whole document * | by applicant | DE102013201491 |