blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3612736

EP3612736 - ELECTROHYDRAULIC SYSTEM FOR UNDER WATER USE, WITH AN ELECTROHYDRAULIC ACTUATOR [Right-click to bookmark this link]
Former [2020/09]ELECTROHYDRAULIC SYSTEM FOR USE UNDER WATER, COMPRISING AN ELECTROHYDRAULIC ACTUATOR
[2022/32]
StatusNo opposition filed within time limit
Status updated on  20.10.2023
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  11.11.2022
FormerGrant of patent is intended
Status updated on  18.09.2022
FormerRequest for examination was made
Status updated on  24.01.2020
FormerThe international publication has been made
Status updated on  27.10.2018
Formerunknown
Status updated on  25.04.2018
Most recent event   Tooltip26.07.2024Lapse of the patent in a contracting state
New state(s): AT
published on 28.08.2024  [2024/35]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2020/09]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / ORTH, Alexandre
Fruehlingstrasse 16C
97297 Waldbuettelbrunn / DE
02 / HENDRIX, Gottfried
Gartenstrasse 35
97737 Gemuenden / DE
 [2020/09]
Application number, filing date18717311.706.04.2018
[2020/09]
WO2018EP58888
Priority number, dateDE20171020659619.04.2017         Original published format: DE102017206596
[2020/09]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018192783
Date:25.10.2018
Language:DE
[2018/43]
Type: A1 Application with search report 
No.:EP3612736
Date:26.02.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 25.10.2018 takes the place of the publication of the European patent application.
[2020/09]
Type: B1 Patent specification 
No.:EP3612736
Date:14.12.2022
Language:DE
[2022/50]
Search report(s)International search report - published on:EP25.10.2018
ClassificationIPC:F15B15/18
[2020/09]
CPC:
F15B15/18 (EP,US); E21B33/063 (EP); E21B34/04 (US);
F15B7/006 (US); B63G2008/004 (EP); F15B1/265 (EP);
F15B2211/20507 (EP); F15B2211/20515 (US); F15B2211/20561 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/09]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ELEKTROHYDRAULISCHES SYSTEM FÜR DEN EINSATZ UNTER WASSER MIT EINEM ELEKTROHYDRAULISCHEN STELLANTRIEB[2020/09]
English:ELECTROHYDRAULIC SYSTEM FOR UNDER WATER USE, WITH AN ELECTROHYDRAULIC ACTUATOR[2022/32]
French:SYSTÈME ELECTROHYDRAULIQUE SOUS-MARIN, AVEC UN ACTIONNEUR ELECTROHYDRAULIQUE[2022/32]
Former [2020/09]ELECTROHYDRAULIC SYSTEM FOR USE UNDER WATER, COMPRISING AN ELECTROHYDRAULIC ACTUATOR
Former [2020/09]SYSTÈME ÉLECTROHYDRAULIQUE POUR UNE UTILISATION SOUS L'EAU COMPRENANT UN ENTRAÎNEMENT DE RÉGLAGE ÉLECTROHYDRAULIQUE
Entry into regional phase19.11.2019National basic fee paid 
19.11.2019Designation fee(s) paid 
19.11.2019Examination fee paid 
Examination procedure19.11.2019Examination requested  [2020/09]
19.11.2019Date on which the examining division has become responsible
30.04.2020Amendment by applicant (claims and/or description)
19.09.2022Communication of intention to grant the patent
07.11.2022Fee for grant paid
07.11.2022Fee for publishing/printing paid
07.11.2022Receipt of the translation of the claim(s)
Opposition(s)15.09.2023No opposition filed within time limit [2023/47]
Fees paidRenewal fee
30.04.2020Renewal fee patent year 03
30.04.2021Renewal fee patent year 04
02.05.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
IT14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
AT06.04.2023
IE06.04.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
[2024/35]
Former [2024/26]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
IT14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
IE06.04.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
Former [2024/21]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
IE06.04.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
Former [2024/11]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
Former [2024/09]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
CH30.04.2023
LI30.04.2023
Former [2024/08]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
Former [2024/04]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
LU06.04.2023
IS14.04.2023
PT14.04.2023
Former [2023/51]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/46]AL14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/39]AL14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/38]AL14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
GR15.03.2023
PT14.04.2023
Former [2023/37]AL14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
GR15.03.2023
PT14.04.2023
Former [2023/35]CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
GR15.03.2023
PT14.04.2023
Former [2023/34]EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
GR15.03.2023
PT14.04.2023
Former [2023/33]ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
GR15.03.2023
Former [2023/29]FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RS14.12.2022
SE14.12.2022
GR15.03.2023
Former [2023/25]FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
RS14.12.2022
SE14.12.2022
GR15.03.2023
Former [2023/23]FI14.12.2022
LT14.12.2022
LV14.12.2022
SE14.12.2022
GR15.03.2023
Former [2023/22]FI14.12.2022
LT14.12.2022
SE14.12.2022
Former [2023/20]LT14.12.2022
Cited inInternational search[Y]US3572032  (TERRY WILLIAM M) [Y] 1-12 * column 1, line 53 - column 2, line 8 ** column 3, line 17 - column 4, line 28 *;
 [Y]JPH07223589  (MITSUBISHI HEAVY IND LTD) [Y] 1-12 * abstract *;
 [XYI]DE102015213695  (BOSCH GMBH ROBERT [DE]) [X] 13 * paragraphs [0037] , [0056] - [0063] * [Y] 1-12 [I] 14
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.