EP3631144 - SPINNER TOOL WITH FLOATING CARRIAGE DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.02.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 25.02.2022 | ||
Former | Grant of patent is intended Status updated on 07.07.2021 | ||
Former | Examination is in progress Status updated on 06.11.2020 | ||
Former | Request for examination was made Status updated on 06.03.2020 | ||
Former | The international publication has been made Status updated on 08.12.2018 | ||
Former | unknown Status updated on 08.06.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Forum US, Inc. 10344 Sam Houston Park Dr., Suite 300 Houston, Texas 77064 / US | [2022/27] |
Former [2020/15] | For all designated states Forum US, Inc. 920 Memorial City Way, Suite 1000 Houston, Texas 77024 / US | Inventor(s) | 01 /
VO, Han 18215 E. Morgans Bend Dr. Cypress Texas 77433 / US | [2020/15] | Representative(s) | Lincoln IP 4 Rubislaw Place Aberdeen AB10 1XN / GB | [2022/13] |
Former [2020/15] | Lincoln, Matthew, et al Lincoln IP 9 Victoria Street Aberdeen AB10 1XB / GB | Application number, filing date | 18727569.8 | 09.05.2018 | [2020/15] | WO2018US31807 | Priority number, date | US201715609266 | 31.05.2017 Original published format: US201715609266 | [2020/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018222355 | Date: | 06.12.2018 | Language: | EN | [2018/49] | Type: | A1 Application with search report | No.: | EP3631144 | Date: | 08.04.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.12.2018 takes the place of the publication of the European patent application. | [2020/15] | Type: | B1 Patent specification | No.: | EP3631144 | Date: | 30.03.2022 | Language: | EN | [2022/13] | Search report(s) | International search report - published on: | EP | 06.12.2018 | Classification | IPC: | E21B19/16 | [2020/15] | CPC: |
E21B19/168 (EP,US);
E21B19/161 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | DREHVORRICHTUNG MIT EINER SCHWIMMENDEN GELAGERTEN TRANSPORTANORDNUNG | [2021/27] | English: | SPINNER TOOL WITH FLOATING CARRIAGE DEVICE | [2020/15] | French: | OUTIL DE ROTATION AVEC SUPPORT FLOTTANT | [2021/27] |
Former [2020/15] | SPINNERWERKZEUG MIT SCHWIMMENDER WAGENVORRICHTUNG | ||
Former [2020/15] | OUTIL DE ROTATION AVEC DISPOSITIF DE CHARIOT FLOTTANT | Entry into regional phase | 05.12.2019 | National basic fee paid | 05.12.2019 | Designation fee(s) paid | 05.12.2019 | Examination fee paid | Examination procedure | 05.12.2019 | Examination requested [2020/15] | 05.12.2019 | Date on which the examining division has become responsible | 18.07.2020 | Amendment by applicant (claims and/or description) | 05.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 09.03.2021 | Reply to a communication from the examining division | 08.07.2021 | Communication of intention to grant the patent | 09.12.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 17.02.2022 | Fee for grant paid | 17.02.2022 | Fee for publishing/printing paid | 17.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.01.2023 | No opposition filed within time limit [2023/10] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 17.02.2022 | Request for further processing filed | 17.02.2022 | Full payment received (date of receipt of payment) Request granted | 28.02.2022 | Decision despatched | Fees paid | Renewal fee | 30.03.2020 | Renewal fee patent year 03 | 11.05.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.05.2018 | AL | 30.03.2022 | AT | 30.03.2022 | CY | 30.03.2022 | CZ | 30.03.2022 | DK | 30.03.2022 | EE | 30.03.2022 | ES | 30.03.2022 | FI | 30.03.2022 | HR | 30.03.2022 | IT | 30.03.2022 | LT | 30.03.2022 | LV | 30.03.2022 | MC | 30.03.2022 | MK | 30.03.2022 | PL | 30.03.2022 | RO | 30.03.2022 | RS | 30.03.2022 | SE | 30.03.2022 | SI | 30.03.2022 | SK | 30.03.2022 | SM | 30.03.2022 | TR | 30.03.2022 | IE | 09.05.2022 | LU | 09.05.2022 | FR | 30.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 30.06.2022 | GR | 01.07.2022 | IS | 30.07.2022 | PT | 01.08.2022 | [2024/29] |
Former [2024/24] | HU | 09.05.2018 | |
AL | 30.03.2022 | ||
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
MK | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
FR | 30.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2024/23] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
MK | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
FR | 30.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2024/20] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CY | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
FR | 30.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/35] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
IT | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
FR | 30.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/25] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SI | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
FR | 30.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/22] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
FR | 30.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/20] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
IE | 09.05.2022 | ||
LU | 09.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/09] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
LU | 09.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/08] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
LU | 09.05.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/07] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
DK | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/06] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
MC | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2023/01] | AL | 30.03.2022 | |
AT | 30.03.2022 | ||
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/51] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
IS | 30.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/50] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
PL | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/49] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SK | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/48] | AT | 30.03.2022 | |
CZ | 30.03.2022 | ||
EE | 30.03.2022 | ||
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/47] | AT | 30.03.2022 | |
ES | 30.03.2022 | ||
FI | 30.03.2022 | ||
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RO | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
SM | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
PT | 01.08.2022 | ||
Former [2022/39] | FI | 30.03.2022 | |
HR | 30.03.2022 | ||
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/36] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
LV | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
GR | 01.07.2022 | ||
Former [2022/35] | HR | 30.03.2022 | |
LT | 30.03.2022 | ||
RS | 30.03.2022 | ||
SE | 30.03.2022 | ||
BG | 30.06.2022 | ||
Former [2022/33] | LT | 30.03.2022 | Cited in | International search | [A]US2009211404 (PEDERSEN JAN ERIK [US], et al) [A] 1-10* figures 1A-1F *; | [A]US2009272235 (BERRY JOE [US]) [A] 1-10 * paragraph [0022] - paragraph [0025]; figures 2A,2B *; | [A]WO2016074060 (2056203 ONTARIO INC [CA]) [A] 1-10 * page 9 - page 12; figures 4,5,6A,6B *; | [A]US2016290075 (HUNTER DOUGLAS A [CA]) [A] 1-10 * paragraph [0035] - paragraph [0038]; figures 3-6 * |