blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3595950

EP3595950 - ACTUATOR COMPRISING A DRIVE UNIT AND A TRANSMISSION UNIT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  26.02.2021
FormerGrant of patent is intended
Status updated on  15.10.2020
FormerRequest for examination was made
Status updated on  20.12.2019
FormerThe international publication has been made
Status updated on  22.09.2018
Formerunknown
Status updated on  16.02.2018
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2020/04]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / WEISSINGER, Daniel
Kornwestheimer Strasse 217
70825 Korntal-Muenchingen / DE
02 / BOLLWERK, Andre
Thymianweg 12
71711 Steinheim An Der Murr / DE
03 / NAGEL, Willi
Bittenfelder Strasse 31
71686 Remseck/Hochdorf / DE
 [2021/13]
Former [2020/04]01 / WEISSINGER, Daniel
Kornwestheimerstrasse 217
70825 Korntal-Muenchingen / DE
02 / BOLLWERK, Andre
Thymianweg 12
71711 Steinheim An Der Murr / DE
03 / NAGEL, Willi
Bittenfelderstrasse 31
71686 Remseck/Hochdorf / DE
Application number, filing date18703247.925.01.2018
[2020/04]
WO2018EP51805
Priority number, dateDE20171020411913.03.2017         Original published format: DE102017204119
[2020/04]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018166685
Date:20.09.2018
Language:DE
[2018/38]
Type: A1 Application with search report 
No.:EP3595950
Date:22.01.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 20.09.2018 takes the place of the publication of the European patent application.
[2020/04]
Type: B1 Patent specification 
No.:EP3595950
Date:31.03.2021
Language:DE
[2021/13]
Search report(s)International search report - published on:EP20.09.2018
ClassificationIPC:B60T13/74, F16H1/06, F16H1/16, F16H57/02, F16H57/021, F16H57/028
[2020/04]
CPC:
F16H57/02 (EP,US); B60T13/746 (EP,KR,US); F16H1/06 (EP,KR,US);
F16H1/16 (EP,KR,US); F16H57/021 (EP,KR); F16H57/028 (EP,KR);
B60Y2400/81 (KR); F16D2121/24 (US); F16H2057/02021 (EP,KR);
F16H2057/02034 (EP,KR,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/04]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:AKTOR MIT EINER ANTRIEBSEINHEIT UND EINER GETRIEBEEINHEIT[2020/04]
English:ACTUATOR COMPRISING A DRIVE UNIT AND A TRANSMISSION UNIT[2020/04]
French:ACTIONNEUR COMPRENANT UNE UNITÉ D'ENTRAÎNEMENT ET UNE UNITÉ DE TRANSMISSION[2020/04]
Entry into regional phase14.10.2019National basic fee paid 
14.10.2019Designation fee(s) paid 
14.10.2019Examination fee paid 
Examination procedure14.10.2019Examination requested  [2020/04]
14.10.2019Date on which the examining division has become responsible
16.10.2020Communication of intention to grant the patent
17.02.2021Fee for grant paid
17.02.2021Fee for publishing/printing paid
17.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
31.01.2020Renewal fee patent year 03
01.02.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.01.2018
AL31.03.2021
CY31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
MT31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
[2024/44]
Former [2024/24]HU25.01.2018
AL31.03.2021
CY31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2024/23]AL31.03.2021
CY31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
MK31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2024/20]AL31.03.2021
CY31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/39]AL31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
MC31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/36]AL31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
IT31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/29]AL31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SI31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/23]AL31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/10]AL31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
IS24.12.2021
Former [2022/08]AL31.03.2021
DK31.03.2021
EE31.03.2021
ES31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2022/07]AL31.03.2021
EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/52]EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
PL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/51]EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
IS31.07.2021
PT02.08.2021
Former [2021/50]EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RO31.03.2021
RS31.03.2021
SE31.03.2021
SK31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
PT02.08.2021
Former [2021/48]EE31.03.2021
FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/46]FI31.03.2021
HR31.03.2021
LT31.03.2021
LV31.03.2021
NL31.03.2021
RS31.03.2021
SE31.03.2021
SM31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/38]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
SE31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/37]FI31.03.2021
HR31.03.2021
LV31.03.2021
RS31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/36]FI31.03.2021
HR31.03.2021
BG30.06.2021
NO30.06.2021
Former [2021/35]FI31.03.2021
HR31.03.2021
NO30.06.2021
Former [2021/33]FI31.03.2021
NO30.06.2021
Cited inInternational search[A]DE3701167  (TRIUMPH ADLER AG) [A] 1-14* figures 1,2 *;
 [A]US5202597  (ISHIDA HIDEKI [US], et al) [A] 1-14 * figure 1 *;
 [A]DE9216772U  (SIEMENS AG [DE]) [A] 1-14 * figure 1 *;
 [A]US5590744  (BELMOND JEAN-MARC [FR]) [A] 1-14 * figure 6 *
by applicantDE102012222949
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.