EP3631195 - WIND TURBINE INSTALLATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 21.05.2021 | ||
Former | Grant of patent is intended Status updated on 20.01.2021 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The international publication has been made Status updated on 01.12.2018 | ||
Former | unknown Status updated on 25.05.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Baggermaatschappij Boskalis B.V. Rosmolenweg 20 3356 LK Papendrecht / NL | [2020/15] | Inventor(s) | 01 /
VAN BERGEN, Marcel Remco Jochem c/o Baggermaatschappij Boskalis B.V. Rosmolenweg 20 3356 LK Papendrecht / NL | 02 /
VAN GIFFEN, Ike Klaas c/o Baggermaatschappij Boskalis B.V. Rosmolenweg 20 3356 LK Papendrecht / NL | [2020/15] | Representative(s) | Geurts, Franciscus Antonius Octrooibureau Vriesendorp & Gaade B.V. Koninginnegracht 19 2514 AB Den Haag / NL | [2020/15] | Application number, filing date | 18724289.6 | 22.05.2018 | [2020/15] | WO2018EP63372 | Priority number, date | NL20172018964 | 22.05.2017 Original published format: NL 2018964 | [2020/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018215458 | Date: | 29.11.2018 | Language: | EN | [2018/48] | Type: | A1 Application with search report | No.: | EP3631195 | Date: | 08.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.11.2018 takes the place of the publication of the European patent application. | [2020/15] | Type: | B1 Patent specification | No.: | EP3631195 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | International search report - published on: | EP | 29.11.2018 | Classification | IPC: | F03D1/06, B66C1/10, F03D13/10 | [2020/15] | CPC: |
F03D13/10 (EP,KR);
B63B27/10 (KR);
B66C1/108 (EP,KR);
F03D1/0658 (EP);
F05B2240/912 (KR);
Y02E10/70 (KR)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | WINDKRAFTANLAGE INSTALLATION | [2021/03] | English: | WIND TURBINE INSTALLATION | [2020/15] | French: | INSTALLATION D'ÉOLIENNE | [2020/15] |
Former [2020/15] | WINDTURBINENANLAGE | Entry into regional phase | 21.10.2019 | National basic fee paid | 21.10.2019 | Designation fee(s) paid | 21.10.2019 | Examination fee paid | Examination procedure | 10.01.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 21.10.2019 | Amendment by applicant (claims and/or description) | 21.10.2019 | Examination requested [2020/15] | 21.10.2019 | Date on which the examining division has become responsible | 21.01.2021 | Communication of intention to grant the patent | 17.05.2021 | Fee for grant paid | 17.05.2021 | Fee for publishing/printing paid | 17.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 25.05.2020 | Renewal fee patent year 03 | 17.05.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.05.2018 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | IT | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | TR | 23.06.2021 | BG | 23.09.2021 | GR | 24.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2024/29] |
Former [2024/24] | HU | 22.05.2018 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/23] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/20] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2023/06] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/36] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/29] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/26] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/11] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/09] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
PT | 25.10.2021 | ||
Former [2022/08] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2022/07] | AT | 23.06.2021 | |
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/51] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/49] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/47] | FI | 23.06.2021 | |
LT | 23.06.2021 | ||
BG | 23.09.2021 | ||
Former [2021/46] | FI | 23.06.2021 | |
LT | 23.06.2021 | Cited in | International search | [A]JPH06257555 (ISHIKAWAJIMA HARIMA HEAVY IND) [A] 1,10 * paragraph [0011]; figures 1,2 * * paragraph [0016] - paragraph [0018] * * paragraph [0022] *; | [Y]US2010313417 (LEBON JEAN-DANIEL [FR], et al) [Y] 8,9* paragraph [0047] - paragraph [0048]; figure 5 *; | [Y]GB2483677 (VESTAS WIND SYS AS [DK]) [Y] 3,4,10-17,19 * page 1, line 5 - line 28; figures 2,4,6,8,9 * * page 7, line 16 - line 30 * * page 9, line 6 - page 10, line 30 * * page 13, line 14 - line 36 * * page 15, line 13 - line 16 * * page 19, line 29 - page 20, line 12 *; | [IA]EP2574773 (SEAWAY HEAVY LIFTING ENGINEERING B V [NL]) [I] 18 * paragraph [0012] - paragraph [0014]; figures 1,2 * [A] 1,10; | [XY]KR20140001704 (SAMSUNG HEAVY IND [KR]) [X] 1,2,5-7 * paragraph [0027] - paragraph [0030]; figures 1-8 * * paragraph [0036] * * paragraph [0050] - paragraph [0053] * * paragraph [0061] - paragraph [0065] * * paragraph [0072] - paragraph [0078] * * paragraph [0085] - paragraph [0087] * * paragraph [0097] - paragraph [0099] * * paragraph [0104] * * paragraph [0128] - paragraph [0131] * * paragraph [0147] - paragraph [0149] * [Y] 3,4,8-17,19 |