blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3573663

EP3573663 - A COMPOSITION COMPRISING AT LEAST ONE GNRH ANTAGONIST [Right-click to bookmark this link]
Former [2019/49]A composition comprising at least one GNRH antagonist
[2020/27]
StatusNo opposition filed within time limit
Status updated on  11.02.2022
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  05.03.2021
FormerGrant of patent is intended
Status updated on  13.01.2021
FormerRequest for examination was made
Status updated on  27.11.2020
FormerGrant of patent is intended
Status updated on  28.07.2020
FormerRequest for examination was made
Status updated on  01.11.2019
FormerThe international publication has been made
Status updated on  04.08.2018
Formerunknown
Status updated on  09.03.2018
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Antev Limited
3rd Floor, 106 New Bond Street
London W1S 1DN / GB
[2020/15]
Former [2019/49]For all designated states
Antev Limited
22 South Molton Street
London
W1K 5RB / GB
Inventor(s)01 / LARSEN, Finn
18 Forest Road
Bonchester Bridge
Hawick TD9 8JS / GB
 [2019/49]
Representative(s)Holme Patent A/S
Valbygårdsvej 33
2500 Valby / DK
[2019/49]
Application number, filing date18707414.130.01.2018
[2019/49]
WO2018IB50559
Priority number, dateUS201762452096P30.01.2017         Original published format: US 201762452096 P
[2019/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018138703
Date:02.08.2018
Language:EN
[2018/31]
Type: A1 Application with search report 
No.:EP3573663
Date:04.12.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 02.08.2018 takes the place of the publication of the European patent application.
[2019/49]
Type: B1 Patent specification 
No.:EP3573663
Date:07.04.2021
Language:EN
[2021/14]
Search report(s)International search report - published on:EP02.08.2018
ClassificationIPC:A61K45/06, A61K38/09, A61P35/00
[2019/49]
CPC:
A61K38/09 (EP,KR,US); A61K45/06 (EP,KR,US); A61K47/26 (KR,US);
A61K9/0019 (KR,US); A61K9/10 (KR); A61P13/00 (EP);
A61P13/08 (EP,KR); A61P15/00 (EP); A61P35/00 (EP,KR,US);
A61P43/00 (EP); A61P5/26 (EP,KR); A61P5/30 (EP,KR);
A61K2300/00 (KR) (-)
C-Set:
A61K38/09, A61K2300/00 (US,EP);
A61K45/06, A61K2300/00 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/49]
Extension statesBA30.08.2019
ME30.08.2019
Validation statesMA30.08.2019
MD30.08.2019
TN30.08.2019
TitleGerman:ZUSAMMENSETZUNG MIT MINDESTENS EINEM GNRH-ANTAGONISTEN[2019/49]
English:A COMPOSITION COMPRISING AT LEAST ONE GNRH ANTAGONIST[2020/27]
French:COMPOSITION COMPRENANT AU MOINS UN ANTAGONISTE DE LA GNRH[2019/49]
Former [2019/49]A composition comprising at least one GNRH antagonist
Entry into regional phase30.08.2019National basic fee paid 
30.08.2019Designation fee(s) paid 
30.08.2019Examination fee paid 
Examination procedure23.08.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
28.08.2019Amendment by applicant (claims and/or description)
30.08.2019Examination requested  [2019/49]
30.08.2019Date on which the examining division has become responsible
29.07.2020Communication of intention to grant the patent
27.11.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
14.01.2021Communication of intention to grant the patent
26.02.2021Fee for grant paid
26.02.2021Fee for publishing/printing paid
26.02.2021Receipt of the translation of the claim(s)
Divisional application(s)EP20165541.2  / EP3701965
Opposition(s)10.01.2022No opposition filed within time limit [2022/11]
Fees paidRenewal fee
31.01.2020Renewal fee patent year 03
01.02.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.01.2018
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
MT07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
[2024/44]
Former [2024/24]HU30.01.2018
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2024/23]AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2024/20]AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/39]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/29]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/26]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/23]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/10]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/09]AT07.04.2021
CZ07.04.2021
DK07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/08]AT07.04.2021
CZ07.04.2021
DK07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/07]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/52]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/51]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
RS07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/50]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
Former [2021/49]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
Former [2021/46]AT07.04.2021
FI07.04.2021
LT07.04.2021
NL07.04.2021
BG07.07.2021
Cited inInternational search[XY]WO2008071984  (ARDANA BIOSCIENCE LTD [GB], et al);
 [XY]WO2013104745  (FERRING BV [NL]);
by applicantWO0154662
 WO03022243
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.