blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3787943

EP3787943 - REDUNDANT BRAKING UNIT FOR A BRAKING SYSTEM AND SYSTEM USING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.04.2023
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  20.05.2022
FormerGrant of patent is intended
Status updated on  06.01.2022
FormerRequest for examination was made
Status updated on  05.02.2021
FormerThe international publication has been made
Status updated on  08.11.2019
Formerunknown
Status updated on  30.05.2018
Most recent event   Tooltip09.02.2024Lapse of the patent in a contracting state
New state(s): IT
published on 13.03.2024  [2024/11]
Applicant(s)For all designated states
VOLVO TRUCK CORPORATION
405 08 Göteborg / SE
[2021/10]
Inventor(s)01 / HENDERSON, Leon
Syster Estrids Gata 6
41325 Göteborg / SE
02 / OSCARSSON, Christian
Almvägen 7
44447 Stenungsund / SE
03 / LAINE, Leo
Stugvägen 4
438 94 HÄRRYDA / SE
 [2021/10]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2021/10]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date18725125.103.05.2018
[2021/10]
WO2018EP61374
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019210960
Date:07.11.2019
Language:EN
[2019/45]
Type: A1 Application with search report 
No.:EP3787943
Date:10.03.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 07.11.2019 takes the place of the publication of the European patent application.
[2021/10]
Type: B1 Patent specification 
No.:EP3787943
Date:22.06.2022
Language:EN
[2022/25]
Search report(s)International search report - published on:EP07.11.2019
ClassificationIPC:B60T13/68
[2021/10]
CPC:
B60T13/683 (EP,US); B60T13/662 (US); B60T2270/413 (US);
B60T8/1708 (US); B60T8/327 (US); B60Y2400/81 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:REDUNDANTE BREMSEINHEIT FÜR EIN BREMSSYSTEM UND SYSTEM DAMIT[2021/10]
English:REDUNDANT BRAKING UNIT FOR A BRAKING SYSTEM AND SYSTEM USING SAME[2021/10]
French:UNITÉ DE FREINAGE REDONDANTE POUR UN SYSTÈME DE FREINAGE ET SYSTÈME L'UTILISANT[2021/10]
Entry into regional phase14.10.2020National basic fee paid 
14.10.2020Designation fee(s) paid 
14.10.2020Examination fee paid 
Examination procedure14.10.2020Examination requested  [2021/10]
14.10.2020Date on which the examining division has become responsible
07.01.2022Communication of intention to grant the patent
16.05.2022Fee for grant paid
16.05.2022Fee for publishing/printing paid
16.05.2022Receipt of the translation of the claim(s)
Opposition(s)23.03.2023No opposition filed within time limit [2023/22]
Fees paidRenewal fee
14.10.2020Renewal fee patent year 03
21.04.2021Renewal fee patent year 04
22.04.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
IT22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
[2024/11]
Former [2024/08]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
MC22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/37]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SI22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/21]AL22.06.2022
AT22.06.2022
CZ22.06.2022
DK22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/17]AL22.06.2022
AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/12]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
IS22.10.2022
PT24.10.2022
Former [2023/11]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
PL22.06.2022
RO22.06.2022
RS22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
PT24.10.2022
Former [2023/09]AT22.06.2022
CZ22.06.2022
EE22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RO22.06.2022
RS22.06.2022
SK22.06.2022
SM22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
PT24.10.2022
Former [2023/08]AT22.06.2022
ES22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RS22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2023/07]AT22.06.2022
FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RS22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2023/02]FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
NL22.06.2022
RS22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2022/50]FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
RS22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2022/49]FI22.06.2022
HR22.06.2022
LT22.06.2022
LV22.06.2022
BG22.09.2022
NO22.09.2022
GR23.09.2022
Former [2022/47]FI22.06.2022
LT22.06.2022
NO22.09.2022
Cited inInternational search[A]DE4309467  (BOSCH GMBH ROBERT [DE]) [A] 1-15 * the whole document *;
 [A]US2003192751  (COSTA JACK [CA]) [A] 1-15 * paragraphs [0015] , [0016] *;
 [AD]EP2794368  (RENAULT TRUCKS [FR]) [AD] 1-15* the whole document *;
 [A]WO2017017617  (FAIVELEY TRANSPORT ITALIA SPA [IT]) [A] 1-15 * pages 3-5; figure 1 *;
 [A]WO2017060128  (KNORR BREMSE SYSTEME FUER NUTZFAHRZEUGE GMBH [DE]) [A] 1-15 * page 7, line 17 - page 8, line 5; figure 1 *
by applicantEP2794368
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.