blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3589472

EP3589472 - PROCESS AND APPARATUS FOR PRODUCING SHAPED PROFILE SECTIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.07.2023
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  19.08.2022
FormerGrant of patent is intended
Status updated on  06.04.2022
FormerRequest for examination was made
Status updated on  06.12.2019
FormerThe international publication has been made
Status updated on  11.09.2018
Formerunknown
Status updated on  23.03.2018
Most recent event   Tooltip27.10.2023Lapse of the patent in a contracting state
New state(s): MC
published on 29.11.2023  [2023/48]
Applicant(s)For all designated states
KINGSPAN HOLDINGS (IRL) LIMITED
Dublin Road
Co Cavan Kingscourt / IE
[2020/02]
Inventor(s)01 / RIPLEY, Lynne
c/o Kingspan Insulation Limited
Torvale Industrial Estate
Pembridge
Leominster HR6 9LA / GB
02 / COPPOCK, Vincent
c/o Kingspan Insulation Limited
Torvale Industrial Estate
Pembridge
Leominster HR6 9LA / GB
03 / GOGARTY, Stephen
c/o Kingspan Insulation Limited
Torvale Industrial Estate
Pembridge
Leominster HR6 9LA / GB
04 / OLIVER, David
c/o Kingspan Insulation Limited
Torvale Industrial Estate
Pembridge
Leominster HR6 9LA / GB
05 / HOBBS, Peter
c/o Kingspan Insulation Limited
Torvale Industrial Estate
Pembridge
Leominster HR6 9LA / GB
 [2020/02]
Representative(s)Tomkins & Co
5 Dartmouth Road
Dublin 6 / IE
[2020/02]
Application number, filing date18708994.105.03.2018
[2020/02]
WO2018EP55295
Priority number, dateGB2017000346603.03.2017         Original published format: GB 201703466
[2020/02]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2018158461
Date:07.09.2018
Language:EN
[2018/36]
Type: A2 Application without search report 
No.:EP3589472
Date:08.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 07.09.2018 takes the place of the publication of the European patent application.
[2020/02]
Type: B1 Patent specification 
No.:EP3589472
Date:21.09.2022
Language:EN
[2022/38]
Search report(s)International search report - published on:EP11.10.2018
ClassificationIPC:B29C44/32, B29C44/30, F16L59/14, B29D23/00, B29L23/00, B29K67/00
[2020/02]
CPC:
B29C44/321 (EP,US); B29C44/1242 (GB); B29C44/1228 (GB,US);
B29C44/30 (EP,US); B29C44/324 (EP,GB,US); B29C44/328 (GB,US);
B29D23/001 (GB); B29D99/0003 (EP,GB,US); B32B1/08 (US);
B32B15/046 (US); B32B15/082 (US); B32B15/20 (US);
F16L59/14 (EP,GB); B29K2067/00 (EP,US); B29L2023/00 (GB);
B29L2023/225 (EP,US); B32B2260/021 (US); B32B2260/046 (US);
B32B2262/0276 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/38]
Former [2020/02]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG VON GEFORMTEN PROFILABSCHNITTEN[2020/02]
English:PROCESS AND APPARATUS FOR PRODUCING SHAPED PROFILE SECTIONS[2020/02]
French:PROCÉDÉ ET APPAREIL DE PRODUCTION DE SECTIONS DE PROFILÉS MISE EN FORME[2022/17]
Former [2020/02]PROCÉDÉ ET APPAREIL DE PRODUCTION DE SECTIONS DE PROFIL MISES EN FORME
Entry into regional phase17.09.2019National basic fee paid 
17.09.2019Designation fee(s) paid 
17.09.2019Examination fee paid 
Examination procedure20.12.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
17.09.2019Examination requested  [2020/02]
17.09.2019Date on which the examining division has become responsible
09.04.2020Amendment by applicant (claims and/or description)
07.04.2022Communication of intention to grant the patent
12.08.2022Fee for grant paid
12.08.2022Fee for publishing/printing paid
12.08.2022Receipt of the translation of the claim(s)
Opposition(s)22.06.2023No opposition filed within time limit [2023/35]
Fees paidRenewal fee
09.12.2019Renewal fee patent year 03
05.01.2021Renewal fee patent year 04
10.01.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
MC21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
[2023/48]
Former [2023/37]AL21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SI21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/29]AL21.09.2022
CZ21.09.2022
EE21.09.2022
ES21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/26]CZ21.09.2022
EE21.09.2022
ES21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
PL21.09.2022
RO21.09.2022
RS21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
IS21.01.2023
PT23.01.2023
Former [2023/23]CZ21.09.2022
EE21.09.2022
ES21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
RO21.09.2022
RS21.09.2022
SK21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
PT23.01.2023
Former [2023/22]CZ21.09.2022
ES21.09.2022
HR21.09.2022
LT21.09.2022
LV21.09.2022
RO21.09.2022
RS21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
PT23.01.2023
Former [2023/20]HR21.09.2022
LT21.09.2022
LV21.09.2022
RS21.09.2022
SM21.09.2022
NO21.12.2022
GR22.12.2022
Former [2023/10]HR21.09.2022
LT21.09.2022
LV21.09.2022
RS21.09.2022
NO21.12.2022
GR22.12.2022
Former [2023/09]LT21.09.2022
LV21.09.2022
RS21.09.2022
NO21.12.2022
Former [2023/08]LT21.09.2022
RS21.09.2022
NO21.12.2022
Cited inInternational search[XY]GB965185  (DANIEL ROSENTHAL) [X] 2-4,21,22,31,37-40,44,45,54-60,66-68 * page 1, line 10 - line 20 * * page 1, line 65 - page 2, line 23 * * page 4, line 9 - line 29 * * page 7, line 15 - line 67 * * figures 15-18 * [Y] 1;
 [Y]US3585678  (NEUMANN PETER, et al) [Y] 1 * column 7, line 20 - line 43 *;
 [Y]DE2411396  (KABEL METALLWERKE GHH) [Y] 5-7,10-20,41-43 * page 4, line 12 - line 28 ** figures 1-3 *;
 [XYI]US2015233517  (HOLLAND PHILIP [GB]) [X] 2-4,21,22,30-32,36-40,44,45,53-60,66-68 * paragraphs [0001] , [0007] , [0009] , [0021] , [0038] , [0042] - [0044] - [0049] , [0051] , [0064] * * figures 1,2,3,4 * [Y] 1,5-7,10-20,41-43 [I] 8,9,33-35
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.