blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3776960

EP3776960 - POWER CONTROL FOR FEEDBACK SIGNALING [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  16.02.2024
Database last updated on 03.06.2024
FormerExamination is in progress
Status updated on  10.06.2022
FormerRequest for examination was made
Status updated on  15.01.2021
FormerThe international publication has been made
Status updated on  12.10.2019
Formerunknown
Status updated on  01.05.2018
Most recent event   Tooltip16.02.2024Application deemed to be withdrawnpublished on 20.03.2024  [2024/12]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
Torshamnsgatan 23
164 83 Stockholm / SE
[2021/07]
Inventor(s)01 / BALDEMAIR, Robert
Honnörsgatan 16
170 69 Solna / SE
 [2021/07]
Representative(s)Valea AB
Box 7086
103 87 Stockholm / SE
[2021/07]
Application number, filing date18718537.606.04.2018
[2021/07]
WO2018SE50363
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019194712
Date:10.10.2019
Language:EN
[2019/41]
Type: A1 Application with search report 
No.:EP3776960
Date:17.02.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 10.10.2019 takes the place of the publication of the European patent application.
[2021/07]
Search report(s)International search report - published on:EP10.10.2019
ClassificationIPC:H04L1/18, H04W52/14, H04W52/32, H04L5/00, H04L1/00
[2021/07]
CPC:
H04L1/1864 (EP); H04W52/146 (EP,US); H04L1/0027 (US);
H04L1/0072 (EP,US); H04L1/1896 (EP,US); H04L5/0055 (EP,US);
H04W52/346 (EP,US); H04L1/0045 (EP); H04L5/001 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/07]
TitleGerman:LEISTUNGSREGELUNG FÜR RÜCKKOPPLUNGSSIGNALISIERUNG[2021/07]
English:POWER CONTROL FOR FEEDBACK SIGNALING[2021/07]
French:CONTRÔLE DE PUISSANCE POUR SIGNALISATION DE RETOUR[2021/07]
Entry into regional phase02.10.2020National basic fee paid 
02.10.2020Designation fee(s) paid 
02.10.2020Examination fee paid 
Examination procedure02.10.2020Examination requested  [2021/07]
02.10.2020Date on which the examining division has become responsible
10.05.2021Amendment by applicant (claims and/or description)
13.06.2022Despatch of a communication from the examining division (Time limit: M04)
10.10.2022Reply to a communication from the examining division
01.11.2023Application deemed to be withdrawn, date of legal effect  [2024/12]
22.11.2023Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2024/12]
Fees paidRenewal fee
02.10.2020Renewal fee patent year 03
27.04.2021Renewal fee patent year 04
27.04.2022Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
30.04.202306   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[Y]US2013182676  (LEE HYUNWOO [KR], et al) [Y] 1-13 * paragraph [0066] * * paragraph [0144] - paragraph [0152] * * paragraph [0217] * * paragraph [0163] - paragraph [0168] * * paragraph [0241] - paragraph [0251] * * paragraph [0257] - paragraph [0262] * * paragraph [0466] - paragraph [0467] * * figures 29, 38 *;
 [Y]US2015230242  (PAPASAKELLARIOU ARIS [US], et al) [Y] 1-13 * paragraph [0008] - paragraph [0010] * * paragraph [0042] - paragraph [0058] * * paragraph [0091] - paragraph [0101] * * figure 10 *;
 [A]US2017048052  (LEE HYUNWOO [KR], et al) [A] 1-13 * paragraph [0476] - paragraph [0479] ** figure 40 *;
 [A]  - SAMSUNG, "Corrections on HARQ Feedback", vol. RAN WG1, no. Vancouver, Canada; 20180122 - 20180126, (20180113), 3GPP DRAFT; R1-1800453 HARQ FEEDBACK, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5FAH/NR%5FAH%5F1801/Docs/, (20180113), XP051384879 [A] 1-13 * page 5 - page 8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.