EP3585615 - METHOD FOR CONTROLLING A DISPLAY DEVICE WHICH IS CONNECTED IN DATA TERMS TO A PRINTING PRESS, AND DISPLAY DEVICE OF A PRINTING PRESS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.11.2021 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 27.11.2020 | ||
Former | Grant of patent is intended Status updated on 13.09.2020 | ||
Former | Request for examination was made Status updated on 05.12.2019 | ||
Former | The international publication has been made Status updated on 01.09.2018 | ||
Former | unknown Status updated on 16.02.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Koenig & Bauer AG Friedrich-Koenig-Str. 4 97080 Würzburg / DE | [2020/01] | Inventor(s) | 01 /
ENGELHARDT, David Wacholderstr. 2 49124 Georgsmarienhütte / DE | 02 /
WILLEKE, Harald Robert-Koch-Str. 12a 33102 Paderborn / DE | [2020/01] | Representative(s) | Koenig & Bauer AG - Lizenzen - Patente - Friedrich-Koenig-Straße 4 97080 Würzburg / DE | [2020/01] | Application number, filing date | 18703288.3 | 31.01.2018 | [2020/01] | WO2018EP52385 | Priority number, date | DE201710202937 | 23.02.2017 Original published format: DE102017202937 | [2020/01] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018153628 | Date: | 30.08.2018 | Language: | DE | [2018/35] | Type: | A1 Application with search report | No.: | EP3585615 | Date: | 01.01.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.08.2018 takes the place of the publication of the European patent application. | [2020/01] | Type: | B1 Patent specification | No.: | EP3585615 | Date: | 30.12.2020 | Language: | DE | [2020/53] | Search report(s) | International search report - published on: | EP | 30.08.2018 | Classification | IPC: | B41F33/00 | [2020/01] | CPC: |
B41F33/0009 (EP,US);
B41F33/0045 (EP,US);
B41F33/0054 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR STEUERUNG EINER MIT EINER DRUCKMASCHINE DATENTECHNISCH VERBUNDENEN ANZEIGEEINRICHTUNG UND ANZEIGEEINRICHTUNG EINER DRUCKMASCHINE | [2020/01] | English: | METHOD FOR CONTROLLING A DISPLAY DEVICE WHICH IS CONNECTED IN DATA TERMS TO A PRINTING PRESS, AND DISPLAY DEVICE OF A PRINTING PRESS | [2020/01] | French: | PROCÉDÉ PERMETTANT DE COMMANDER UN DISPOSITIF D'AFFICHAGE RELIÉ PAR TRANSMISSION DE DONNÉES À UNE MACHINE D'IMPRESSION ET DISPOSITIF D'AFFICHAGE D'UNE MACHINE D'IMPRESSION | [2020/01] | Entry into regional phase | 12.07.2019 | National basic fee paid | 12.07.2019 | Designation fee(s) paid | 12.07.2019 | Examination fee paid | Examination procedure | 12.07.2019 | Amendment by applicant (claims and/or description) | 12.07.2019 | Examination requested [2020/01] | 12.07.2019 | Date on which the examining division has become responsible | 14.09.2020 | Communication of intention to grant the patent | 20.11.2020 | Fee for grant paid | 20.11.2020 | Fee for publishing/printing paid | 20.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.10.2021 | No opposition filed within time limit [2021/49] | Fees paid | Renewal fee | 20.01.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.01.2018 | AL | 30.12.2020 | CY | 30.12.2020 | CZ | 30.12.2020 | DK | 30.12.2020 | EE | 30.12.2020 | ES | 30.12.2020 | FI | 30.12.2020 | HR | 30.12.2020 | IT | 30.12.2020 | LT | 30.12.2020 | LV | 30.12.2020 | MC | 30.12.2020 | MK | 30.12.2020 | NL | 30.12.2020 | PL | 30.12.2020 | RO | 30.12.2020 | RS | 30.12.2020 | SE | 30.12.2020 | SI | 30.12.2020 | SK | 30.12.2020 | SM | 30.12.2020 | BE | 31.01.2021 | CH | 31.01.2021 | IE | 31.01.2021 | LI | 31.01.2021 | LU | 31.01.2021 | BG | 30.03.2021 | NO | 30.03.2021 | GR | 31.03.2021 | IS | 30.04.2021 | PT | 30.04.2021 | [2024/23] |
Former [2023/33] | HU | 31.01.2018 | |
AL | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
SM | 30.12.2020 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2023/30] | AL | 30.12.2020 | |
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2023/29] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/34] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/23] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/13] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/10] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/08] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/07] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
CH | 31.01.2021 | ||
IE | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/52] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/49] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/48] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/45] | AL | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/43] | CZ | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
LU | 31.01.2021 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/42] | CZ | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/39] | CZ | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/36] | CZ | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/35] | CZ | 30.12.2020 | |
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/33] | FI | 30.12.2020 | |
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/28] | FI | 30.12.2020 | |
HR | 30.12.2020 | ||
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/23] | FI | 30.12.2020 | |
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/22] | FI | 30.12.2020 | |
RS | 30.12.2020 | ||
NO | 30.03.2021 | ||
Former [2021/20] | FI | 30.12.2020 | Cited in | International search | [A]EP1889721 (ROLAND MAN DRUCKMASCH [DE]) [A] 1-30* the whole document *; | [AD]EP2090434 (MANROLAND AG [DE]) [AD] 1-30 * the whole document *; | [AD]DE102009027142 (KOENIG & BAUER AG [DE]) [AD] 1-30 * the whole document * | by applicant | DE102009027142 | EP2090434 | DE102011075347 |