blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3589666

EP3589666 - PROCESS FOR PRODUCING MONOVINYLAROMATIC POLYMER INCORPORATING POST-CONSUMER RECYCLED POLYSTYRENE AND INSTALLATION TO PRODUCE A MONOVINYLAROMATIC POLYMER COMPRISING POST-CONSUMER RECYCLED POLYSTYRENE [Right-click to bookmark this link]
Former [2020/02]PROCESS FOR PRODUCING MONOVINYLAROMATIC POLYMER INCORPORATING POST-CONSUMER RECYCLED POLYSTYRENE, MONOVINYLAROMATIC POLYMER INCORPORATING POST-CONSUMER RECYCLED POLYSTYRENE AND ARTICLES PRODUCED THEREOF
[2020/31]
StatusNo opposition filed within time limit
Status updated on  19.11.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  11.12.2020
FormerGrant of patent is intended
Status updated on  04.08.2020
FormerRequest for examination was made
Status updated on  06.12.2019
FormerThe international publication has been made
Status updated on  11.09.2018
Formerunknown
Status updated on  23.03.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Total Research & Technology Feluy
Zone Industrielle C
7181 Seneffe / BE
[2020/02]
Inventor(s)01 / PERE, José-Maria
Paissos Catalans 16
Esc A, 1º 2ª
Sant Just Desvern
08960 Barcelona / ES
02 / GUINOVART, Antonio
C./Borriana 111
1º- 1ª
08030 Barcelona / ES
03 / SIGWALD, Armelle
Rue Chambille 4
1400 Nivelles / BE
04 / URBANCZYK, Laetitia
rue du Chateau 19
6150 Anderlues / BE
05 / SLAWINSKI, Martine
Allée des Couterelles 7
1400 Nivelles / BE
06 / CHARLIER, Pascal
Rue de la Resistance 82
1140 Evere / BE
07 / PERCHE, Elodie
Rue Gachard 100
1000 Bruxelles / BE
08 / EON, Serge
Clos de Differdange 17
1410 Waterloo / BE
09 / MARCOUX, Thierry
Rue de Brocqueroy 7A
7061 Casteau / BE
10 / ADAM-BERRET, Matthieu
Rue Hautebois 18b
6230 Thimeon / BE
 [2020/48]
Former [2020/10]01 / PERE, José-Maria
Paissos Catalans
Esc A, 1º 2ª
Sant Just Desvern
08960 Barcelona / ES
02 / GUINOVART, Antonio
C./Borriana 111
1º- 1ª
08030 Barcelona / ES
03 / SIGWALD, Armelle
Rue Chambille 4
1400 Nivelles / BE
04 / URBANCZYK, Laetitia
rue du Chateau 19
6150 Anderlues / BE
05 / SLAWINSKI, Martine
Allée des Couterelles 7
1400 Nivelles / BE
06 / CHARLIER, Pascal
Rue de la Resistance 82
1140 Evere / BE
07 / PERCHE, Elodie
Rue Gachard 100
1000 Bruxelles / BE
08 / EON, Serge
Clos de Differdange 17
1410 Waterloo / BE
09 / MARCOUX, Thierry
Rue de Brocqueroy 7A
7061 Casteau / BE
10 / ADAM-BERRET, Matthieu
Rue Hautebois 18b
6230 Thimeon / BE
Former [2020/02]01 / PERE, Jose-Maria
Paissos Catalans
Esc A, 1º 2ª
Sant Just Desvern
08960 Barcelona / ES
02 / GUINOVART, Antonio
C./Borriana 111
1º- 1ª
08030 Barcelona / ES
03 / SIGWALD, Armelle
Rue Chambille 4
1400 Nivelles / BE
04 / URBANCZYK, Laetitia
rue du Chateau 19
6150 Anderlues / BE
05 / SLAWINSKI, Martine
Allée des Couterelles 7
1400 Nivelles / BE
06 / CHARLIER, Pascal
Rue de la Resistance 82
1140 Evere / BE
07 / PERCHE, Elodie
Rue Gachard 100
1000 Bruxelles / BE
08 / EON, Serge
Clos de Differdange 17
1410 Waterloo / BE
09 / MARCOUX, Thierry
Rue de Brocqueroy 7A
7061 Casteau / BE
10 / ADAM-BERRET, Matthieu
Rue Hautebois 18b
6230 Thimeon / BE
Representative(s)Garcia Martin, Margarita
Total Research & Technology Feluy
Patent Department
Zone Industrielle Feluy C
7181 Seneffe / BE
[2020/02]
Application number, filing date18709307.528.02.2018
[2020/02]
WO2018EP54868
Priority number, dateEP2017015833328.02.2017         Original published format: EP 17158333
[2020/02]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018158285
Date:07.09.2018
Language:EN
[2018/36]
Type: A1 Application with search report 
No.:EP3589666
Date:08.01.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 07.09.2018 takes the place of the publication of the European patent application.
[2020/02]
Type: B1 Patent specification 
No.:EP3589666
Date:13.01.2021
Language:EN
[2021/02]
Search report(s)International search report - published on:EP07.09.2018
ClassificationIPC:C08F257/02, C08F112/08, C08L25/06, C08J11/04, B29B17/02, // B29K105/04, B29K25/00, C08J11/08
[2020/31]
CPC:
C08F112/08 (EP); C08L25/06 (EP,US); B29B17/02 (EP,US);
C08F257/02 (EP,US); C08J11/04 (US); C08J11/08 (EP);
B29B17/0412 (EP); B29B2017/0015 (US); B29B2017/0224 (EP,US);
B29B2017/0293 (EP,US); B29B2017/0296 (EP); B29B2017/042 (US);
B29K2025/06 (EP,US); B29K2105/04 (EP); C08F2400/00 (US);
C08J2325/06 (US); C08J2327/06 (EP); C08L2205/02 (EP);
Y02W30/52 (EP); Y02W30/62 (EP) (-)
C-Set:
C08F257/02, C08F212/08 (EP);
C08L25/06, C08L25/06 (EP);
C08L25/06, C08L51/003 (EP)
Former IPC [2020/02]C08F257/02, C08F112/08, C08L25/06, C08J11/04, B01J8/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES MONOVINYLAROMATISCHEN POLYMERS, DAS RECYCELTES POST-VERBRAUCHER-POLYSTYROL ENTHÄLT UND ANLAGE ZUR HERSTELLUNG EINES MONOVINYLAROMATISCHEN POLYMERS, DAS RECYCELTES POST-VERBRAUCHER-POLYSTYROL ENTHÄLT[2020/31]
English:PROCESS FOR PRODUCING MONOVINYLAROMATIC POLYMER INCORPORATING POST-CONSUMER RECYCLED POLYSTYRENE AND INSTALLATION TO PRODUCE A MONOVINYLAROMATIC POLYMER COMPRISING POST-CONSUMER RECYCLED POLYSTYRENE[2020/31]
French:PROCÉDÉ DE PRODUCTION D'UN POLYMÈRE MONOVINYLAROMATIQUE COMPRENANT DU POLYSTYRÈNE RECYCLÉ POST-CONSOMMATEUR ET INSTALLATION POUR PRODUIRE UN POLYMÈRE MONOVINYLAROMATIQUE COMPRENANT DU POLYSTYRÈNE RECYCLÉ POST-CONSOMMATEUR[2020/31]
Former [2020/02]VERFAHREN ZUR HERSTELLUNG EINES MONOVINYLAROMATISCHEN POLYMERS MIT POST-CONSUMER-RECYCELTEM POLYSTYROL, MONOVINYLAROMATISCHES POLYMER MIT POST-CONSUMER-RECYCELTEM POLYSTYROL UND DARAUS HERGESTELLTE ARTIKEL
Former [2020/02]PROCESS FOR PRODUCING MONOVINYLAROMATIC POLYMER INCORPORATING POST-CONSUMER RECYCLED POLYSTYRENE, MONOVINYLAROMATIC POLYMER INCORPORATING POST-CONSUMER RECYCLED POLYSTYRENE AND ARTICLES PRODUCED THEREOF
Former [2020/02]PROCÉDÉ DE PRODUCTION DE POLYMÈRE MONOVINYLAROMATIQUE INCORPORANT DU POLYSTYRÈNE RECYCLÉ POST-CONSOMMATEUR, POLYMÈRE MONOVINYLAROMATIQUE INCORPORANT DU POLYSTYRÈNE RECYCLÉ POST-CONSOMMATEUR ET ARTICLES PRODUITS CORRESPONDANTS
Entry into regional phase14.08.2019National basic fee paid 
14.08.2019Designation fee(s) paid 
14.08.2019Examination fee paid 
Examination procedure20.12.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
14.08.2019Examination requested  [2020/02]
14.08.2019Date on which the examining division has become responsible
03.04.2020Amendment by applicant (claims and/or description)
05.08.2020Communication of intention to grant the patent
02.12.2020Fee for grant paid
02.12.2020Fee for publishing/printing paid
02.12.2020Receipt of the translation of the claim(s)
Opposition(s)14.10.2021No opposition filed within time limit [2021/51]
Fees paidRenewal fee
28.02.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.02.2018
AL13.01.2021
AT13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
MK13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
TR13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
[2024/29]
Former [2024/23]HU28.02.2018
AL13.01.2021
AT13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
MK13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2023/33]HU28.02.2018
AL13.01.2021
AT13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2023/30]AL13.01.2021
AT13.01.2021
CY13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2022/23]AL13.01.2021
AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2022/13]AL13.01.2021
AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SI13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2022/10]AL13.01.2021
AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2022/08]AL13.01.2021
AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
ES13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2022/07]AL13.01.2021
AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/50]AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RO13.01.2021
RS13.01.2021
SE13.01.2021
SK13.01.2021
SM13.01.2021
CH28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/49]AT13.01.2021
CZ13.01.2021
DK13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
SM13.01.2021
CH28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/48]AT13.01.2021
CZ13.01.2021
EE13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
SM13.01.2021
CH28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/46]AT13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
SM13.01.2021
CH28.02.2021
LI28.02.2021
LU28.02.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/45]AT13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
MC13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/42]AT13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
IS13.05.2021
PT13.05.2021
Former [2021/39]AT13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
PL13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/38]AT13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
RS13.01.2021
SE13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/37]AT13.01.2021
FI13.01.2021
HR13.01.2021
LT13.01.2021
LV13.01.2021
RS13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/36]FI13.01.2021
HR13.01.2021
LT13.01.2021
BG13.04.2021
NO13.04.2021
GR14.04.2021
PT13.05.2021
Former [2021/35]FI13.01.2021
HR13.01.2021
LT13.01.2021
NO13.04.2021
PT13.05.2021
Former [2021/33]FI13.01.2021
LT13.01.2021
NO13.04.2021
PT13.05.2021
Cited inInternational search[I]US5269948  (KRUTCHEN CHARLES M [US]) [I] 1-15 * example - *;
 [A]DE4319180  (BASF AG [DE]) [A] 1-15 * example - *;
 [A]US5824709  (SUKA MOTOSHI [JP]) [A] 1-15 * figure 1 * * example -; claim - *;
 [A]US6663773  (RICKETT JOHN W [US], et al) [A] 1-15* figure -; claim - *;
 [A]CN102241798  (UNIV HUBEI, et al) [A] 1-15 * the whole document *;
 [I]US2014107307  (FROST JACK M [US], et al) [I] 1-15 * figure 4 * * paragraph [0063] - paragraph [0076] * * example - *
by applicantUS8609778
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.