EP3577661 - CABLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 02.02.2022 | ||
Former | Request for examination was made Status updated on 25.01.2022 | ||
Former | Grant of patent is intended Status updated on 26.09.2021 | ||
Former | Request for examination was made Status updated on 08.11.2019 | ||
Former | The international publication has been made Status updated on 11.08.2018 | ||
Former | unknown Status updated on 22.02.2018 | Most recent event Tooltip | 28.07.2023 | Lapse of the patent in a contracting state New state(s): IT | published on 30.08.2023 [2023/35] | Applicant(s) | For all designated states LEONI Kabel GmbH An der Lände 3 91154 Roth / DE | [2020/16] |
Former [2019/50] | For all designated states LEONI Kabel GmbH Marienstrasse 7 90402 Nürnberg / DE | Inventor(s) | 01 /
DREINER, Michael Zur Grube 6B 51688 Wipperfürth / DE | 02 /
MOSEBACH, Jens Im Siebenborn 54 51688 Wipperfürth / DE | 03 /
WINKELMANN, Holger Wienbergweg 14 58313 Herdecke / DE | [2019/50] | Representative(s) | FDST Patentanwälte Nordostpark 16 90411 Nürnberg / DE | [2019/50] | Application number, filing date | 18704145.4 | 12.01.2018 | [2019/50] | WO2018EP50744 | Priority number, date | DE201710201554 | 31.01.2017 Original published format: DE102017201554 | DE201710207655 | 05.05.2017 Original published format: DE102017207655 | [2019/50] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018141530 | Date: | 09.08.2018 | Language: | DE | [2018/32] | Type: | A1 Application with search report | No.: | EP3577661 | Date: | 11.12.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 09.08.2018 takes the place of the publication of the European patent application. | [2019/50] | Type: | B1 Patent specification | No.: | EP3577661 | Date: | 30.03.2022 | Language: | DE | [2022/13] | Search report(s) | International search report - published on: | EP | 09.08.2018 | Classification | IPC: | H01B7/285, H01B13/22, H01B7/02, H01B13/14, H01B7/29 | [2019/50] | CPC: |
H01B7/285 (EP);
H01B13/221 (EP,US);
H01B13/0016 (US);
H01B13/148 (US);
H01B7/0283 (EP);
H01B7/292 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/50] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | KABEL | [2019/50] | English: | CABLE | [2019/50] | French: | CÂBLE | [2019/50] | Entry into regional phase | 08.07.2019 | National basic fee paid | 08.07.2019 | Designation fee(s) paid | 08.07.2019 | Examination fee paid | Examination procedure | 08.07.2019 | Amendment by applicant (claims and/or description) | 08.07.2019 | Examination requested [2019/50] | 08.07.2019 | Date on which the examining division has become responsible | 27.09.2021 | Communication of intention to grant the patent | 24.01.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 24.01.2022 | Fee for grant paid | 24.01.2022 | Fee for publishing/printing paid | 09.02.2022 | Communication of intention to grant the patent | 22.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Fees paid | Renewal fee | 23.01.2020 | Renewal fee patent year 03 | 21.01.2021 | Renewal fee patent year 04 | 19.01.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 30.03.2022 | CZ | 30.03.2022 | DK | 30.03.2022 | EE | 30.03.2022 | ES | 30.03.2022 | FI | 30.03.2022 | HR | 30.03.2022 | IT | 30.03.2022 | LT | 30.03.2022 | LV | 30.03.2022 | NL | 30.03.2022 | PL | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SI | 30.03.2022 | SK | 30.03.2022 | SM | 30.03.2022 | BG | 30.06.2022 | NO | 30.06.2022 | GR | 01.07.2022 | IS | 30.07.2022 | PT | 01.08.2022 | [2023/35] |
Former [2023/25] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/07] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/51] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/50] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/49] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/48] | CZ | 30.03.2022 | |
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/47] | ES | 30.03.2022 | |
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/44] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
NL | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/36] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/35] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
NO | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | |
NO | 30.06.2022 | Cited in | International search | [A]US5220133 (SUTHERLAND JACK E [US], et al) [A] 1-12* the whole document *; | [X]WO2006070314 (SCHLUMBERGER CA LTD [CA], et al) [X] 1,9,12 * figures 4-6 * * paragraph [00031] *; | [XI]WO2011156659 (SCHLUMBERGER CA LTD [CA], et al) [X] 1,9,12 * figures 3a, 3b, 4a-4g, 5a-5h, 6a-6e * * paragraph [0017] - paragraph [0023] * * paragraph [0031] * [I] 2-6,11; | [X]EP2581918 (TE WIRE & CABLE LLC [US]) [X] 1,7-10 * figure 1 * * paragraph [0015] - paragraph [0021] * * paragraph [0033] - paragraph [0035] * |