EP3583305 - SYSTEMS INCLUDING AN ELECTRICALLY ASSISTED TURBOCHARGER AND METHODS OF USING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 28.11.2021 | ||
Former | Examination is in progress Status updated on 24.07.2020 | ||
Former | Request for examination was made Status updated on 22.11.2019 | ||
Former | The international publication has been made Status updated on 25.08.2018 | ||
Former | unknown Status updated on 10.03.2018 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states BorgWarner Inc. 3850 Hamlin Road Auburn Hills, MI 48326 / US | [2019/52] | Inventor(s) | 01 /
FRASER, Brock, Sterling 506 Sugar Maple Lane Asheville, NC 28805 / US | [2019/52] | Representative(s) | Peterreins Schley Patent- und Rechtsanwälte PartG mbB Hermann-Sack-Straße 3 80331 München / DE | [N/P] |
Former [2022/18] | Peterreins Schley Patent- und Rechtsanwälte PartG mbB Hermann-Sack-Strasse 3 80331 München / DE | ||
Former [2019/52] | Peterreins Schley Patent- und Rechtsanwälte Hermann-Sack-Strasse 3 80331 München / DE | Application number, filing date | 18707822.5 | 13.02.2018 | [2019/52] | WO2018US17953 | Priority number, date | US201715433376 | 15.02.2017 Original published format: US201715433376 | [2019/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018152091 | Date: | 23.08.2018 | Language: | EN | [2018/34] | Type: | A1 Application with search report | No.: | EP3583305 | Date: | 25.12.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.08.2018 takes the place of the publication of the European patent application. | [2019/52] | Type: | B1 Patent specification | No.: | EP3583305 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | International search report - published on: | EP | 23.08.2018 | Classification | IPC: | F02B37/10, F02B37/12, F02B37/14, F02B37/16, F02B39/10 | [2021/45] | CPC: |
F02B37/168 (EP,KR,US);
F02B37/10 (EP,KR,US);
F02B37/14 (EP,KR,US);
F02B37/166 (EP,KR,US);
F02B39/10 (EP,KR,US);
F02B2037/125 (EP,KR,US);
Y02T10/12 (EP,KR,US)
(-)
|
Former IPC [2019/52] | F02B37/10, F02B37/14, F02B37/16, F02B39/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEME MIT EINEM ELEKTRISCH UNTERSTÜTZTEN TURBOLADER UND VERFAHREN ZUR VERWENDUNG DAVON | [2019/52] | English: | SYSTEMS INCLUDING AN ELECTRICALLY ASSISTED TURBOCHARGER AND METHODS OF USING THE SAME | [2019/52] | French: | SYSTÈMES COMPRENANT UN TURBOCOMPRESSEUR ASSISTÉ ÉLECTRIQUEMENT ET LEURS PROCÉDÉS D'UTILISATION | [2019/52] | Entry into regional phase | 13.09.2019 | National basic fee paid | 13.09.2019 | Designation fee(s) paid | 13.09.2019 | Examination fee paid | Examination procedure | 13.09.2019 | Examination requested [2019/52] | 13.09.2019 | Date on which the examining division has become responsible | 25.03.2020 | Amendment by applicant (claims and/or description) | 28.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.12.2020 | Reply to a communication from the examining division | 05.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 14.06.2021 | Reply to a communication from the examining division | 29.11.2021 | Communication of intention to grant the patent | 29.03.2022 | Fee for grant paid | 29.03.2022 | Fee for publishing/printing paid | 29.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 10.02.2020 | Renewal fee patent year 03 | 09.02.2021 | Renewal fee patent year 04 | 09.02.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 04.05.2022 | AT | 04.05.2022 | CZ | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | IT | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | NL | 04.05.2022 | PL | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SE | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/11] |
Former [2023/44] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/48] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Cited in | International search | [X]DE10139526 (DAIMLER CHRYSLER AG [DE]) [X] 1-7 * paragraph [0023] - paragraph [0036]; figure 1 *; | [XI]WO2004104390 (RICARDO UK LTD [GB], et al) [X] 1-4,8-11,14,19 * page 4, line 9 - page 8, line 3; figures 1, 2, 4 * [I] 5-7,12,13,15-18,20-23; | [A]JP2005016464 (ISHIKAWAJIMA HARIMA HEAVY IND) [A] 12,13,15-17,20-23 * paragraph [0050] - paragraph [0055] *; | [XI]WO2006022635 (HONEYWELL INT INC [US], et al) [X] 1-11,14,18,19 * page 5, line 1 - page 9, line 22; figures 2, 3, 4; claim 3 * * page 10, line 14 - line 15; figure 5 * * page 13, line 14 - line 22 * [I] 12,13,15-17,20-23; | [A]US2010296914 (STAROSELSKY SERGE [US], et al) [A] 12,13,15-17,20-23 * paragraph [0046] - paragraph [0048]; figure 10 *; | [A]WO2014117006 (TRANE INT INC [US]) [A] 12,13,15-17,20-23* page 4, line 7 - line 9 * |