EP3596520 - ASSEMBLIES OF DETACHABLE OPTICAL CONNECTORS AND OPTICAL CHIPS [Right-click to bookmark this link] | |||
Former [2020/04] | DETACHABLE OPTICAL CONNECTORS FOR OPTICAL CHIPS AND METHODS OF FABRICATING THE SAME | ||
[2022/03] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 09.01.2022 | ||
Former | Examination is in progress Status updated on 26.03.2021 | ||
Former | Request for examination was made Status updated on 20.12.2019 | ||
Former | The international publication has been made Status updated on 22.09.2018 | ||
Former | unknown Status updated on 17.04.2018 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states Corning Research & Development Corporation One Riverfront Plaza Corning, New York 14831 / US | [2020/04] | Inventor(s) | 01 /
BRUSBERG, Lars Martin Otfried 272 E. 2nd Street Corning, New York 14830 / US | 02 /
BUTLER, Douglas Llewellyn 25 Katie Lane Painted Post, New York 14870 / US | 03 /
DE JONG, Michael 605 Beverly Drive Colleyville, Texas 76034 / US | 04 /
EVANS, Alan Frank 5090 Hornby Road Beaver Dams, New York 14812 / US | [2020/04] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2020/04] | Application number, filing date | 18715321.8 | 13.03.2018 | [2020/04] | WO2018US22091 | Priority number, date | US201762472025P | 16.03.2017 Original published format: US 201762472025 P | [2020/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018169899 | Date: | 20.09.2018 | Language: | EN | [2018/38] | Type: | A1 Application with search report | No.: | EP3596520 | Date: | 22.01.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.09.2018 takes the place of the publication of the European patent application. | [2020/04] | Type: | B1 Patent specification | No.: | EP3596520 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | EP | 20.09.2018 | Classification | IPC: | G02B6/30, G02B6/38, G02B6/42 | [2020/04] | CPC: |
G02B6/30 (EP,US);
G02B6/122 (US);
G02B6/136 (US);
G02B6/3885 (EP,US);
G02B6/403 (US);
G02B6/4292 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ANORDNUNGEN ANLÖSBARER OPTISCHER VERBINDER UND OPTISCHER CHIPS | [2022/03] | English: | ASSEMBLIES OF DETACHABLE OPTICAL CONNECTORS AND OPTICAL CHIPS | [2022/03] | French: | ENSEMBLES DE CONNECTEURS OPTIQUES DÉTACHABLES ET DE PUCES OPTIQUES | [2022/03] |
Former [2020/04] | LÖSBARE OPTISCHE VERBINDER FÜR OPTISCHE CHIPS UND VERFAHREN ZUR HERSTELLUNG DAVON | ||
Former [2020/04] | DETACHABLE OPTICAL CONNECTORS FOR OPTICAL CHIPS AND METHODS OF FABRICATING THE SAME | ||
Former [2020/04] | CONNECTEURS OPTIQUES DÉTACHABLES DESTINÉS À DES PUCES OPTIQUES ET LEURS PROCÉDÉS DE FABRICATION | Entry into regional phase | 13.09.2019 | National basic fee paid | 13.09.2019 | Designation fee(s) paid | 13.09.2019 | Examination fee paid | Examination procedure | 13.09.2019 | Examination requested [2020/04] | 13.09.2019 | Date on which the examining division has become responsible | 08.04.2020 | Amendment by applicant (claims and/or description) | 25.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 20.07.2021 | Reply to a communication from the examining division | 10.01.2022 | Communication of intention to grant the patent | 22.03.2022 | Fee for grant paid | 22.03.2022 | Fee for publishing/printing paid | 22.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 10.03.2020 | Renewal fee patent year 03 | 09.03.2021 | Renewal fee patent year 04 | 16.03.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 27.04.2022 | AT | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/11] |
Former [2023/48] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | Cited in | International search | [XI]JP2004347811 (MATSUSHITA ELECTRIC WORKS LTD) [X] 1-3,11-16,36-39 * abstract * * paragraphs [0024] , [0027] , [0028] * [I] 4-10,17-35; | [XI]US2005018993 (ROLSTON DAVID ROBERT CAMERON [CA], et al) [X] 1,10,36,37 * paragraph [0076] - paragraph [0084]; figures 12,14 * [I] 2-9,11-35,38,39; | [X]US2006002665 (KIANI SEPEHR [US], et al) [X] 1,19,36 * figures 3,5D *; | [XI]US2008298743 (SARAVANOS KONSTANTINOS [US], et al) [X] 1-3,10-12,19-22,30,31,36-39 * paragraphs [0008] , [0058] - [0064]; figures 13-16 * [I] 4-9,13-18,23-29,32-35; | [A]US2016004021 (PELLETIER FRANÇOIS [CA], et al) [A] 17,18* paragraph [0030] * | Examination | EP2402805 |